2991. 07-Apr-2026 09:09 PM 27-Apr-2026 05:30 PM 27-Apr-2026 05:31 PM SUPPLY, INSTALLATION AND COMMISSIONING OF FIVE NUMBERS 3 KW OFF GRID SOLAR POWER PLANT WITH 250 STREETLIGHT/1000454736/2026_BPCL_25001 Bharat Petroleum Corporation Limited --
2992. 13-Mar-2026 09:00 AM 27-Apr-2026 05:30 PM 28-Apr-2026 05:30 PM Performance based Maintenance Contracts (PBMC) Estimate of Chikhli to Takarkhed Bhagile section of NH 753A from km 68.900 to km 108.500 total project length 39.60 km in the State of Maharashtra for 5 years Maintenance Period/10/EENH/AKL/2025-26/03, Dt.11.03.2026/2026_MoRTH_902352_1 Ministry of Road Transport and Highways icon image
2993. 12-Mar-2026 05:30 PM 27-Apr-2026 05:30 PM 29-Apr-2026 11:00 AM Construction of 2 new ROBs in parallel in lieu of LC66 al Km 28413.4 along with LA lor approaches on Daund Manmad railway line DD MNR Crossing at Ch 116.700 of NH548D near Limpangaon on Talegaon Shikrapur Nhavara Shrigonda Jamkhed Road in Ahmednagar/NIT20/2026_MoRTH_902316_1 Ministry of Road Transport and Highways --
2994. 04-Nov-2025 03:30 PM 27-Apr-2026 05:30 PM 30-Apr-2026 12:00 PM Construction of a 2L PS Road Over Bridge ROB t km 2 135 parallel to the existing ROB and reconstruction of existing 2 lane ROB at km 48 557 to 4L PS standards in the state of Maharashtra on EPC mode/EENH/Jalna/Tender/NIT No-02/1619/2025-26/2025_MoRTH_884104_1 Ministry of Road Transport and Highways icon image
2995. 12-Mar-2026 04:45 PM 27-Apr-2026 05:30 PM 28-Apr-2026 05:30 PM EXECUTION OF FLOORING WORK(GRANITE, TILE WORK,CC FLOORING,VDF FLOORING WORK),STRUCTURAL STEEL WORK,CHAIN LINK FENCING,LAMINATED PANEL BOARD WORK FOR 8 ELEVATED STATIONS(continue)../B AND R / HO / BMRCL / 51301 / FLOORING WORK / PKG-3 / NIT / 01/2026_BandR_902264_1 Bridge and Roof Company (India) Limited icon image
2996. 20-Apr-2026 05:18 PM 27-Apr-2026 05:30 PM 27-Apr-2026 06:00 PM 09/EE(E)/DED-11/2026-27/AE(E)-2/09/EE(E)/DED-11/2026-27/AE(E)-2/149986 Central Public Works Department (CPWD) icon image
2997. 23-Mar-2026 06:00 PM 27-Apr-2026 05:30 PM 29-Apr-2026 03:00 PM Engineering, Procurement and Construction EPC Contract for Setting up of 7.8 MW plus/minus 5 percentage capacity Wind Power Project in Agali, Distt Palakkad ,Kerala with Comprehensive O AND M of 5 years/NH/CCW/CC-I/CO-445/PR 16925/54/2026_NHPC_898112_1 NHPC Limited --
2998. 24-Mar-2026 06:30 PM 27-Apr-2026 05:30 PM 29-Apr-2026 12:30 PM Strengthening with IRQP on Bameetha - Satna Section of NH-39 from Km 57/160 to Km 155/000 (Total length 97.84 Km) in the state of Madhya Pradesh on Item Rate (Percentage) Basis/14/SAC/Tender/NH/Rewa/2025-26/2026_MoRTH_903600_1 Ministry of Road Transport and Highways icon image
2999. 11-Apr-2026 04:00 PM 27-Apr-2026 05:30 PM 29-Apr-2026 05:00 PM Development, Commissioning and Operation/NTPC/Rammam HPP (WB)/9900323202/2026_NTPC_106974_1 NTPC Limited icon image
3000. 30-May-2025 05:00 PM 27-Apr-2026 05:30 PM 28-Apr-2026 05:30 PM abilitation Upgradation and Widening of Akola to Mahan section from km 35.265 to km 64.574 (Length 29.309 km) including construction of 4 lane with paved shoulder configuration of Barshi Takli Bypass (Length 3.160 km) on NH161A the State of Maharas/05/EEH/AKL/2025-26, Dt.28.05.2025/2025_MoRTH_862532_1 Ministry of Road Transport and Highways icon image