Central - Tenders Closing for a specific Date

Report For Day : 22-Sep-2025

Total Tenders : 2380
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
521. 02-Sep-2025 10:17 AM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM -BRACKET FOR MOUNTING S-TRAP/61256453/106814699 Ministry of Railways --
522. 05-Aug-2025 04:09 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM YAW DAMPER for LHB Coaches./07253461/106787371 Ministry of Railways --
523. 30-Aug-2025 01:03 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM Astronomical Time switch/86256890A/106812899 Ministry of Railways --
524. 05-Aug-2025 04:08 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM AXLE BOX HOUSING (Finish Machined)/07251067/106787339 Ministry of Railways --
525. 02-Sep-2025 03:50 PM 22-Sep-2025 11:00 AM 23-Sep-2025 11:00 AM EMPANELMENT OF SERVICE PROVIDER FOR Providing of Technology and Marketing Service for EMBA and PGDM of IIM Jammu/IIMJ/NIT/EMBA/2025-26/07/2025_IIMJ_875713_1 Indian Institute of Management Jammu --
526. 01-Jul-2025 07:46 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM Modified Roller Type Safety Bracket./09252313/106732347 Ministry of Railways --
527. 22-Aug-2025 07:00 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:30 AM Isolator package ISO 04 associated with Bulk procurement LOT 3 for Substation Equipment for implementation of Bay Extension work/CC/NT/G-MISC/DOM/A00/25/11126/26267 Power Grid Corporation of India Limited --
528. 28-Aug-2025 06:42 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM Rebuilding of DN line RCC slab Bridge No.56 (Size 2x3.02m) at Km.284/200-300 between JRU-SLU station in JRU-KJG section SW-1: Rebuilding of DN line RCC slab Bridge No.56 (Size 2x3.02m) at Km.284/200-300 between JRU-SLU station in JRU-KJG section SW-2: Launching of pre-cast RCC Box segments on DN line only (RCC Box size 2x2.875x1.35m) for Bridge No.56 at Km.284/200-300 between JRU-SLU station in JRU-KJG section/24MYS25of28-08-25itemno6/83855263 Ministry of Railways --
529. 28-Aug-2025 06:35 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM Birur - Shunting neck of 750m towards DRU end by extending the existing siding on Road-4 at Birur station. SW-I: Earth work for formation SW-II : Track linking Works SW-III Side drain - 750m SW-IV : Construction of Retaining wall - 700m/24MYS25of28-08-25itemno5/83874319 Ministry of Railways --
530. 02-Sep-2025 10:20 AM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM S.S.Hose Clamp/61256454/106814697 Ministry of Railways --