Central - Tenders Closing for a specific Date

Report For Day : 17-Apr-2026

Total Tenders : 1360
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
951. 25-Mar-2026 03:33 PM 17-Apr-2026 03:00 PM 17-Apr-2026 03:00 PM Annual Maintenance contract of 500 KVA High capacity M/s Kirloskar (KOEL) make DA set of power car for a period of two years./JBP-LT-No-49-2025R/88323857 Ministry of Railways --
952. 25-Mar-2026 09:06 PM 17-Apr-2026 03:00 PM 17-Apr-2026 03:00 PM Engineering, Procurement and Construction (EPC) of Supply, installation, testing commissioning and handing over of 11/0.430Kv substations at South and North side of NJP Station along with provision of HT Cables, LT Cables, HT/LT Switch gears and supply to LT Panels of individual service building/platforms like departure terminal, arrival terminal, podium and surface parking, all platforms and Circulating area etc, Provision of 4x2250kva DG Set along with 20KL UG HSD Storage tank, provisi/EL-C-NJP-03-25-26-NJP-WCS/88343188 Ministry of Railways --
953. 25-Mar-2026 06:14 PM 17-Apr-2026 03:00 PM 17-Apr-2026 03:00 PM All In Service Comprehensive AMC of 02 nos. Schindler Lifts at Bungalow No.19 & Central Hospital, S.E. Rly, GRC for 05(five) years./ADEE-AMCLIFT-19-CH-26-R3/88347423 Ministry of Railways --
954. 25-Mar-2026 07:14 PM 17-Apr-2026 03:00 PM 17-Apr-2026 03:00 PM Comprehensive Annual maintenance contract of 25 KVA M/s Hind Rectifier make inverters of SG AC coaches including preventive & breakdown maintenance in JBP ,BPL &KTT Division of WCR./JBP-LT-No-52-2025R/88347909 Ministry of Railways --
955. 25-Mar-2026 12:30 PM 17-Apr-2026 03:00 PM 17-Apr-2026 03:00 PM (i)Improvement of drainage system due to water logging of existing Sub way No. 125A in MURI-KSX section, Sub way No. 549A in MURI-BRKA Section ,Sub way No. 469A in MURI-BRKA Section ans Sub way No. 412A in MURI-CNI section in Ranchi division.(ii)Construction of Boundary wall at approaches of RNC, NKM & TIS stations to prevent trespassing and chances of encroachment. (iii)Improvement of Drainage System in LTMD, BRKP & MAEL Yards by Construction of Yard Drain./DRMENGGRNC-16-2026/88034945 Ministry of Railways --
956. 25-Mar-2026 11:33 AM 17-Apr-2026 03:00 PM 17-Apr-2026 03:00 PM (1) Construction of new Foot over bridge at Surat end with parcel lifts and (2) Construction 02 Nos. of 6.10M wide Foot over bridge on replacement account at Ahmedabad End and Surat End./DRM-BRC-213-OF-2025-26/87736637 Ministry of Railways --
957. 25-Mar-2026 10:54 AM 17-Apr-2026 03:00 PM 17-Apr-2026 03:00 PM At Hatwar Station - Provision of station approach road through L/xing Gate no. SK/325 to station./04-KIR-Engg-09-2026/87573812 Ministry of Railways --
958. 25-Mar-2026 07:09 PM 17-Apr-2026 03:00 PM 17-Apr-2026 03:00 PM Junagadh: Providing to Health unit on the replacement account at./300-2025-26/86956300 Ministry of Railways --
959. 09-Jul-2025 05:00 PM 17-Apr-2026 03:00 PM 18-Apr-2026 03:00 PM Consultancy services of Independent Engineer for Upgradation to Two lane with paved shoulder of Porbandar- Kalavad section of NH-151K/GJ/NH-151K/IE/2025_MoRTH_868105_1 Ministry of Road Transport and Highways icon image
960. 09-Jul-2025 12:00 PM 17-Apr-2026 03:00 PM 18-Apr-2026 03:00 PM Consultancy services of Independent Engineer for Upgradation to Four lane with paved shoulder of Kalavad- Jamnagar section (Package-II) of NH-927D from Design km 0.000 (Ex. km 50.925) to Design km 47.572 (Ex. km 3.720) in the State of Gujarat/GJ/NH-927D PKG II/IE/2025_MoRTH_868045_1 Ministry of Road Transport and Highways icon image

Note : For more details and clarifications, please refer to the respective Portal.