Central - Tenders Closing for a specific Date

Report For Day : 16-Dec-2025

Total Tenders : 2607
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
2301. 03-Dec-2025 06:55 PM 16-Dec-2025 05:00 PM 17-Dec-2025 05:00 PM Supply, Installation and Comprehensive Maintenance (02 Years ) of 2 Nos. Electro Magnetic flow meter ( 01 Nos. 150 mm and 01 Nos. 200 mm)/DCH/SO(C)/2025-26/ETN-37 Dated 03.12.2025/2025_NCL_348682_1 Northern Coalfields Limited --
2302. 03-Dec-2025 10:35 AM 16-Dec-2025 05:00 PM 17-Dec-2025 05:00 PM Repair and Maintenance of Civil Works at Paradip Refinery and Petrochemical Complex, Paradip, Odisha./9070C25D13/2025_PDR_187809_1 IndianOil --
2303. 25-Nov-2025 05:00 PM 16-Dec-2025 05:00 PM 17-Dec-2025 05:00 PM Fire Alarm integration of PADC Paradip with Paradip Refinery and post warranty AMC (PWAMC) of fire alarm system at PADC Paradip on single tender basis./BD/CONT/25-26/1108/2025_BD_187715_1 IndianOil icon image
2304. 25-Nov-2025 10:00 AM 16-Dec-2025 05:30 PM 18-Dec-2025 11:30 AM One Time Improvement of NH 57 Laying of 40mm thick BC from Km. 294.400 to 299.900 Km. of Khordha Town./04 CCE NH NORTHERN of 2025 26/2025_MoRTH_886880_1 Ministry of Road Transport and Highways icon image
2305. 09-Sep-2025 06:55 PM 16-Dec-2025 05:30 PM 18-Dec-2025 12:30 PM Balance work for rehabilitation and upgradation of Sidhi -Singrauli Road from Km 82/400 to Km 187/99 (Design Length 105.59 Km) of NH-39 (Old NH-75E) to four lane with paved shoulder in the State of Madhya Pradesh on Item Rate Mode./RO/BPL/Tender/10/2025-26/2025_MoRTH_876668_1 Ministry of Road Transport and Highways icon image
2306. 04-Nov-2025 04:00 PM 16-Dec-2025 05:30 PM 18-Dec-2025 11:00 AM Consultancy Services for Preparation of Detailed Project Report of 5.0 km with approaches (Standalone Bridge Project) of Parshuram Ghat section (Realignment ) on Panvel-Mahad-Panji Road NH-66 (4L-6L-PS) in the State of Maharashtra/No.NHD/PEN/AB/TC/2788/2025-26 Dated 04.10.2025/2025_MoRTH_884089_1 Ministry of Road Transport and Highways icon image
2307. 25-Nov-2025 10:00 AM 16-Dec-2025 05:30 PM 18-Dec-2025 11:30 AM STMC estimate from Km. 250.948 to 262.948 Km. 265.598 to 271.968 Km. and 272.168 to 274.738 Km. of NH 20 Pkg.1./05 CCE NH NORTHERN of 2025 26/2025_MoRTH_886850_1 Ministry of Road Transport and Highways --
2308. 17-Nov-2025 06:23 PM 16-Dec-2025 05:30 PM 16-Dec-2025 05:30 PM Conversion of CBC coupler uncoupling arrangement from bottom operated to top operated system in Locos as per RDSO modification sheet no. RDSO / 2016 /EL / MS /0454 Rev 0 dated 29/04/2016 at Loco Shed, Malda./DLSMLDTNFR04A2025-2026/85558166 Ministry of Railways --
2309. 12-Aug-2025 06:00 PM 16-Dec-2025 05:30 PM 17-Dec-2025 05:30 PM DESIGN, SUPPLY AND CONSTRUCTION OF SHORE PROTECTION WORK WITH U TYPE HOT ROLLED STEEL SHEET PILE AND OTHER ANCILLARY WORK IN CONNECTION WITH CONSTRUCTION OF SHORE PROTECTION AGAINST MASSIVE EROSION TO SAVE CENTURY OLD IGWTP OF M/S KMC/B AND R/HO/71094/TD/BALANCE SHORE PROTECTION/01/2025_BandR_873062_1 Bridge and Roof Company (India) Limited icon image
2310. 11-Dec-2025 05:00 PM 16-Dec-2025 05:30 PM 18-Dec-2025 02:00 PM CAMC for Data Centre./19(06)2025-PUR/SE/2025_CSIR_258774_1 Council of Scientific and Industrial Research --

Note : For more details and clarifications, please refer to the respective Portal.