Central - Tenders Closing for a specific Date

Report For Day : 22-Sep-2025

Total Tenders : 2380
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
531. 03-Jun-2025 11:53 AM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM LOCTITE-55/31252976/106713041 Ministry of Railways --
532. 02-Sep-2025 12:38 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM Control Unit NU6/94255575/106814921 Ministry of Railways --
533. 05-Aug-2025 04:09 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM YAW DAMPER for LHB Coaches./07253461/106787371 Ministry of Railways --
534. 05-Aug-2025 04:08 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM AXLE BOX HOUSING (Finish Machined)/07251067/106787339 Ministry of Railways --
535. 18-Jul-2025 06:10 PM 22-Sep-2025 11:00 AM 23-Sep-2025 11:00 AM Construction of 4 Lane with PS Idar-Badoli bypass section from Design km 81/300 to km 95/500 of NH 168-G in the State of Gujarat (Total length 14.200 km) on EPC mode./RW/NH-12014/155/2024/GJ/Zone-V/2025_MoRTH_869625_1 Ministry of Road Transport and Highways icon image
536. 22-Aug-2025 07:00 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:30 AM Isolator package ISO 04 associated with Bulk procurement LOT 3 for Substation Equipment for implementation of Bay Extension work/CC/NT/G-MISC/DOM/A00/25/11126/26267 Power Grid Corporation of India Limited --
537. 02-Sep-2025 01:57 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM Scrapper Mat for toilets of LHB coaches/93255878/106814905 Ministry of Railways --
538. 11-Jun-2025 10:32 AM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM END FRAME DE ASSEMBLY (MACHINED) WITH AIR OUTLET NET FOR TRACTION MOTOR TYPE 6FRA 6068 OF WAP- 7/WAG9 LOCO AS PER CLW DRG. NO. 1TWD.096.005 ALT-11(Ref.4) AND CLW SPEC. NO. SPEC NO. 4TMS.096.068 REV-2 ALT -1 AND RDSO STR NO. RDSO/2007/EL/STR/0021 Rev. 1./19250808/106718971 Ministry of Railways --
539. 02-Sep-2025 01:24 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM GASKET ARMOURED/64255166/106815136 Ministry of Railways --
540. 28-Aug-2025 06:35 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM Birur - Shunting neck of 750m towards DRU end by extending the existing siding on Road-4 at Birur station. SW-I: Earth work for formation SW-II : Track linking Works SW-III Side drain - 750m SW-IV : Construction of Retaining wall - 700m/24MYS25of28-08-25itemno5/83874319 Ministry of Railways --