Central - Tenders Closing for a specific Date

Report For Day : 11-Sep-2025

Total Tenders : 2722
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
1911. 16-Aug-2025 03:59 PM 11-Sep-2025 03:00 PM 11-Sep-2025 03:00 PM South Central Railway-CPOH-RYP - Creation/Augmentation of intermediate overhauling/periodic overhauling facilities for track machines (Umbrella work 2024-25)- Provision of coach stabling line and improvements to store sheds and offices & provision of Surface travers and supply of Synchronized jacks of 35Ton Capacity at CPOH/RYP./E-05-CPOH-RYP-2025/83744655 Ministry of Railways --
1912. 18-Aug-2025 03:38 PM 11-Sep-2025 03:00 PM 11-Sep-2025 03:00 PM Revamping & Up-gradation of sand coating plant of complete sand system in mould room at RWP/Bela./SCP-25RT/83731202 Ministry of Railways --
1913. 18-Aug-2025 06:53 PM 11-Sep-2025 03:00 PM 11-Sep-2025 03:00 PM BG TTR(P) of the existing 1 in 12 (FS) by 1 in 12 (TWS) Pt. No. 101, 102, 103, 104, 111, 112, 113, 114, 201 at ADQ Yard, Pt. No. 101, 102, 103, 104, 111, 112, 113, 114 at TKG, Pt. No. 121 at AUB, Pt No. 103, 101, 111, 113 at NAK Yard, Pt. No. 103, 101, 111, 113 BORA Yard (Total = 26 Sets), BG TTR(P) of the existing 1 in 8.5 (FS) by 1 in 8.5 (TWS) Pt. No. EMD-1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21 at SGUJ Yard, Pt. No. 105, 115, 117 at BORA Yard (Total = 24 Se/06-KIR-Engg-47-2025/83443000 Ministry of Railways --
1914. 18-Aug-2025 06:52 PM 11-Sep-2025 03:00 PM 11-Sep-2025 03:00 PM BG TBTR of existing steel channel sleeper by H. Beam sleeper of Br. No. 1 (95 sleeper), 5 (134 sleeper), 8 (95 sleeper), 16 (134 sleeper), 23 (95 sleeper), 24 (95 sleeper) between SGUJ-BORA section. ( Total = 648 Nos.)/07-KIR-Engg-47-2025/83442614 Ministry of Railways --
1915. 18-Aug-2025 06:52 PM 11-Sep-2025 03:00 PM 11-Sep-2025 03:00 PM Track maintenance work and other ancillary work for the period of 2 years from Km 53.00 to 107.00 betweeen ARR-TKG section./05-KIR-Engg-47-2025/83426752 Ministry of Railways --
1916. 18-Aug-2025 06:51 PM 11-Sep-2025 03:00 PM 11-Sep-2025 03:00 PM Track maintenance work and other ancillary work for the period of 2 years from Km 0.00 to 53.00 between ARR-TKG section./04-KIR-Engg-47-2025/83424624 Ministry of Railways --
1917. 19-Aug-2025 04:58 PM 11-Sep-2025 03:00 PM 11-Sep-2025 03:00 PM Loading unloading and Transportation of Released IPS set with Released Batteries from 25 Stations in section AII-COR-UDZ of Ajmer Division to General Store Ajmer, in Connection with- S&T work Replacement of over aged IPS in AII-COR-UDZ section over Ajmer Division of NWR ./SNT-GSU-AII-2025-26-04R/83812271 Ministry of Railways --
1918. 19-Aug-2025 04:48 PM 11-Sep-2025 03:00 PM 11-Sep-2025 03:00 PM Operation of PU Paint Booth along with baking oven for all types of coaches at C&W Workshop, N.F. Railway, New Bongaigaon/IMF-MP-PLG-NBQS-581/83809912 Ministry of Railways --
1919. 19-Aug-2025 11:18 AM 11-Sep-2025 03:00 PM 11-Sep-2025 03:00 PM HELMET HEAD GEAR./12251732A/106799447 Ministry of Railways --
1920. 19-Aug-2025 04:30 PM 11-Sep-2025 03:00 PM 11-Sep-2025 03:00 PM S&T work in connection with Setting up of Train Set maintenance facility at Jheel Siding Coaching Depot Howrah, Eastern Railway./DCPM-SNT-RSP-HWH-TSM-01-2/83802441 Ministry of Railways --