Central - Tenders Closing for a specific Date

Report For Day : 12-Jun-2026

Total Tenders : 1416
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
851. 15-May-2026 01:17 PM 12-Jun-2026 03:00 PM 12-Jun-2026 03:00 PM Nanded Division: Proposed construction of Balance Trip Shed works at Nanded Station (track portion)/T-202627-2-020/89308565 Ministry of Railways --
852. 15-May-2026 12:29 PM 12-Jun-2026 03:00 PM 12-Jun-2026 03:00 PM Construction of balance work of Trip shed at NED station(Except track portion)./T-20267-2-019/89274222 Ministry of Railways --
853. 15-May-2026 06:21 PM 12-Jun-2026 03:00 PM 12-Jun-2026 03:00 PM 1. Construction of staff quarters at Meerut City.and 2. Construction of Staff quarters at Ghaziabad.and 3. Construction of Staff quarters at Shamli. and 4. Replacement of jack arch roof, other old roofs by RCC slab and heavy repair, strengthening of building structure of quarters at Shamli (SMQL), Baghpat Road (BPM) and Baraut (BTU). and 5. Improvement to various staff amenities at various staff quarters at SMQL, BTU, BPM and KEX under ADEN SMQL in jurisdiction of Sr. DEN-II/DLI./NIT-13-26-27-W-II/89046702 Ministry of Railways --
854. 15-May-2026 04:09 PM 12-Jun-2026 03:00 PM 12-Jun-2026 03:00 PM Nanded Division: AKOLA-PURNA Section: Supply and Stacking of 50 mm Gauge hard and durable machine crushed stone ballast at HINGOLI (HNL) Ballast depot and loading the same into Hopper/Traffic ballast wagon by Mechanical means under ADEN/PAU s Jurisdiction for Completion Period Eighteen (18) Months ) ( Including (03)Three months mobilization period)./T-202627-3-021/88801172 Ministry of Railways --
855. 20-May-2026 06:28 PM 12-Jun-2026 03:00 PM 12-Jun-2026 03:00 PM M.T.O.TO IS:1745(1978 OR LATEST REVISION), GRADE 145/205 LOW AROMATIC AS TO BE SUPPLIED IN 12/16/18/20 KL CAPACITY NIL NIL Spec:IS:1745(1978 OR LATEST REVISION),/07261009B/107062523 Ministry of Railways --
856. 22-May-2026 12:00 PM 12-Jun-2026 03:00 PM 19-Jun-2026 03:30 PM Fabrication, assembly, integration, operation, testing, supply, installation and commissioning of layout of closed loop compressor and chillers system (CCS) at RIT building high-bay/IGC/FRTG/RHIED/KPMN/2026/01/2026_IGCAR_908687_1 Indira Gandhi Centre for Atomic Research --
857. 22-May-2026 10:26 AM 12-Jun-2026 03:00 PM 12-Jun-2026 03:30 PM Supply,Onsite Installation, Onsite Commissioning, Onsite Testing and Onsite Training to local personnels of Gas Chromatography Mass Spectrometer (GCMS) Lab equipment including all necessary accessories at Nairobi, Kenya technical specifications as per Annexure-A/HSS-P-0155-3782/HSS-P-0155-3782 Electronics Corporation of India Limited --
858. 22-May-2026 06:00 PM 12-Jun-2026 03:00 PM 15-Jun-2026 03:30 PM Upgradation of Workstations and System Software of DeltaV Distributed Control System at TVR6 EPS/V16RS26002/2026_ONGC_278373_1 Oil and Natural Gas Corporation Limited --
859. 22-May-2026 04:00 PM 12-Jun-2026 03:00 PM 13-Jun-2026 03:00 PM Supply, Installation, Testing and Commissioning of AC units at BSBE and Physics Dept., IIT Jodhpur/IITJ/OIE/2026-27/13/2026_IITJ_909891_1 Indian Institute of Technology Jodhpur --
860. 25-May-2026 12:00 PM 12-Jun-2026 03:00 PM 17-Jun-2026 03:30 PM Revamping of HV and LV Switchboards and associated works at various substations of IGCAR, Kalpakkam/IGCAR/ESG/ESD/T-1782/2026/2026_IGCAR_909864_1 Indira Gandhi Centre for Atomic Research --

Note : For more details and clarifications, please refer to the respective Portal.