Central - Tenders Closing for a specific Date

Report For Day : 09-Mar-2026

Total Tenders : 3659
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
51. 25-Feb-2026 06:00 PM 09-Mar-2026 10:00 AM 10-Mar-2026 11:00 AM Dismantling, repairing, commissioning of old pontoons and its pathway for Monsoon 2026 at Block-B Project./NCL/BB/EnM/Tender/25-26/26 dt. 23.02.2026/2026_NCL_354201_1 Northern Coalfields Limited --
52. 25-Feb-2026 06:00 PM 09-Mar-2026 10:00 AM 10-Mar-2026 11:00 AM Supply, installation, testing, commissioning, repair and Maintenance of HT Gang Operated Air Break Switches and overhead line maintenance works during monsoon 2026 at Block-B Project./NCL/BB/EnM/Tender/25-26/24 dt. 22.02.2026/2026_NCL_354140_1 Northern Coalfields Limited --
53. 25-Feb-2026 06:00 PM 09-Mar-2026 10:00 AM 10-Mar-2026 11:00 AM Cleaning of sub-station yard, Trimming of tree branches and bushes around and under overhead line (33KV, 6.6KV, 3.3KV, 440V, 220V) and dispose throw it up at suitable place pre and during monsoon period at Block-B mines/NCL/BB/EnM/Tender/25-26/28 dt. 23.02.2026/2026_NCL_354242_1 Northern Coalfields Limited --
54. 25-Feb-2026 06:00 PM 09-Mar-2026 10:00 AM 10-Mar-2026 11:00 AM Assistance required for attending the fault in the backshift as and when required during monsoon for the period of 120 days at Block-B Project./NCL/BB/EnM/Tender/25-26/30 dt. 24.02.2026/2026_NCL_354336_1 Northern Coalfields Limited --
55. 25-Feb-2026 06:00 PM 09-Mar-2026 10:00 AM 10-Mar-2026 11:00 AM (A) Lifting and lowering of 02 Nos. submersible pump with 6 inch dia 14 Nos pipes at K.T. Pump (B)Cutting old and used iron materials from old Transformer shed structure at KT substation for making a new shed at Paharigora (Size 17 ft Long X 15 ft wi/BCCL/LA/EnM/F-19/25-26/171/2026_BCCL_354530_1 Bharat Coking Coal Limited --
56. 25-Feb-2026 06:00 PM 09-Mar-2026 10:00 AM 10-Mar-2026 11:00 AM Fabrication of universal joints for floating pumps, repairing of NRV/Foot valve/ Sluice valves of different sizes , bends and strainers for Monsoon 2026 at Block-B project/NCL/BB/EnM/Tender/25-26/27 dt. 23.02.2026/2026_NCL_354234_1 Northern Coalfields Limited --
57. 25-Feb-2026 06:00 PM 09-Mar-2026 10:00 AM 10-Mar-2026 11:00 AM Assistance for shifting of Electrical and Mechanical installations during monsoon 2026 at Block-B Project./NCL/BB/EnM/Tender/25-26/29 dt. 24.02.2026/2026_NCL_354333_1 Northern Coalfields Limited --
58. 25-Feb-2026 06:00 PM 09-Mar-2026 10:00 AM 10-Mar-2026 11:00 AM Repairing of field switches and HT starters for monsoon 2026 at Block-B Project/NCL/BB/EnM/Tender/25-26/25 dt. 23.02.2026/2026_NCL_354173_1 Northern Coalfields Limited --
59. 25-Feb-2026 10:30 AM 09-Mar-2026 10:00 AM 09-Mar-2026 11:00 AM E4753059/E4753059/2026_BHEL_58711_1 Bharat Heavy Electricals Limited --
60. 25-Feb-2026 12:00 PM 09-Mar-2026 10:00 AM 10-Mar-2026 10:00 AM Supply and Installation of Forensic Workstation with Software/pur/CoE-FAFI-3/ForensicWS/26/2026_NFSU_900177_1 National Forensic Sciences University --

Note : For more details and clarifications, please refer to the respective Portal.