Central - Tenders Closing for a specific Date

Report For Day : 17-Jun-2026

Total Tenders : 1481
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
841. 13-May-2026 05:03 PM 17-Jun-2026 03:15 PM 17-Jun-2026 03:15 PM Outsourcing of Operation and maintenance of BCM, DUO/CSM, DTS & MFI machines for 24 months in two different groups./WCRBPLTM26W03/89180481 Ministry of Railways --
842. 26-May-2026 06:13 PM 17-Jun-2026 03:30 PM 17-Jun-2026 03:30 PM Requirement of CNC operator for operation of CNC Machines installed in Machining Area-1 and Area-4A of FWP/MCF for production of machined LHB/LOCO/Any other wheels from black wheels as per scope of work./CNC-Operator-2026-27/89519244 Ministry of Railways --
843. 26-May-2026 07:52 PM 17-Jun-2026 03:30 PM 17-Jun-2026 03:30 PM Interlocking of LC gate no. 146, 131 and 136 along with associated signalling and telecom work in Ruthiyai - Maksi section over Bhopal division./WCR-BPL-W-26-27-W-07-35/89518677 Ministry of Railways --
844. 21-May-2026 12:00 PM 17-Jun-2026 03:30 PM 18-Jun-2026 03:30 PM Space qualified PCMU and EPC/SAC/CPUR/SA202500292301/2026_ISRO_838892_1 Indian Space Research Organisation --
845. 03-Jun-2026 09:00 AM 17-Jun-2026 03:30 PM 17-Jun-2026 04:00 PM ALTERNET PREMISES REQUIRED ON LEASE FOR UNION BANK OF INDIA MULUND MG ROAD BRANCH/RO/THANE/MULUND/2026/2026_UBoI_839970_1 Union Bank of India --
846. 20-May-2026 04:30 PM 17-Jun-2026 03:30 PM 18-Jun-2026 02:00 PM Space grade Ku band Power Amplifier MMIC/SAC/CPUR/SA202500148801/2026_ISRO_838811_1 Indian Space Research Organisation --
847. 25-May-2026 04:37 PM 17-Jun-2026 03:30 PM 17-Jun-2026 03:30 PM Vijayawada Division: Signal and Telecom Department: S&T works in connection with (1)BZA-VSKP section - Prposed construction of ROB in lieu of LC No.316 at Km 434/20-22 at Gunadala station yard., (2) KI-BZA section - Proposed construction of ROB in lieu of LC No.147 at Km 573/17-19 between Kondapalli-Rayanapadu stations. (3) BZA-KI section - Prposed construction of ROB in lieu of LC No.148 at Km 575/9-11 at Rayanapadu station yard. (4) BZA-VSKP section - Prposed construction of ROB in/SCR-BZA-SNT-E08-OT-26-27/89420225 Ministry of Railways --
848. 27-May-2026 04:00 PM 17-Jun-2026 03:30 PM 17-Jun-2026 04:00 PM PREMISES REQUIRED ON LEASE BASIS FOR UNION MSME FIRST BRANCH AT KOTA RAJASTHAN/PREMISES REQUIRED ON LEASE BASIS FOR UMFB AT KOTA/2026_UBoI_839607_1 Union Bank of India --
849. 25-May-2026 04:43 PM 17-Jun-2026 03:30 PM 17-Jun-2026 03:30 PM (1) KVR: S&T works in c/w Proposed New station building.(2) GVN: Improvements to water supply system duly providing 1.0 lakh Liters RCC tank GVN under ADEN/RJY sub division. (3) GVN & PAP:Signalling works in c/w Improvements to parking sheds in circulating area under ADEN/RJY sub-division. (4) Godavari Pushkarams: 2027 Arrangements at Kovvur station : Signalling works in c/w Augmentation of water Supply/Storage System and Improvements to platform surfaces (PF Nos 1,2,3) and and Arragem/SCR-BZA-SNT-E07-OT-26-27/89403547 Ministry of Railways --
850. 21-May-2026 12:00 PM 17-Jun-2026 03:40 PM 18-Jun-2026 04:30 PM IRIMS FILTER ASSEMBLIES FABRICATION, ASSEMBLY AND THERMAL TESTING/SAC/CPUR/SA202500257201/2026_ISRO_838895_1 Indian Space Research Organisation --

Note : For more details and clarifications, please refer to the respective Portal.