1. 26-Aug-2025 02:08 AM 05-Sep-2025 04:09 AM 06-Sep-2025 10:09 AM Tender for Supply of OK Stickers/BL/LC/MAN/OKSTK/LT/202526/0160/22040 Balmer Lawrie and Company Limited --
2. 23-Aug-2025 04:08 AM 05-Sep-2025 04:09 AM 06-Sep-2025 10:09 AM Tender for Fire Hydrant System at Kolkata/BL/LC/MAN/KOLFH1/LT/202526/0156/22031 Balmer Lawrie and Company Limited --
3. 25-Aug-2025 09:00 AM 05-Sep-2025 09:00 AM 06-Sep-2025 09:00 AM Replacement, overhauling of GC-8 Gear coupling tyre coupling 100 unit no. 1406 Loading section at Madhuban Coal Washery under Block-II Area, BCCL./BCCL/B-II/MCW/E-T/25-26/004/2025_BCCL_342291_1 Bharat Coking Coal Limited --
4. 23-Aug-2025 06:00 PM 05-Sep-2025 09:00 AM 06-Sep-2025 10:00 AM Repairing of ACB 200 Amp ABC Make 440Volt Sl No- 317 at BGR Substation KOCP./BCCL/BA-IX/ENM/25-26/070 22/08/2025/2025_BCCL_342273_1 Bharat Coking Coal Limited --
5. 23-Aug-2025 06:00 PM 05-Sep-2025 09:00 AM 06-Sep-2025 10:00 AM Errection of 3.3KV Overhead Line from Dobari Substaion to Dobari Sump for Dewatering Operation under Bera Dobari Colliery, ABDKC./BCCL/BA-IX/ENM/25-26/068 22/08/2025/2025_BCCL_342269_1 Bharat Coking Coal Limited --
6. 25-Aug-2025 09:00 AM 05-Sep-2025 09:00 AM 06-Sep-2025 09:00 AM Upkeepemnt of spilled materials washed coal from unit no. 916 belt area at PS-9 building of Madhuban Coal Washery under Block-II Area, BCCL./BCCL/B-II/MCW/E-T/25-26/003/2025_BCCL_342288_1 Bharat Coking Coal Limited --
7. 23-Aug-2025 06:00 PM 05-Sep-2025 09:00 AM 06-Sep-2025 10:00 AM Replacement of 6/12 Girder 6 No Dismantle Old and Damaged Plate of Pit Top, Dismantle Cage Catcher Cage Catcher Guarder Shifting Winding Engine Headgear Pulley of 01 Pit Victory Section for the Purpose of Lowering 1000 GPM 300HP 200 mtr Head Submer/BCCL/BA-IX/ENM/25-26/071 22/08/2025/2025_BCCL_342275_1 Bharat Coking Coal Limited --
8. 23-Aug-2025 06:00 PM 05-Sep-2025 09:00 AM 06-Sep-2025 10:00 AM Fabrication of 8 Dia Pipe Clamp 70sqmm Cable Clamp Rope Clamp 25mm Dia 8 Dia Pipe Pump Rest Clamp Fabrication of Submersible Pump Safety Cage 15 feet 6 length 22 Diameter for Installation Lowering of Second Pump of 1000GPM 300 HP, 200 Mtr He/BCCL/BA-IX/ENM/25-26/069 22/08/2025/2025_BCCL_342270_1 Bharat Coking Coal Limited --
9. 25-Aug-2025 09:00 AM 05-Sep-2025 09:00 AM 06-Sep-2025 09:00 AM Lifting and lying of broken belt of unit no. 1201 and 1301 belt conveyor and changing of damaged deck plate of same at PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL./BCCL/B-II/MCW/E-T/25-26/002/2025_BCCL_342286_1 Bharat Coking Coal Limited --