| उत्पाद श्रेणी |
: |
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS Vishwast E 263 DA No 3 Heat exchanger to be removed and pressure tested for finding out of leaking tubes and if tubes found leaking tubes to be blanked as per pro..,Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS Vishwast E 264 Leakage observed from FER educator suction pipeline Pipeline to be repaired and proved for satisfactory operation including pressure testing upto 8 ..,Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS Vishwast E 265 High refrigerant pressure observed on AC condenser No 1 Suspect scale formation in condenser tubes Condenser to be chemical cleaned and proved for s..
|