Central - Tenders Closing for a specific Date

Report For Day : 30-Jan-2026

Total Tenders : 2465
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
1601. 05-Jan-2026 02:07 PM 30-Jan-2026 03:00 PM 30-Jan-2026 03:00 PM Provision of IOT devices/Intelligent Field Devices (IFDs) for monitoring & control (Indian Railways Native IOT based Yield Analysis Telemetry, Recording and Control -IR-NIYANTRAC) of electrical general assets like pump, platform (30/70 Percent ) lighting, street lighting, lifts, Escalators, Substation etc. for 07 numbers (Belpahar, Champa, Raigarh, Baradwar, Naila, Akaltara, Korba or any other) of Amrit Bharat Stations in Bilaspur Division of SEC Railway, Bilaspur (Chhattisgarh)"/SECR-GSU-BSP-ELECT-IR-17/86572845 Ministry of Railways --
1602. 05-Jan-2026 06:07 PM 30-Jan-2026 03:00 PM 30-Jan-2026 03:00 PM Bengaluru - Sampige Road sec : Proposed pedestrian subways to facilitate crossing of railway alignment by cattle, Pedestrians and smaller vehicles in various locations as RCC box size 1x5mx2.65m in connection with speed increase upto 130 kmph (Total number of subways = 11 nos) - Fabrication of RH girders. Maintenance period is 03 months/01SBC26OF05-01-026Item-11/86552406 Ministry of Railways --
1603. 05-Jan-2026 06:32 PM 30-Jan-2026 03:00 PM 30-Jan-2026 03:00 PM Yelahanka - Bangarpet section (YNK-BWT): Providing an approach road on LH side in RUB 85A at km 96/200-300 between Chinthamani - Srinivaspur (CMY-SVS) stations. Maintenance period is 6 months or one monsoon period whichever is later./01SBC26OF05-01-26Item-06/86552162 Ministry of Railways --
1604. 05-Jan-2026 05:28 PM 30-Jan-2026 03:00 PM 30-Jan-2026 03:00 PM At APDJ Div - Electrical work for : Electrification of RPF out post at SVQ station./AP-EL-19-25-26/86533331 Ministry of Railways --
1605. 05-Jan-2026 06:05 PM 30-Jan-2026 03:00 PM 30-Jan-2026 03:00 PM Sr. DEN/North/SBC sec : Supply of ballast at Makajapalli (MKJ) depot (Quantity = 18,100 cum) including leading and loading in connection with the works of (a) Complete Track Renewal (P) of existing 60kg rails on 60kg PSC of 1660 nos/KM with 60kg/90 UTS R-260 rails and 60kg wider base sleeper of 1660/km for a length of 5.5 Tkm from km 130/000-135/500 (DN) in SSE/PWAY/PKD section, (b) CTR(P) for a length of 0.6 kms from 0/000-0/600 at PKD yard Rd-1 (SSPN Line) and TTR (Primary) of Point Number 6/01SBC26OF05-01-26Item-04/86533172 Ministry of Railways --
1606. 05-Jan-2026 06:42 PM 30-Jan-2026 03:00 PM 30-Jan-2026 03:00 PM Bengaluru Division: SW-I: YNK-BWT section: Proposed extension of RUB Bridge No. 75-A at Railway km 102.917 in Srinivasapura station yard (Exg 2 X 7.5m X 5.5m (Twin RCC Boxes), Proposed extension as 2 X 7.5m X 5.5m (Twin RCC Boxes) - 13m) in connection with the work of track machine siding. SW-II: Construction of track machine siding of 250m length at SVS station in connection with the work of Construction of Track Machine siding for a length of 420m at 15 minor stations in SBC Division. Mai/01SBC26OF05-01-26Item-07/86454133 Ministry of Railways --
1607. 05-Jan-2026 06:24 PM 30-Jan-2026 03:00 PM 30-Jan-2026 03:00 PM SBC Division: Manufacturing, supply and execution of Alumino Thermic welding of 52kg and 60kg including in-situ welding in DEN/East/SBC and DEN/West/SBC Section./01SBC26OF05-01-26Item-05/86443589 Ministry of Railways --
1608. 05-Jan-2026 06:01 PM 30-Jan-2026 03:00 PM 30-Jan-2026 03:00 PM Bengaluru - Sampige road sec : SW I : Proposed construction of pedestrian subway at km 12/900 -13/000, size 1x5.0x2.65m, by Launching method. SW II : Proposed construction of pedestrian subway at km 14/300-400, size 1x5.0x2.65m, by Launching method. Maintenance period is 6 months or one monsoon period whichever is later./01SBC26OF05-01-26Item-02/86432512 Ministry of Railways --
1609. 05-Jan-2026 06:03 PM 30-Jan-2026 03:00 PM 30-Jan-2026 03:00 PM Bengaluru - Sampige road sec : SW I: Proposed construction of Limited height subway at Km 63/600-700, Size: 1x5.0x3.15m by launching method. SW II: Proposed construction of pedestrian subway at KM 67/200-300 of size: 1x5.0x2.65m by Launching method. Maintenance period is 6 months or one monsoon period whichever is later./01SBC26OF05-01-26Item-03/86432232 Ministry of Railways --
1610. 23-Jan-2026 01:16 PM 30-Jan-2026 03:00 PM 30-Jan-2026 03:30 PM 61/Hubli/EE/e-Tender/2025-26/61/Hubli/EE/e-Tender/2025-26/141013 Central Public Works Department (CPWD) --

Note : For more details and clarifications, please refer to the respective Portal.