Central - Tenders Closing for a specific Date

Report For Day : 20-Oct-2025

Total Tenders : 613
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
411. 17-Sep-2025 05:45 PM 20-Oct-2025 03:00 PM 20-Oct-2025 03:00 PM Construction of EI Building & Goomties for Replacement of old Electronic Interlocking with new Electronic Interlocking at Shyamchak, Balichak, Haur, Bhogpur, Fuleshwar and Mourigram Flyover Block Hut. It also consists of construction of concrete cable duct at some area of these stations along with NALR, ULB, BZN & BOP in Kharagpur Division./ST-PROJ-KGP-BUILDING-6EI/84100543 Ministry of Railways --
412. 26-Sep-2025 06:56 PM 20-Oct-2025 03:00 PM 20-Oct-2025 03:00 PM Supply and Transportation of welding portions of Fusion welding of 60 Kg/60 EI-R260 grade rails on cess/ track free of traffic condition by Alumino Thermic process into short welded panels or other wise with RDSO approved welding portions & techniques under Sr. Divisional Engineer (South)/ Waltair./eT-WAT-South-22-2025/82835631 Ministry of Railways --
413. 15-Sep-2025 10:37 AM 20-Oct-2025 03:00 PM 20-Oct-2025 03:00 PM 21.6/30.24 MVA, 220kv/27Kv, 50HZ, Single Phase, ONAN/ONAF type Traction Power Transformer./04255104/106822449 Ministry of Railways --
414. 15-Sep-2025 12:00 PM 20-Oct-2025 03:00 PM 20-Oct-2025 03:00 PM 4 CORE x 150 sqmm 1.1 KV XLPE insulation armoured Aluminium UG cable as per TPCODL Specification: ENG- LV-30001./04255084/106804220 Ministry of Railways --
415. 19-Sep-2025 11:04 AM 20-Oct-2025 03:00 PM 20-Oct-2025 03:00 PM 11KV, 3Core, 300sqmm XLPE insulation armoured UG cable (SC rating of cable in kA-28.3kA and SC rating of Armour in kA-15kA) as per TPCODL SPECIFICATION:ENG- HV-20062./04255107/106813581 Ministry of Railways --
416. 22-Sep-2025 04:24 PM 20-Oct-2025 03:30 PM 20-Oct-2025 03:30 PM GNT Division - 1) GNT-NDKD: Proposal for construction of RUB in lieu of LC No.07 at Km 10/5-6 between Nallapadu - Bandarupalli stations 2) GNT-KCC: Proposal for construction of RUB in lieu of LC No.10 at Km 15/27-29 between Nambur and Mangalagiri stations and 3) Nallapadu-Nandyal: Proposed construction of RUB in lieu of LC No. 268 at km 73/1-2 between Savalyapuram-Vinukonda stations - OHE modifications/GNT-E-17-TRD-2025-26/84356705 Ministry of Railways --
417. 05-Sep-2025 10:00 AM 20-Oct-2025 03:30 PM 21-Oct-2025 03:30 PM EOI for transport tender ex Vasco /ZIAVPL Goa/MSO/OPS/POL/EOI/2026-31/Vasco/2025_MSO_186596_1 IndianOil icon image
418. 30-Sep-2025 03:30 PM 20-Oct-2025 03:30 PM 21-Oct-2025 04:30 PM SUPPLY AND APPLY OF PAINT ON STRUCTURAL STEEL IN BOILER AND ITS/NTPC/USSC-CPG1/9900310985/2025_NTPC_100668_1 NTPC Limited --
419. 22-Sep-2025 04:16 PM 20-Oct-2025 03:30 PM 20-Oct-2025 03:30 PM Name of the work: 1) GNT-KCC section: Construction of 4-lane ROB in lieu of LC No. 03 at Km 3/25-27 between Guntur-Nambur stations 2) GNT-NDKD: Construction of 2-lane ROB in lieu of LC No.06 at KM 9/13-14 in Nallapadu-Bandarupalli stations 3) GNT-NDKD: Construction of 2-lane ROB in lieu of LC No.27 at KM 29/13-14 in Pedakurapadu station yard 4) GNT-NDKD: Construction of 2-lane ROB in lieu of LC No.40 at KM 42/29-30 between Sattenapalli - Reddigudem stations 5)GNT-NDKD: Construction of 2-lane R/GNT-E-16-TRD-2025-26/84020922 Ministry of Railways --
420. 22-Sep-2025 04:05 PM 20-Oct-2025 03:30 PM 20-Oct-2025 03:30 PM GNT Division -Replacement of existing Steel Girders with PSC slabs for 35 Bridges - Modifications to OHE/GNT-E-15-TRD-2025-26/84289386 Ministry of Railways --

Note : For more details and clarifications, please refer to the respective Portal.