Central - Tenders Closing for a specific Date

Report For Day : 15-Oct-2025

Total Tenders : 1382
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
91. 15-Sep-2025 12:36 PM 15-Oct-2025 10:30 AM 15-Oct-2025 10:30 AM Modified coach watering inlet (connector) with strainer and Modified Coach Water Filling Connector with Clamp./L8256474/106827952 Ministry of Railways --
92. 22-Sep-2025 10:00 AM 15-Oct-2025 10:30 AM 15-Oct-2025 10:30 AM Lead Acid Low Maintenance Secondary cells 2V 300 Ah/56251085A/106827883 Ministry of Railways --
93. 22-Sep-2025 05:27 PM 15-Oct-2025 10:30 AM 15-Oct-2025 10:30 AM TAB./CAP. NITROGLYCERINE SR 2.5/2.6 MG/08255234B/106836165 Ministry of Railways --
94. 15-Sep-2025 12:16 PM 15-Oct-2025 10:30 AM 15-Oct-2025 10:30 AM Primary rubber pad height measurement gauge and Primary metal bump stop height measurement gauge./L8256472/106827868 Ministry of Railways --
95. 15-Sep-2025 01:37 PM 15-Oct-2025 10:30 AM 15-Oct-2025 10:30 AM Valve spindle gland to IRS Drg. No-W/TF-2150, Alt. Nil./L8256482/106828167 Ministry of Railways --
96. 18-Sep-2025 01:24 PM 15-Oct-2025 10:30 AM 15-Oct-2025 10:30 AM Ring for Direct Mounted Roller Bearing Arrangement/30251402/106817837 Ministry of Railways --
97. 18-Sep-2025 01:21 PM 15-Oct-2025 10:30 AM 15-Oct-2025 10:30 AM Acetal Guide Ring for axle box guide arrangement/30251474/106817836 Ministry of Railways --
98. 11-Sep-2025 05:37 PM 15-Oct-2025 10:45 AM 15-Oct-2025 10:45 AM Male Elbow connector 1/2 OD X 1/2 BSPT (M) with double ferrule as per Drg No-ICF/STD-3-5-023, Alt-J, item No-6./62255292/106825177 Ministry of Railways --
99. 11-Sep-2025 05:38 PM 15-Oct-2025 10:45 AM 15-Oct-2025 10:45 AM Male Elbow connector 1/2 OD X 1/4 BSPT as per Drg. No-ICF/STD-3-5-023,Alt-J, item No-14./62255293/106825180 Ministry of Railways --
100. 11-Sep-2025 05:42 PM 15-Oct-2025 10:45 AM 15-Oct-2025 10:45 AM Double Ferrule fitting straight union size 3/8 both size cone and nut , Material :-Stainless Steel. Note:-Sample to be got to be approved by consignee before bulk supply./62255294/106825181 Ministry of Railways --

Note : For more details and clarifications, please refer to the respective Portal.