Central - Tenders Closing for a specific Date

Report For Day : 08-May-2026

Total Tenders : 1988
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
291. 27-Apr-2026 05:47 PM 08-May-2026 11:00 AM 08-May-2026 11:00 AM TRANSFORMER OIL PUMP/22261246A/107038004 Ministry of Railways --
292. 28-Apr-2026 05:36 PM 08-May-2026 11:00 AM 08-May-2026 11:00 AM FOLDABLE LAST VEHICLE BOARD/87255612E/107039299 Ministry of Railways --
293. 08-Apr-2026 06:22 PM 08-May-2026 11:00 AM 08-May-2026 11:30 AM Transmission Line Package TL02 for 800 kV HVDC Bipole line (Hexa lapwing) between Barmer-II (HVDC) and South Kalamb (HVDC) (Part-II) associated with Transmission system for evacuation of power from Rajasthan REZ Ph-IV (Part-5 :6 GW) [Barmer Complex] Barmer-II: 6 GW (Solar) under TBCB route/CC/T/W-TW/DOM/A06/26/04708/27572 Power Grid Corporation of India Limited icon image
294. 04-Apr-2026 12:15 PM 08-May-2026 11:00 AM 08-May-2026 05:00 PM Main Power Block-2-(Civil, Structural and Architectural works from Main Power House to Switchyard) at 1X800 MW Darlipali Super Thermal Power Project, Stage-II/BHEL/CPC/ DRL/C_MPH_T-Yard/ 27/005/2026_BHEL_59946_1 Bharat Heavy Electricals Limited icon image
295. 19-Feb-2026 12:00 PM 08-May-2026 11:00 AM 08-May-2026 04:00 PM SUPPLY OF BUS POST INSULATORS (145kV, 72.5kV and 36kV) FOR VARIOUS PGCIL PROJECTS./27G2600520/2026_BHEL_58506_1 Bharat Heavy Electricals Limited icon image
296. 07-Apr-2026 03:38 PM 08-May-2026 11:00 AM 08-May-2026 11:30 AM TRANSMISSION LINE PACKAGE TL06 FOR 800 KV BARMER II HVDC/CC/T/W-TW/DOM/A10/26/04481/27555 Power Grid Corporation of India Limited icon image
297. 10-Mar-2026 01:02 PM 08-May-2026 11:00 AM 08-May-2026 11:30 AM Package-I for 800 kV, 6000MW HVDC terminals at Barmer-II (HVDC) and South Kalamb (HVDC) and AC Substation extension at Barmer-I PS/CC/T/W-HVDC/DOM/A02/26/03383/27366 Power Grid Corporation of India Limited icon image
298. 07-Apr-2026 05:45 PM 08-May-2026 11:00 AM 08-May-2026 11:30 AM Prebid Tie up of Transmission Line package TL04 for 800 KV HVDC Bipole Line (Hexa Lapwing) between Barmer II (HVDC) and South Kalamb (HVDC) (Part IV) associated with Transmission System for Evacuation of power from Rajasthan REZ Ph IV (Part-5 6 GW) (Barmer Complex) Barmer-II 6 GW (Solar) through tariff based competitive bidding (TBCB) route/CC/T/W-TW/DOM/A02/26/04471/27560 Power Grid Corporation of India Limited icon image
299. 04-May-2026 04:00 PM 08-May-2026 11:00 AM 08-May-2026 03:00 PM CHEMICAL ANALYSIS OF SAMPLES ON INS PROJECT/SR COMPLEX/PRODUCTION/OUT SOURCE REQUISITION/2025/926/2026_HSL_99452_1 Hindustan Shipyard Limited --
300. 24-Apr-2026 12:00 PM 08-May-2026 11:00 AM 08-May-2026 03:00 PM FLOORING WORKS ON BOARD ORV SAGAR KANYA/FLOORING WORKS ONBOARD ORV SAGAR KANYA/2026_HSL_99412_1 Hindustan Shipyard Limited icon image

Note : For more details and clarifications, please refer to the respective Portal.