Central - Tenders Closing for a specific Date

Report For Day : 19-Jun-2026

Total Tenders : 1095
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
451. 21-May-2026 04:35 PM 19-Jun-2026 03:00 PM 19-Jun-2026 03:00 PM Reconditioning/Repairing of Aluminum Transformer tank for major damages of Three phase Locomotive/TRS-HWH-10-OT-174R/89471116 Ministry of Railways --
452. 21-May-2026 08:00 PM 19-Jun-2026 03:00 PM 19-Jun-2026 03:00 PM 1) Repair of washable apron at LTT Yard. 2) Renewal of sleeper inconcrete Apron at LTT Yard. 3) Repairs & Construction of Dead End at LTT Yard. 4) Repairs & Construction of Dead End at TNA and mulund Yard./CR-DRMWBB-2026-28-03/89361284 Ministry of Railways --
453. 18-May-2026 05:12 PM 19-Jun-2026 03:00 PM 19-Jun-2026 03:00 PM Provision and shifting/ relocation of telecom assets for traffic facility work under SSE/Tele/Kurudwadi on Solapur division of Central Railway./SUR-N-T-2026-27-12/89323443 Ministry of Railways --
454. 21-May-2026 05:34 PM 19-Jun-2026 03:00 PM 19-Jun-2026 03:00 PM Augmentation of Maintenance Facilities and Re-construction of Bio-Tank shed at low lying area at LGD shops - Electrical arrangements/LGD-L-03-2026-27-OT/89281542 Ministry of Railways --
455. 21-May-2026 06:10 PM 19-Jun-2026 03:00 PM 19-Jun-2026 03:00 PM Provision of CCTV at 20 nos. of Non interlocking LC Gates and monitoring at 12 nos. of connected station and Engineering control over Kota Division/KOTA-SandT-TELE-2026-04/87689541 Ministry of Railways --
456. 18-May-2026 04:54 PM 19-Jun-2026 03:00 PM 19-Jun-2026 03:00 PM Provision of Double /Second Distant signalling arrangement in KSARA-TITOLI section(18Km section) consisting of North East Ghats in Kalyan-Titoli section(A Route) of Mumbai Division & Provision of balance indoor & outdoor signalling works in connection with Electronic interlocked station at Titoli station on HDN route of Mumbai division, where Kavach is sanctioned./CR-BB-SNT-NORTH-2026-40/88619189 Ministry of Railways --
457. 20-May-2026 10:00 AM 19-Jun-2026 03:00 PM 20-Jun-2026 03:30 PM Civil and Structural works including Architectural finishes for Travellator and Connecting Walkway between Reach-5/Phase-2/Yellow Line Central Silk Board Station to Blue line ORR Central Silk Board Station of Bangalore Metro Rail Project, Phase-2A./BMRCL/TrvPh2A/CSB/RT/2026/148/2026_BMRCL_278042_1 Bangalore Metro Rail Corporation Limited --
458. 27-May-2026 01:54 PM 19-Jun-2026 03:00 PM 19-Jun-2026 03:00 PM One time repair and Comprehensive AMC for 02 years of HUB BORING MACHINE -NO 1 & 2 in WHEEL FINAL PROCESSING SHOP at Rail Wheel Plant Bela as per scope of work./CRWS-1-2026/89592893 Ministry of Railways --
459. 27-May-2026 11:50 AM 19-Jun-2026 03:00 PM 19-Jun-2026 03:00 PM Fabrication assembly in situ G-3/L type glued insulated joints for broad gauge 60 Kg/52 Kg with all contractor s materials, to and from transportation of material, octroi etc. Complete as per instructions contained in manual for glued insulated rail joints in the section of Khalilabad - Bansi in connection with Khalilabad - Bahraich new line project of Lucknow Division of N.E. Railway./DYCE-CON-G-GKP-03-2026/89589539 Ministry of Railways --
460. 27-May-2026 11:52 AM 19-Jun-2026 03:00 PM 19-Jun-2026 03:00 PM Alumino Thermit Welding work of 60 Kg (90 UTS)/60 El-R-260) rails and 52 Kg/90R Rail (90/72 UTS) Rail as approved by RDSO between Khalilabad -Bansi section (Phase-I) in connection with new line Project of Khalilabad-Bahraich in Lucknow Division of N.E. Railway./DYCE-CON-G-GKP-04-2026/89592297 Ministry of Railways --

Note : For more details and clarifications, please refer to the respective Portal.