Central - Tenders Closing for a specific Date

Report For Day : 16-Sep-2025

Total Tenders : 2182
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
921. 18-Aug-2025 04:45 PM 16-Sep-2025 02:00 PM 16-Sep-2025 02:00 PM Battery Box complete for 1100 AH Battery for RMPU Coaches as per ICF DRG No. ICF/SK-7-1-479 ALT-t (Col-I)./45251641/106799279 Ministry of Railways --
922. 01-Sep-2025 02:17 PM 16-Sep-2025 02:00 PM 16-Sep-2025 02:00 PM Running Contract for Tab. Desidustat 50 mg./HB256157C/106813958 Ministry of Railways --
923. 01-Sep-2025 05:47 PM 16-Sep-2025 02:00 PM 16-Sep-2025 02:00 PM Supply, installation, testing & commissioning of Split AC,/40255444/106814468 Ministry of Railways --
924. 06-Sep-2025 12:43 PM 16-Sep-2025 02:00 PM 16-Sep-2025 02:00 PM Supply, Installation & commissioning of Manual operated scissor lift platform, capacity 500 kg./AA255069/106819499 Ministry of Railways --
925. 01-Sep-2025 01:45 PM 16-Sep-2025 02:00 PM 16-Sep-2025 02:00 PM Running Contract for Tab. Dienogest 2 mg in strip packing./HB256443A/106813910 Ministry of Railways --
926. 01-Sep-2025 12:57 PM 16-Sep-2025 02:00 PM 16-Sep-2025 02:00 PM Heavy duty high tenacity 100 Percent polyester nylon endless round sling of SWL 05 Ton with proof load 10 ton suitable for lifting the wheel with EWL 10 feet. The sling should be covered with nylon Convermex cover which is 4 times more anti abrasive as protection conforming to EN-1492-2.2000./AA255118/106813781 Ministry of Railways --
927. 01-Sep-2025 06:43 PM 16-Sep-2025 02:00 PM 16-Sep-2025 02:00 PM Supply and Installation of Heavy Duty Industrial Rack./IG256323A/106813620 Ministry of Railways --
928. 01-Sep-2025 05:51 PM 16-Sep-2025 02:00 PM 16-Sep-2025 02:00 PM Supply, installation, testing & commissioning of Split AC/40255443/106814472 Ministry of Railways --
929. 01-Sep-2025 12:46 PM 16-Sep-2025 02:00 PM 16-Sep-2025 02:00 PM ESTI EXCESS TEMPERATURE PROTECTOR etc/AD255474A/106812727 Ministry of Railways --
930. 04-Sep-2025 04:11 PM 16-Sep-2025 02:00 PM 16-Sep-2025 02:00 PM Refilling of cylinder with Ultra Pure IOLAR grade-II Nitrogen gas in 47 liters water capacity cylinder which contain 7 cum of gas in each cylinder. Note: (i) Delivery period shall be 18 months from PO issue date. (ii) Delivery may be in part as and when required and by the supplier. (iii) Gas purity certificate & explosive certificate for cylinder from NABL certificate lab is must./EA255228A/106818074 Ministry of Railways --