Central - Tenders Closing for a specific Date

Report For Day : 18-Nov-2025

Total Tenders : 2446
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
471. 07-Nov-2025 06:00 PM 18-Nov-2025 11:00 AM 19-Nov-2025 11:00 AM A)Repairing of sprocket drum assembly and replacement of floating seal, TC gasket and transmission seal and (B)Repairing of equalizer bar, transmission and engine guard of BD-355 Dozer SL No. T-11592 at Kathara Washery/PO/KTW/EnM/eTen/25-26/90 Dated-06.11.2025/2025_CCL_346929_1 Central Coalfields Limited --
472. 11-Nov-2025 10:21 AM 18-Nov-2025 11:00 AM 18-Nov-2025 11:00 AM NEPAFENAC 1 MG PER ML EYE DROPS 5 ML/CH255648/106880362 Ministry of Railways --
473. 07-Nov-2025 06:00 PM 18-Nov-2025 11:00 AM 19-Nov-2025 11:00 AM Approach road and drain from main road near Manoj house to Tulsi house at Bijain R and R site under Ashok OCP, Piparwar Area./GM(PPR)/Civil/E-tender/2025-26 /1670/2025_CCL_346995_1 Central Coalfields Limited --
474. 08-Nov-2025 09:36 AM 18-Nov-2025 11:00 AM 18-Nov-2025 11:00 AM (AMI No.23.NI0022 / 2025-26) collinear reduction clamp (As per attached specification)/82259983/106877544 Ministry of Railways --
475. 11-Nov-2025 10:22 AM 18-Nov-2025 11:00 AM 18-Nov-2025 11:00 AM MONTELUKAST 10 MG AND LEVOCETIRIZINE 5 MG ORAL TABLET/CH255649/106880366 Ministry of Railways --
476. 07-Nov-2025 06:00 PM 18-Nov-2025 11:00 AM 19-Nov-2025 11:00 AM (A)Repairing assembling of old bunker D/chute and gate of unit No. 912 and Pneumatic gate of unit 04 middling side B)Repairing for receiving chute its channel angle, plate etc of unit No. 949 in RLB section at Kathara Washery/PO/KTW/EnM/eTen/25-26/89 Dated-06.11.2025/2025_CCL_346928_1 Central Coalfields Limited --
477. 07-Nov-2025 06:00 PM 18-Nov-2025 11:00 AM 19-Nov-2025 11:00 AM A)Repairing and overhauling of (02 Nos.) Vertical Pump 361-T in Hydro Cyclone Section and (B) Repairing and overhauling of (03 Nos.) Submersible Pump 5 H.P with motor in Hydro Cyclone Section of Kathara Washery/PO/KTW/EnM/eTen/25-26/88 Dated-06.11.2025/2025_CCL_346927_1 Central Coalfields Limited --
478. 12-Nov-2025 05:30 PM 18-Nov-2025 11:00 AM 19-Nov-2025 11:30 AM Day to day maintenance work for Admin building, hostel building and staff quarters etc (from NOV , 25 to May 26) at RAKNPA, Ghaziabad./24/AE-VI/PCSD/NIT/2025-26/2025_DOP_885297_1 Department of Posts --
479. 07-Nov-2025 06:00 PM 18-Nov-2025 11:00 AM 19-Nov-2025 11:00 AM i)Repairing and overhauling of head drum size 1150 x 800 x 10mm and tail drum size 1150 x 400 x 10mm and (ii)repairing of head and tail drum shaft of Unit No. 267 B/C in HMS Section of Kathara Washery/PO/KTW/EnM/eTen/25-26/87 Dated-06.11.2025/2025_CCL_346926_1 Central Coalfields Limited --
480. 04-Nov-2025 06:00 PM 18-Nov-2025 11:00 AM 18-Nov-2025 11:30 AM Construction of ICAI Bhawan - Raipur Situated at plot no. A-130, Sector-11A. kamal Vihar, Raipur for The Institute of Chartered Accountants of India (ICAI) Bhawan at Raipur (CG)/NBCC/SBG/etender/2025/167/2025_NBCC_817907_1 National Buildings Construction Corporation Limited --

Note : For more details and clarifications, please refer to the respective Portal.