Central - Tenders Closing for a specific Date

Report For Day : 06-Oct-2025

Total Tenders : 4131
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
3511. 03-Sep-2025 03:21 PM 06-Oct-2025 03:00 PM 06-Oct-2025 03:00 PM Yelahanka - Chintamani section: Cess repair and widening of formation of isolated locations for a length of 13.55 km from 1/600 to 75/200 (SL) in SSE/PWAY/YNK section. Maintenance period is 6 months or one monsoon period whichever is later./20SBC25OF03-09-25ITEM-06/83937422 Ministry of Railways --
3512. 03-Sep-2025 03:15 PM 06-Oct-2025 03:00 PM 06-Oct-2025 03:00 PM SW I : Bengaluru - Sampige road section : Construction of RCC drain for a length of 1500m and Ballast retaining wall for a length of 1000m in connection with the work of Complete Track Renewal (P) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90UTS rails and 60kg wider based sleeper of 1660/km for a length of 19.4 Tkm from km 49/000-68/400 DN line in ADEN/YPR section. SW II : Bengaluru - Sampige road section : Construction of drain for a length of 750m and Ballast retaining wall/20SBC25OF03-09-25ITEM-05/83934649 Ministry of Railways --
3513. 03-Sep-2025 01:54 PM 06-Oct-2025 03:00 PM 06-Oct-2025 03:00 PM Bengaluru - Sampige road sec: Construction of RCC side drain for a length of 8240m in connection with the work of Complete Track Renewal (P) of existing 52kg rails on 60kg PSC of 1540 nos/km with 60kg/90 UTS rails and 60kg wider base sleeper of 1660/km for a length of 21.35 km from km 17/650 - 39/000 up line in ADEN/Yesvanthpur section. Maintenance period is 6 months/20SBC25OF03-09-25ITEM-04/83934025 Ministry of Railways --
3514. 03-Sep-2025 01:50 PM 06-Oct-2025 03:00 PM 06-Oct-2025 03:00 PM Bengaluru - Dharmavaram section: Construction of precast RCC drain in between tracks for 4.5 kms at isolated locations between 128/700-134/700 between Rangepalli (REPI) - Penukonda (PKD) in SSE/PWAY/PKD section. Maintenance period is 6 months/20SBC25OF03-09-25ITEM-03/83933134 Ministry of Railways --
3515. 03-Sep-2025 01:40 PM 06-Oct-2025 03:00 PM 06-Oct-2025 03:00 PM Chikka Banavara - Hassan section : Strengthening of bank by providing standard width and improving drainage at isolated locations from 3/870 to 79/530 (SL) for a length of 16.65 km. Maintenance period is 6 months or one monsoon period whichever is later./20SBC25OF03-09-25ITEM-01/83922690 Ministry of Railways --
3516. 20-Sep-2025 01:19 PM 06-Oct-2025 03:00 PM 06-Oct-2025 03:00 PM Ultrasound Bone Densitometer ( Portable)/07255469B/106824407 Ministry of Railways --
3517. 11-Sep-2025 09:22 PM 06-Oct-2025 03:01 PM 06-Oct-2025 03:02 PM Road Transportation of Bulk Base Oils and Bulk Products from BPCL Wadi Lube/C Lube/Mumbai Refinery/MOT/Pirpav to BPCL LOBP Rasayani and from BPCL Wadi lube/C-Lube/LOBP Rasayani to BPCL LOBP Budge Budge./1000000000BPCL/LUBE/BULK BASE OIL/WADILUBE/2025-28/2025_BPCL_22290 Bharat Petroleum Corporation Limited icon image
3518. 29-Sep-2025 03:16 PM 06-Oct-2025 03:03 PM 06-Oct-2025 03:30 PM 05/AE(E)-IV/DED-202/2025-26/05/AE(E)-IV/DED-202/2025-26/128496 Central Public Works Department (CPWD) --
3519. 06-Oct-2025 09:00 AM 06-Oct-2025 03:17 PM 06-Oct-2025 03:47 PM Biennial job contract for deployment of truck mounted water tanker from ramp area to loading points and other area in V4A and V4B at Baliyari/9900309966/NTPC_R3_0000121856 NTPC Limited --
3520. 29-Sep-2025 03:27 PM 06-Oct-2025 03:25 PM 06-Oct-2025 03:30 PM 54/DD/HD-1/2025-26/1/54/DD/HD-1/2025-26/1/128501 Central Public Works Department (CPWD) --

Note : For more details and clarifications, please refer to the respective Portal.