Central -Tenders Closing Today

Total Tenders : 1007
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
101. 24-Jun-2025 06:30 PM 01-Jul-2025 11:00 AM 02-Jul-2025 12:30 PM Various type of electrical repairing works i/c Computer power and fan repairing at different floors of Yogayog Bhawan,Kolkata ./20/EE/PED/KOL/NIT/2025-26/2025_DOP_865977_1 Department of Posts --
102. 20-Jun-2025 06:00 PM 01-Jul-2025 11:00 AM 02-Jul-2025 11:00 AM Fabrication and erection of Pathway of unit no. 79 and 80 and side guard with channel angle plate etc changing and bressing in Raw Coal Section at Kathara Washery/PO/KTW/EnM/eTen/25-26/15 Dated-20.06.2025/2025_CCL_338080_1 Central Coalfields Limited --
103. 20-Jun-2025 06:00 PM 01-Jul-2025 11:00 AM 02-Jul-2025 11:00 AM Repairing/modification of worn out/damaged discharge chute by dismantling, fabrication etc of steel cord belt conveyor, 0 Dip belt, -2L belt conveyor of MIC,JPC/ECL/GM/JNR/EnM/A2/25-26/23 dated 12.06.2025/2025_ECL_337809_1 Eastern Coalfields Limited --
104. 20-Jun-2025 06:00 PM 01-Jul-2025 11:00 AM 02-Jul-2025 11:00 AM Installation of Eleven reels 2200 mtr 1000mm belt of LHCM-2 belt conveyors running at 3n4 Incline unit, J.P.Colly./ECL/GM/JNR/EnM/A2/25-26/22 dated 12.06.2025/2025_ECL_337807_1 Eastern Coalfields Limited --
105. 17-Jun-2025 05:00 PM 01-Jul-2025 11:00 AM 02-Jul-2025 11:00 AM For Repairing of Winch and Winch Motor Assy of ACE Crane Sl no - 1912865 at AKWMOCP Katas Area BCCL/BCCL/KA/IV/EXCV/E-TENDER/ 25-26/025 DATE- 17.06.2025/2025_BCCL_337794_1 Bharat Coking Coal Limited --
106. 20-Jun-2025 06:00 PM 01-Jul-2025 11:00 AM 02-Jul-2025 11:00 AM A)Fabrication, Erection and fitting of unit no. 215 crusher (impact crusher) outer body lining using 10 mm plate, (B)Fabrication, erection and fitting of unit no. 215 crusher motor base support using 16 mm plate C)Fabrication, erection and fitting of/PO/KTW/EnM/eTen/25-26/13 Dated-20.06.2025/2025_CCL_338063_1 Central Coalfields Limited --
107. 17-Jun-2025 02:00 PM 01-Jul-2025 11:00 AM 01-Jul-2025 11:30 AM NBCC/SBG Delhi ll/ PGCIL/ Dining Hall /2025 /91 Dated 17.06.2025/NBCC/SBG Delhi-ll/ PGCIL/ Dining Hall /2025 /91/2025_NBCC_801986_1 National Buildings Construction Corporation Limited --
108. 26-Jun-2025 01:00 PM 01-Jul-2025 11:00 AM 01-Jul-2025 11:00 AM Pre NIT for Conclusion of Running Contracts (RCs) and empanelment as Reserve RC holders for a period of 6 months for supply of Permitted Electronic Detonator to all the subsidiary companies of CIL and NEC/CIL/C2D/PED/2025-27/Pre-NIT/2025_CILHQ_338410_1 Coal India Limited --
109. 20-Jun-2025 06:55 PM 01-Jul-2025 11:00 AM 02-Jul-2025 11:00 AM Comprehensive Annual Maintenance Contract of IP based CCTV Surveillance System installed at Nigahi Project for period of 1 Year/NGH/EnT/e-Tender/25-26/02 dated 20.06.2025/2025_NCL_338074_1 Northern Coalfields Limited --
110. 20-Jun-2025 06:00 PM 01-Jul-2025 11:00 AM 02-Jul-2025 11:00 AM Transportation of 552 mtr. trackline Total rail length 1104 mtr materials from surface/previous panel and fitting them from 4D/74L to 20D/74L, LHCM-1 in R-VIIA seam/ECL/GM/JNR/EnM/A2/25-26/24 dated 12.06.2025/2025_ECL_337810_1 Eastern Coalfields Limited --