क्र.सं.
| एजेंसी का नाम
| Debarred by - Organisation Name
| विवर्जित की प्रारंभ तिथि
| विवर्जित की समाप्ति तिथि
| निरस्त तिथि
| निरसन का कारण
|
1 |
ayush sharma |
Mahanadi Coalfields Limited |
31-May-2021 |
29-May-2023 |
29-Jul-2021 |
TO EXTEND THE DEBARMENT PERIOD |
2 |
M/S TULSI CONSTRUCTION |
Indian Oil Corporation Limited |
26-Oct-2019 |
05-Mar-2021 |
18-Dec-2019 |
Revoked as per the new Debarment Order-UPSO-I/ENG/PT-72/2018-19 upto 11.12.2022 |
3 |
GANPAT STEEL |
Indian Oil Corporation Limited |
05-Nov-2019 |
20-Sep-2022 |
19-Dec-2020 |
Appellate Authority has decided to condone remaining period of Holiday listing of the Appellant, M/s Ganpat Steel, with effect from the date of this order. |
4 |
M/S TULSI CONSTRUCTION |
Indian Oil Corporation Limited |
18-Dec-2019 |
11-Dec-2022 |
21-Jan-2020 |
Revoked as per the new Debarment Order-UPSO-I/ENG/PT-72/2018-19 upto 11.12.2022 |
5 |
SHASHI BALA INDUSTRIES |
Indian Oil Corporation Limited |
05-Nov-2019 |
02-Sep-2022 |
29-Jun-2020 |
For extending Holiday Listing period up to 11.06.2023, as per approval of ED (AOD) and Refinery Head dated 12.06.2020 |
6 |
PABSTA ENGINEERS INDIA LIMITED |
Indian Oil Corporation Limited |
19-Nov-2019 |
07-Nov-2022 |
05-Dec-2019 |
Request recd from Mr A K Saha, DGM(Contracts)/RCC/ERO vide Mail dtd 05/12/2019 - App accorded by ED(RS)/ER Ref RCC/ERO/37/2019-20/PT-31/05 Dtd 02/12/2019 |
7 |
PABSTA Engineers India Limited |
Indian Oil Corporation Limited |
19-Nov-2019 |
07-Nov-2022 |
05-Dec-2019 |
Request recd from Mr A K Saha, DGM(Contracts)/RCC/ERO vide Mail dtd 05/12/2019 - App accorded by ED(RS)/ER Ref RCC/ERO/37/2019-20/PT-31/05 Dtd 02/12/2019 |
8 |
Shiv Pharmaceuticals |
Indian Oil Corporation Limited |
16-Dec-2019 |
15-Dec-2022 |
03-Feb-2020 |
Courts stay order |
9 |
Archon Powerinfra India Pvt. Ltd. |
Indian Oil Corporation Limited |
26-Nov-2019 |
20-Nov-2022 |
06-Nov-2019 |
Revoking the Blacklisting of vendor M/s Archon Powerinfra India Pvt. Ltd. in view of Calcutta High Court Order dt. 30.1.2019 |
10 |
SIDDHARTHA SENGUPTA |
Mahanadi Coalfields Limited,ORIENT AREA,ORIEN_MINING,MINING |
11-May-2021 |
10-May-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
11 |
ANIL CHANDRA ROY |
Mahanadi Coalfields Limited,LAKHANPUR AREA,LKP_CIVIL,CIVIL |
06-Jul-2021 |
29-Jun-2023 |
20-Sep-2021 |
TO EXTEND THE DEBARMENT PERIOD |
12 |
ANIL CHANDRA ROY |
Mahanadi Coalfields Limited||LAKHANPUR AREA||LKP_CIVIL||CIVIL |
02-Sep-2021 |
08-Aug-2023 |
20-Sep-2021 |
TO EXTEND THE DEBARMENT PERIOD |
13 |
ayush sharma |
Mahanadi Coalfields Limited,ORIENT AREA,ORIEN_MINING,MINING |
03-Mar-2021 |
03-Mar-2022 |
29-Jul-2021 |
TO EXTEND THE DEBARMENT PERIOD |
14 |
KRISHNA CHANDRA DHAR |
Mahanadi Coalfields Limited |
12-Apr-2021 |
09-Apr-2023 |
26-Apr-2021 |
penal action shall be taken at a later date after approval of competent authority |
15 |
siddhartha sengupta |
Mahanadi Coalfields Limited,BASUNDHARA GARJANBAHAL AREA,BG_E AND M |
10-Jun-2021 |
10-Jun-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
16 |
SIDDHARTHA SENGUPTA |
Mahanadi Coalfields Limited,BASUNDHARA GARJANBAHAL AREA,BG_E AND M |
10-Jun-2021 |
10-Jun-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
17 |
TELMART INFRASTRUCTURE PRIVATE LIMITED |
Mahanadi Coalfields Limited,HQ CIVIL,CIVIL |
27-Oct-2021 |
26-Oct-2023 |
04-Jun-2022 |
Imposition of fresh debarment, vide Letter Nos.MCL/GM(HA)/SO(C)/Banning/2022/433, Dtd.03/06/2022 of Staff Officer(Civil), Hingula Area, MCL |
18 |
TELMART INFRASTRUCTURE PRIVATE LIMITED |
Mahanadi Coalfields Limited,HQ CIVIL,CIVIL |
27-Oct-2021 |
26-Oct-2023 |
04-Jun-2022 |
Imposition of fresh debarment, vide Letter Nos.MCL/GM(HA)/SO(C)/Banning/2022/433, Dtd.03/06/2022 of Staff Officer(Civil), Hingula Area, MCL |
19 |
KRISHNA CHANDRA DHAR |
Mahanadi Coalfields Limited |
12-Apr-2021 |
09-Apr-2023 |
26-Apr-2021 |
penal action shall be taken at a later date after approval of competent authority |
20 |
ANIL CHANDRA ROY |
Mahanadi Coalfields Limited,LAKHANPUR AREA,LKP_CIVIL,CIVIL |
01-Jul-2021 |
30-Jun-2023 |
20-Sep-2021 |
TO EXTEND THE DEBARMENT PERIOD |
21 |
SARCHAK ELECTRICAL AND ELECTRONICS PRIVATE LIMITED |
Mahanadi Coalfields Limited,HQ E AND M,E AND M |
17-Sep-2021 |
16-Sep-2023 |
27-Jan-2022 |
TO EXTEND THE DEBARMENT PERIOD |
22 |
SARCHAK ELECTRICAL AND ELECTRONICS PRIVATE LIMITED |
Mahanadi Coalfields Limited,HQ E AND M,E AND M |
17-Sep-2021 |
16-Sep-2023 |
27-Jan-2022 |
TO EXTEND THE DEBARMENT PERIOD |
23 |
ayush sharma |
Mahanadi Coalfields Limited |
09-Sep-2021 |
06-Sep-2023 |
29-Jul-2021 |
TO EXTEND THE DEBARMENT PERIOD |
24 |
ayush sharma |
Mahanadi Coalfields Limited |
29-Jul-2021 |
06-Jul-2023 |
29-Jul-2021 |
TO EXTEND THE DEBARMENT PERIOD |
25 |
PRODYUT KR MUKHERJEE |
Indian Oil Corporation Limited |
23-Dec-2019 |
22-Dec-2022 |
12-Feb-2020 |
bidder has been debarred against Organization WHICH SHOULD BE AGAINST PORTAL AS PER TENDER RULES AND MAIL DATED 12.02.2020 FROM COIS TENDER TEAM |
26 |
Joy Global (India) Ltd. |
Coal India Limited |
18-Aug-2021 |
11-Aug-2023 |
18-Nov-2021 |
The banning order will not be applicable for supply of spares and consumables and rendering associated services in respect of the existing P and H make ER Shovels operating in CIL and its subsidiaries. |
27 |
ANIL CHANDRA ROY |
Mahanadi Coalfields Limited||LAKHANPUR AREA||LKP_CIVIL||CIVIL |
29-Jul-2021 |
09-Jul-2023 |
20-Sep-2021 |
TO EXTEND THE DEBARMENT PERIOD |
28 |
ANIL CHANDRA ROY |
Mahanadi Coalfields Limited||LAKHANPUR AREA||LKP_CIVIL||CIVIL |
02-Sep-2021 |
08-Aug-2023 |
20-Sep-2021 |
TO EXTEND THE DEBARMENT PERIOD |
29 |
siddhartha sengupta |
Mahanadi Coalfields Limited,ORIENT AREA,ORIEN_MINING,MINING |
11-May-2021 |
10-May-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
30 |
SIDDHARTHA SENGUPTA |
Northern Coalfields Limited||Dudichua Project |
27-Jul-2021 |
25-Jul-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
31 |
SIDDHARTHA SENGUPTA |
Northern Coalfields Limited||Dudichua Project |
02-Sep-2021 |
18-Aug-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
32 |
SIDDHARTHA SENGUPTA |
Northern Coalfields Limited||Dudichua Project |
02-Sep-2021 |
18-Aug-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
33 |
TELMART INFRASTRUCTURE PRIVATE LIMITED |
Mahanadi Coalfields Limited |
15-Dec-2021 |
12-Dec-2023 |
04-Jun-2022 |
Imposition of fresh debarment, vide Letter Nos.MCL/GM(HA)/SO(C)/Banning/2022/433, Dtd.03/06/2022 of Staff Officer(Civil), Hingula Area, MCL |
34 |
JOY GLOBAL (INDIA) PRIVATE LIMITED |
Coal India Limited |
18-Aug-2021 |
11-Aug-2023 |
18-Nov-2021 |
The banning order will not be applicable for supply of spares and consumables and rendering associated services in respect of the existing P and H make ER Shovels operating in CIL and its subsidiaries. |
35 |
Allied Infrastructures And Projects Private Limited |
Coal India Limited |
28-Apr-2021 |
19-Apr-2023 |
13-Nov-2021 |
As per the order reference no Ref No. ECL/DT(OP)2021/2441 Date 25.08.2021 |
36 |
JOY GLOBAL (INDIA) PRIVATE LIMITED |
Coal India Limited |
18-Aug-2021 |
11-Aug-2023 |
18-Nov-2021 |
The banning order will not be applicable for supply of spares and consumables and rendering associated services in respect of the existing P and H make ER Shovels operating in CIL and its subsidiaries. |
37 |
SARCHAK ELECTRICAL AND ELECTRONICS PRIVATE LIMITED |
Mahanadi Coalfields Limited |
29-Nov-2021 |
23-Nov-2023 |
27-Jan-2022 |
TO EXTEND THE DEBARMENT PERIOD |
38 |
M/S RIYAZUDDIN ANSARI |
Coal India Limited |
30-Nov-2021 |
29-Nov-2022 |
26-Nov-2021 |
Need to modify The banning period |
39 |
SARCHAK ELECTRICAL AND ELECTRONICS PRIVATE LIMITED |
Mahanadi Coalfields Limited |
29-Nov-2021 |
23-Nov-2023 |
27-Jan-2022 |
TO EXTEND THE DEBARMENT PERIOD |
40 |
SAI RADHAKRISHNA CONSTRUCTION & INSTALLATION |
Mahanadi Coalfields Limited |
20-Dec-2021 |
18-Dec-2023 |
07-Apr-2022 |
Extension of Debarment period, vide fresh debarment letter No.MCL/GM/BA/Civil/21-22/1590, Dtd.31/03/2022 of Staff Officer(Civil), Basundhara Area, MCL |
41 |
SAI RADHAKRISHNA CONSTRUCTION & INSTALLATION |
Mahanadi Coalfields Limited |
20-Dec-2021 |
18-Dec-2023 |
07-Apr-2022 |
Extension of Debarment period, vide fresh debarment letter No.MCL/GM/BA/Civil/21-22/1590, Dtd.31/03/2022 of Staff Officer(Civil), Basundhara Area, MCL |
42 |
ROYAL TRAVELS |
Coal India Limited |
09-Aug-2021 |
28-Jul-2023 |
20-Sep-2021 |
Stay Order Received from Competent Authority |
43 |
ayush sharma |
Mahanadi Coalfields Limited |
09-Sep-2021 |
06-Sep-2023 |
29-Jul-2021 |
TO EXTEND THE DEBARMENT PERIOD |
44 |
ayush sharma |
Mahanadi Coalfields Limited |
02-Sep-2021 |
18-Aug-2023 |
29-Jul-2021 |
TO EXTEND THE DEBARMENT PERIOD |
45 |
ayush sharma |
Mahanadi Coalfields Limited |
02-Sep-2021 |
18-Aug-2023 |
29-Jul-2021 |
TO EXTEND THE DEBARMENT PERIOD |
46 |
ANIL CHANDRA ROY |
Mahanadi Coalfields Limited||LAKHANPUR AREA||LKP_CIVIL||CIVIL |
29-Jul-2021 |
09-Jul-2023 |
20-Sep-2021 |
TO EXTEND THE DEBARMENT PERIOD |
47 |
DULALI KARMAKAR |
Mahanadi Coalfields Limited |
02-Sep-2021 |
13-Aug-2023 |
08-Jul-2021 |
Revoked to extend the debarment period |
48 |
ROYAL TRAVELS |
Coal India Limited |
09-Aug-2021 |
28-Jul-2023 |
20-Sep-2021 |
Stay Order Received from Competent Authority |
49 |
DULALI KARMAKAR |
Mahanadi Coalfields Limited |
08-Jul-2021 |
30-Jun-2023 |
02-Sep-2021 |
Revoked to extend the debarment period |
50 |
DULALI KARMAKAR |
Mahanadi Coalfields Limited |
08-Jul-2021 |
30-Jun-2023 |
02-Sep-2021 |
Revoked to extend the debarment period |
51 |
KUSHAL PATEL |
Mahanadi Coalfields Limited |
27-Jul-2021 |
25-Jul-2023 |
02-Jul-2021 |
Revoked to extend the debarment period |
52 |
DURGA ELECTRICAL AND ELECTRONICS |
Mahanadi Coalfields Limited |
27-May-2021 |
26-May-2023 |
19-May-2022 |
As per Letter No.GM(JA)/SO(E and M)/General/2022-23/416, Dtd.18/05/2022 of Staff Officer(E and M), Jagannath Area, MCL |
53 |
Joy Global (India) Limited |
Coal India Limited |
18-Aug-2021 |
11-Aug-2023 |
18-Nov-2021 |
The banning order will not be applicable for supply of spares and consumables and rendering associated services in respect of the existing P and H make ER Shovels operating in CIL and its subsidiaries. |
54 |
PEE INDUSTRIAL VALVES PVT. LTD. |
Engineers India Limited,MoPNG |
20-Nov-2019 |
19-Nov-2020 |
02-May-2024 |
Revoked by CA |
55 |
Suncity Enterprises |
Coal India Limited |
24-Dec-2021 |
21-Dec-2023 |
15-Mar-2022 |
As per the request of competent Authority |
56 |
Suncity Enterprises |
Coal India Limited |
24-Dec-2021 |
21-Dec-2023 |
15-Mar-2022 |
As per the request of competent Authority |
57 |
M/S ANIL PRASAD SONI |
Coal India Limited |
07-Sep-2021 |
05-Sep-2023 |
07-Sep-2021 |
Wrong dates entered |
58 |
M/S ANIL PRASAD SONI |
Coal India Limited |
07-Sep-2021 |
05-Aug-2023 |
07-Sep-2021 |
Wrong dates entered |
59 |
TELMART INFRASTRUCTURE PRIVATE LIMITED |
Mahanadi Coalfields Limited |
15-Dec-2021 |
12-Dec-2023 |
04-Jun-2022 |
Imposition of fresh debarment, vide Letter Nos.MCL/GM(HA)/SO(C)/Banning/2022/433, Dtd.03/06/2022 of Staff Officer(Civil), Hingula Area, MCL |
60 |
M/s AU-DARCL (JV) |
Western Coalfields Limited |
09-Dec-2021 |
07-Dec-2023 |
14-Jan-2022 |
The debarment/ blacklisting issued by WCL vide order dated 07.12.2021 has been revoked/withdrawn on 15.01.2022 by virtue of the order of Honble High Court dated 14.01.2022 in Writ petition bearing no.5554 of 2021 |
61 |
DURGA ELECTRICALSAND ELECTRONICS |
Mahanadi Coalfields Limited |
27-May-2021 |
26-May-2023 |
19-May-2022 |
As per Letter No.GM(JA)/SO(E and M)/General/2022-23/416, Dtd.18/05/2022 of Staff Officer(E and M), Jagannath Area, MCL |
62 |
KUSHAL PATEL |
Mahanadi Coalfields Limited |
05-Jun-2021 |
03-Jun-2023 |
02-Jul-2021 |
Revoked to extend the debarment period |
63 |
DULALI KARMAKAR |
Mahanadi Coalfields Limited |
16-Mar-2021 |
14-Mar-2023 |
08-Jul-2021 |
Revoked to extend the debarment period |
64 |
DULALI KARMAKAR |
Mahanadi Coalfields Limited |
16-Mar-2021 |
14-Mar-2023 |
08-Jul-2021 |
Revoked to extend the debarment period |
65 |
DULALI KARMAKAR |
Mahanadi Coalfields Limited |
02-Sep-2021 |
13-Aug-2023 |
08-Jul-2021 |
Revoked to extend the debarment period |
66 |
KUSHAL PATEL |
Mahanadi Coalfields Limited |
05-Jun-2021 |
03-Jun-2023 |
02-Jul-2021 |
Revoked to extend the debarment period |
67 |
DURGA ELECTRICALSAND ELECTRONICS |
Mahanadi Coalfields Limited |
27-May-2021 |
26-May-2023 |
19-May-2022 |
As per Letter No.GM(JA)/SO(E and M)/General/2022-23/416, Dtd.18/05/2022 of Staff Officer(E and M), Jagannath Area, MCL |
68 |
KRISHNA CHANDRA DHAR |
Mahanadi Coalfields Limited |
31-May-2021 |
31-May-2023 |
26-Apr-2021 |
penal action shall be taken at a later date after approval of competent authority |
69 |
ayush sharma |
Mahanadi Coalfields Limited |
31-May-2021 |
29-May-2023 |
29-Jul-2021 |
TO EXTEND THE DEBARMENT PERIOD |
70 |
International Commercial Industries |
Coal India Limited |
30-Jul-2021 |
14-May-2023 |
02-Aug-2021 |
Withholding penalty imposition and visit of technical team to work |
71 |
Archon Powerinfra India Pvt. Ltd. |
Indian Oil Corporation Limited |
26-Oct-2019 |
15-Sep-2022 |
06-Nov-2019 |
Revoking the Blacklisting of vendor M/s Archon Powerinfra India Pvt. Ltd. in view of Calcutta High Court Order dt. 30.1.2019 |
72 |
SIDDHARTHA SENGUPTA |
Mahanadi Coalfields Limited,BASUNDHARA GARJANBAHAL AREA,BG_E AND M |
10-Jun-2021 |
10-Jun-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
73 |
SIDDHARTHA SENGUPTA |
Mahanadi Coalfields Limited,ORIENT AREA,ORIEN_MINING,MINING |
11-May-2021 |
10-May-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
74 |
SIDDHARTHA SENGUPTA |
Northern Coalfields Limited||Dudichua Project |
27-Jul-2021 |
25-Jul-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
75 |
siddhartha sengupta |
Northern Coalfields Limited||Dudichua Project |
02-Sep-2021 |
18-Aug-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
76 |
M/S TULSI CONSTRUCTION |
Indian Oil Corporation Limited |
26-Oct-2019 |
05-Mar-2021 |
18-Dec-2019 |
Revoked as per the new Debarment Order-UPSO-I/ENG/PT-72/2018-19 upto 11.12.2022 |
77 |
KUSHAL PATEL |
Mahanadi Coalfields Limited |
27-Jul-2021 |
25-Jul-2023 |
02-Jul-2021 |
Revoked to extend the debarment period |
78 |
Magnate marine and engineering services |
Indian Oil Corporation Limited |
03-Dec-2019 |
25-Nov-2022 |
03-Dec-2019 |
Debarment type has been selected as organisation instead of against portal |
79 |
ayush sharma |
Mahanadi Coalfields Limited,ORIENT AREA,ORIEN_MINING,MINING |
03-Mar-2021 |
03-Mar-2023 |
29-Jul-2021 |
TO EXTEND THE DEBARMENT PERIOD |
80 |
Magnate marine and engineering services |
Indian Oil Corporation Limited |
03-Dec-2019 |
25-Nov-2022 |
03-Dec-2019 |
Debarment type has been selected as organisation instead of against portal |
81 |
Shiv Pharmaceuticals |
Indian Oil Corporation Limited |
16-Dec-2019 |
15-Dec-2022 |
03-Feb-2020 |
Courts stay order |
82 |
ayush sharma |
Mahanadi Coalfields Limited |
29-Jul-2021 |
06-Jul-2023 |
29-Jul-2021 |
TO EXTEND THE DEBARMENT PERIOD |
83 |
COASTAL MARINE CONST. & ENGG. LTD |
Hindustan Petroleum Corporation Limited |
03-Nov-2021 |
02-Nov-2024 |
02-Nov-2022 |
Appellate Authority has decided to reduce period of Holiday listing of the Appellant on compassionate to one year |
84 |
M/s Naik Construction |
Mahanadi Coalfields Limited,ORIENT AREA,ORIEN_MINING,MINING |
07-Sep-2021 |
07-Sep-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
85 |
M/S RIYAZUDDIN ANSARI |
Coal India Limited |
30-Nov-2021 |
29-Oct-2022 |
26-Nov-2021 |
Need to modify The banning period |
86 |
Compulinks |
Indian Oil Corporation Limited |
26-Nov-2019 |
14-Mar-2023 |
05-Feb-2020 |
Republish Debarment Type as Against portal |
87 |
COMPULINKS |
Indian Oil Corporation Limited |
26-Nov-2019 |
14-Mar-2023 |
05-Feb-2020 |
Republish Debarment Type as Against portal |
88 |
CJ Darcl Logistics Limited |
Western Coalfields Limited |
09-Dec-2021 |
07-Dec-2023 |
14-Jan-2022 |
The debarment/ blacklisting issued by WCL vide order dated 07.12.2021 has been revoked/withdrawn on 15.01.2022 by virtue of the order of Honble High Court dated 14.01.2022 in Writ petition bearing no.5554 of 2021 |
89 |
CJ DARCL Logistics Limited |
Western Coalfields Limited |
09-Dec-2021 |
07-Dec-2023 |
14-Jan-2022 |
The debarment/ blacklisting issued by WCL vide order dated 07.12.2021 has been revoked/withdrawn on 15.01.2022 by virtue of the order of Honble High Court dated 14.01.2022 in Writ petition bearing no.5554 of 2021 |
90 |
Darcl Logistics Ltd. |
Western Coalfields Limited |
09-Dec-2021 |
07-Dec-2023 |
14-Jan-2022 |
The debarment/ blacklisting issued by WCL vide order dated 07.12.2021 has been revoked/withdrawn on 15.01.2022 by virtue of the order of Honble High Court dated 14.01.2022 in Writ petition bearing no.5554 of 2021 |
91 |
GANPAT STEEL |
Indian Oil Corporation Limited |
05-Nov-2019 |
20-Sep-2022 |
19-Dec-2020 |
Appellate Authority has decided to condone remaining period of Holiday listing of the Appellant, M/s Ganpat Steel, with effect from the date of this order. |
92 |
SOUDARSHINI VALVE PRIVATE LIMITED |
Engineers India Limited,MoPNG |
30-Jun-2023 |
31-Dec-2023 |
03-Jan-2024 |
Revoked by CA |
93 |
KRISHNA CHANDRA DHAR |
Mahanadi Coalfields Limited |
31-May-2021 |
31-May-2023 |
26-Apr-2021 |
penal action shall be taken at a later date after approval of competent authority |
94 |
siddhartha sengupta |
Northern Coalfields Limited||Dudichua Project |
27-Jul-2021 |
25-Jul-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
95 |
SIDDHARTHA SENGUPTA |
Northern Coalfields Limited||Dudichua Project |
08-Jul-2021 |
09-Jun-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
96 |
NARAYAN MUKHERJEE AND CO |
IndianOil,Refineries,AOD Digboi |
15-Jan-2021 |
11-Jan-2024 |
24-Aug-2021 |
As per approval ref no DR/RC/20/21------- Dated 29.07.2021 |
97 |
SHANKAR ENTERPRISES |
IndianOil,Marketing,Uttar Pradesh State Office-1 |
18-Mar-2021 |
14-Mar-2024 |
31-Jan-2022 |
Internal Approval |
98 |
Vijay Tours & Travels |
Coal India Limited |
12-May-2021 |
07-May-2023 |
25-Jul-2022 |
Banning order has been withdrawn vide the letter reference dated WCL/CGM/Area/E and M/2022-23/146 Dated 21.07.2022 issued by SO E and M Ballarpur Area, WCL, in compliance with Bombay High Court order dated 30.06.2022 |
99 |
M/s. S B Enterprises |
Northern Coalfields Limited |
20-Dec-2021 |
16-Dec-2023 |
31-Dec-2021 |
Inadvertently banning has been placed by TIA |
100 |
Sai Shakti JV. |
Mahanadi Coalfields Limited |
12-Mar-2021 |
10-Mar-2023 |
16-Dec-2021 |
AS PER THE COMMUNICATION OF SO EnM BHARATPUR AREA VIDE LETTER NO.532 DTD02.12.2021 |
101 |
SANJAY KUMAR SINGH |
Mahanadi Coalfields Limited |
12-Mar-2021 |
10-Mar-2023 |
16-Dec-2021 |
AS PER THE COMMUNICATION OF SO EnM BHARATPUR AREA VIDE LETTER NO.532 DTD02.12.2021 |
102 |
R.R. ELECTRICAL |
Mahanadi Coalfields Limited |
15-Apr-2021 |
13-Apr-2023 |
07-Jul-2021 |
Revoked for extending the debarment period |
103 |
R.R. ELECTRICAL |
Mahanadi Coalfields Limited |
07-Jul-2021 |
29-Jun-2023 |
07-Jul-2021 |
Revoked for extending the debarment period |
104 |
M/S ENTERPRISES |
Mahanadi Coalfields Limited |
23-Jul-2021 |
21-Jul-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
105 |
SULOCHANA PRADHAN |
Mahanadi Coalfields Limited,TALCHER AREA,TALCH_CIVIL,CIVIL |
25-Nov-2021 |
06-Sep-2023 |
18-Jan-2022 |
To extend the debarment period |
106 |
M/s. S B Enterprises |
Northern Coalfields Limited |
20-Dec-2021 |
16-Dec-2023 |
31-Dec-2021 |
Inadvertently banning has been placed by TIA |
107 |
Rakesh Kumar Sahoo |
Mahanadi Coalfields Limited,BHARATPUR AREA,BHART_CIVIL,CIVIL |
29-Dec-2021 |
29-Dec-2023 |
15-Feb-2022 |
For imposition of new debarment, vide Letter No. CMS/NSCH/CHA/S(C)/2021-22/1178, Dtd.11/02/2022 of SO(C), NSCH, CH Area, MCL |
108 |
RAKESH KUMAR SAHOO |
Mahanadi Coalfields Limited,BHARATPUR AREA,BHART_CIVIL,CIVIL |
29-Dec-2021 |
29-Dec-2023 |
15-Feb-2022 |
For imposition of new debarment, vide Letter No. CMS/NSCH/CHA/S(C)/2021-22/1178, Dtd.11/02/2022 of SO(C), NSCH, CH Area, MCL |
109 |
RAKESH KUMAR SAHOO |
Mahanadi Coalfields Limited,BHARATPUR AREA,BHART_CIVIL,CIVIL |
29-Dec-2021 |
28-Dec-2023 |
15-Feb-2022 |
For imposition of new debarment, vide Letter No. CMS/NSCH/CHA/S(C)/2021-22/1178, Dtd.11/02/2022 of SO(C), NSCH, CH Area, MCL |
110 |
SANJAY KUMAR SINGH |
Mahanadi Coalfields Limited |
12-Mar-2021 |
10-Mar-2023 |
16-Dec-2021 |
AS PER THE COMMUNICATION OF SO EnM BHARATPUR AREA VIDE LETTER NO.532 DTD02.12.2021 |
111 |
M/S ENTERPRISES |
Mahanadi Coalfields Limited |
23-Jul-2021 |
21-Jul-2023 |
11-Nov-2021 |
TO EXTEND THE DEBARMENT PERIOD |
112 |
R.R. ELECTRICAL |
Mahanadi Coalfields Limited |
15-Apr-2021 |
13-Apr-2023 |
07-Jul-2021 |
Revoked for extending the debarment period |
113 |
JHUNU SAHOO |
Mahanadi Coalfields Limited,HINGULA AREA,HING_CIVIL,CIVIL |
11-Jun-2021 |
07-Jun-2023 |
10-May-2022 |
Change in Debarment criteria as per Letter No.MCL/GM(HA)/SO(C)/Termination/2022-23/353, Dtd 06/05/2022 of Staff Officer(Civil), Hingula Area, MCL |
114 |
R.R. ELECTRICAL |
Mahanadi Coalfields Limited |
07-Jul-2021 |
29-Jun-2023 |
07-Jul-2021 |
Revoked for extending the debarment period |
115 |
JHUNU SAHOO |
Mahanadi Coalfields Limited,HINGULA AREA,HING_CIVIL,CIVIL |
11-Jun-2021 |
07-Jun-2023 |
10-May-2022 |
Change in Debarment criteria as per Letter No.MCL/GM(HA)/SO(C)/Termination/2022-23/353, Dtd 06/05/2022 of Staff Officer(Civil), Hingula Area, MCL |
116 |
VIKASH KUMAR AGRAWAL |
Mahanadi Coalfields Limited |
13-May-2021 |
12-May-2023 |
07-Jul-2021 |
Revoked for extending the debarment period |
117 |
COMPULINKS |
IndianOil,Pipelines |
05-Feb-2020 |
14-Mar-2023 |
02-Sep-2021 |
Republish Debarment Type as Against portal |
118 |
Compulinks |
IndianOil,Pipelines |
05-Feb-2020 |
14-Mar-2023 |
02-Sep-2021 |
Republish Debarment Type as Against portal |
119 |
PRODYUT KR MUKHERJEE |
IndianOil,Marketing,Bihar State Office |
12-Feb-2020 |
23-Dec-2022 |
12-Feb-2020 |
bidder has been debarred against Organization WHICH SHOULD BE AGAINST PORTAL AS PER TENDER RULES AND MAIL DATED 12.02.2020 FROM COIS TENDER TEAM |
120 |
IRCLASS Systems and Solutions Private Limited |
IndianOil,Refineries,Panipat Refinery |
27-Jan-2021 |
26-Jan-2024 |
07-Dec-2021 |
Period of Holiday Listing reduced from 3 years to 1 year. |
121 |
NARAYAN MUKHERJEE AND CO |
IndianOil,Refineries,AOD Digboi |
15-Jan-2021 |
11-Jan-2024 |
24-Aug-2021 |
As per approval ref no DR/RC/20/21------- Dated 29.07.2021 |
122 |
Arun Excello Urban Infrastructure Pvt Ltd |
IndianOil,Refineries,Gujarat Refinery |
16-Dec-2021 |
09-Dec-2022 |
11-Feb-2022 |
PERIOD INCORRECT. |
123 |
IRCLASS Systems And Solutions Pvt Ltd |
IndianOil,Refineries,Panipat Refinery |
27-Jan-2021 |
26-Jan-2024 |
07-Dec-2021 |
Period of Holiday Listing reduced from 3 years to 1 year. |
124 |
R P PANDEY |
IndianOil,Marketing,Western Region Office |
22-Jan-2021 |
20-Jan-2024 |
05-Feb-2020 |
Republish Debarment Type as Against portal |
125 |
IRCLASS SYSTEMS AND SOLUTIONS PRIVATE LIMITED |
IndianOil,Refineries,Panipat Refinery |
27-Jan-2021 |
26-Jan-2024 |
07-Dec-2021 |
Period of Holiday Listing reduced from 3 years to 1 year. |
126 |
AVLIN AUTOMATION AND INSTRUMENTATION INDIA |
IndianOil,Refineries,AOD Digboi |
20-Nov-2020 |
18-Nov-2023 |
18-May-2022 |
APPROVAL OF APPELLATE AUTHORITY |
127 |
DelVal Flow Controls Pvt Ltd |
IndianOil,Marketing |
01-Apr-2021 |
30-Mar-2023 |
18-May-2021 |
Approval from ED I/c (Engg and Pj) ,HO was obtained for de listing of M/s Del Val Flow Control from holiday listing. |
128 |
DELVAL FLOW CONTROLS PVT. LTD. |
IndianOil,Marketing |
01-Apr-2021 |
30-Mar-2023 |
18-May-2021 |
Approval from ED I/c (Engg and Pj) ,HO was obtained for de listing of M/s Del Val Flow Control from holiday listing. |
129 |
Delval Flow Controls Pvt Ltd |
IndianOil,Marketing |
01-Apr-2021 |
30-Mar-2023 |
18-May-2021 |
Approval from ED I/c (Engg and Pj) ,HO was obtained for de listing of M/s Del Val Flow Control from holiday listing. |
130 |
JANTA ENGINEERS & CO. (IRON) |
IndianOil,Refineries,Panipat Refinery |
08-Mar-2021 |
07-Mar-2024 |
06-Feb-2020 |
Debarred under wrong scope |
131 |
Delval Flow Controls. Pvt. Ltd. |
IndianOil,Marketing |
01-Apr-2021 |
30-Mar-2023 |
18-May-2021 |
Approval from ED I/c (Engg and Pj) ,HO was obtained for de listing of M/s Del Val Flow Control from holiday listing. |
132 |
M/s RANJEET KUMAR |
IndianOil,Marketing,Southern Region and Tamilnadu State Office |
30-Mar-2021 |
28-Mar-2024 |
30-Mar-2021 |
RCC SR has also Blacklisted_Holiday listed M_S Ranjeet Kumar for three 3 years w.e.f. 29.03.2021. The Period of Holiday listing 29.03.2021 to 28.03.2024. |
133 |
SAI VIKAS ENTERPRISES |
IndianOil,Marketing,Southern Region and Tamilnadu State Office |
30-Mar-2021 |
25-Mar-2024 |
30-Mar-2021 |
RCC SR has also blacklisted M_S SAI VIKAS ENTERPRISE till 25.03.2024. So posting Revocation for Fresh Debarment till 25.03.2024 |
134 |
Roop Rajat Transport Co. |
IndianOil,Marketing,Northern Region Office |
27-Dec-2021 |
15-Dec-2022 |
04-Mar-2022 |
As per recommendation of committee vide approval ref In-Principle Approval/1000/EN00/2021-2022/22412 dtd 17.02.2022 approved by ED(RS) NR on 25.02.2022 |
135 |
MAHAVEER TANKERS |
IndianOil,Marketing,Northern Region Office |
27-Dec-2021 |
15-Dec-2022 |
04-Mar-2022 |
As per recommendation of committee vide approval ref In-Principle Approval/1000/EN00/2021-2022/22412 dtd 17.02.2022 approved by ED(RS) NR on 25.02.2022 |
136 |
ROOP RAJAT TRANSPORT CO |
IndianOil,Marketing,Northern Region Office |
27-Dec-2021 |
15-Dec-2022 |
04-Mar-2022 |
As per recommendation of committee vide approval ref In-Principle Approval/1000/EN00/2021-2022/22412 dtd 17.02.2022 approved by ED(RS) NR on 25.02.2022 |
137 |
Mahaveer Tankers |
IndianOil,Marketing,Northern Region Office |
27-Dec-2021 |
15-Dec-2022 |
04-Mar-2022 |
As per recommendation of committee vide approval ref In-Principle Approval/1000/EN00/2021-2022/22412 dtd 17.02.2022 approved by ED(RS) NR on 25.02.2022 |
138 |
LALITA DEVI PATEL |
IndianOil,Marketing,Northern Region Office |
27-Dec-2021 |
15-Dec-2022 |
04-Mar-2022 |
As per recommendation of committee vide approval ref In-Principle Approval/1000/EN00/2021-2022/22412 dtd 17.02.2022 approved by ED(RS) NR on 25.02.2022 |
139 |
Delval Flow Controls Pvt. Ltd. |
IndianOil,Marketing |
01-Apr-2021 |
30-Mar-2023 |
18-May-2021 |
Approval from ED I/c (Engg and Pj) ,HO was obtained for de listing of M/s Del Val Flow Control from holiday listing. |
140 |
Genesis |
IndianOil,Marketing,Odisha State Office |
17-Jul-2020 |
30-Jun-2023 |
18-Jul-2020 |
Modification |
141 |
3S Security Services |
IndianOil,Marketing,IBP Kolkata |
21-Jul-2020 |
14-Jul-2023 |
22-Jul-2020 |
Mistake in procedure |
142 |
JANTA ENGINEERS AND CO. (IRON) |
IndianOil,Refineries,Panipat Refinery |
08-Mar-2021 |
07-Mar-2024 |
06-Feb-2020 |
Debarred under wrong scope |
143 |
DelVal flow controls Pvt Ltd |
IndianOil,Marketing |
01-Apr-2021 |
30-Mar-2023 |
18-May-2021 |
Approval from ED I/c (Engg and Pj) ,HO was obtained for de listing of M/s Del Val Flow Control from holiday listing. |
144 |
Goldmine Advertising Ltd. |
IndianOil,Marketing |
17-Dec-2021 |
15-Dec-2022 |
07-Jul-2022 |
Upon review by Appellate Authority. |
145 |
Goldmine Advertising Limited |
IndianOil,Marketing |
17-Dec-2021 |
15-Dec-2022 |
07-Jul-2022 |
Upon review by Appellate Authority. |
146 |
M/S LADU SINGH RAWAT |
IndianOil,Marketing,Northern Region Office |
22-Dec-2021 |
15-Dec-2022 |
04-Mar-2022 |
As per recommendation of committee vide approval ref In-Principle Approval/1000/EN00/2021-2022/22412 dtd 17.02.2022 approved by ED(RS) NR on 25.02.2022 |
147 |
M/S LADU SINGH RAWAT |
IndianOil,Marketing,Northern Region Office |
22-Dec-2021 |
15-Dec-2022 |
04-Mar-2022 |
As per recommendation of committee vide approval ref In-Principle Approval/1000/EN00/2021-2022/22412 dtd 17.02.2022 approved by ED(RS) NR on 25.02.2022 |
148 |
M/S A.R. ENGINEERING COMPANY, |
Oil and Natural Gas Corporation Limited |
06-Jan-2016 |
31-Dec-2029 |
03-Apr-2023 |
As per attachment |
149 |
M/S PERMIAN PEAK OIL PRIVATE LIMITED, |
Oil and Natural Gas Corporation Limited |
08-Jun-2023 |
07-Jun-2025 |
07-Dec-2023 |
As per attachment |
150 |
GOPAL TEKNOCON PVT LTD |
Engineers India Limited,MoPNG |
20-Sep-2021 |
19-Sep-2024 |
02-May-2024 |
approved by CA |
151 |
M/S SPECTRON ENGINEERS PRIVATE LIMITED |
Oil and Natural Gas Corporation Limited |
09-Jan-2024 |
08-Jan-2025 |
19-Mar-2024 |
As per High Court Order |
152 |
KUNJ FORGINGS PVT LTD. |
Engineers India Limited,MoPNG |
01-Nov-2018 |
30-Sep-2026 |
02-May-2024 |
Revoked by CA |
153 |
CHLORIDE POWER SYSTEMS & SOLUTIONS LIMITED |
Engineers India Limited,MoPNG |
10-Mar-2021 |
30-Sep-2026 |
02-May-2024 |
Revoked by CA |
154 |
CHLORIDE POWER SYSTEMS & SOLUTIONS LIMITED |
Engineers India Limited,MoPNG |
10-Mar-2021 |
31-Dec-2022 |
02-May-2024 |
Revoked by CA |
155 |
PEE INDUSTRIAL VALVES PVT. LTD |
Engineers India Limited,MoPNG |
20-Nov-2019 |
30-Sep-2026 |
02-May-2024 |
Revoked by CA |
156 |
M/S AKHIL AHMED CONTRACTOR |
Bharat Petroleum Corporation Limited |
10-Jan-2023 |
09-Jan-2025 |
30-Sep-2024 |
DUPLICATE |
157 |
M/S. VALVE TECH INDUSTRIES |
Bharat Petroleum Corporation Limited |
16-Feb-2023 |
15-Feb-2026 |
30-Sep-2024 |
Duplicate copy |
158 |
M/S N.G. GADHYIA |
Bharat Petroleum Corporation Limited |
17-Mar-2022 |
16-Mar-2025 |
30-Sep-2024 |
DUPLICATE |
159 |
M/S. CABTECH INTERNATIONAL |
Bharat Petroleum Corporation Limited |
26-Jul-2023 |
25-Jul-2026 |
30-Sep-2024 |
Refer attached document |
160 |
M/S. HARSH CONSTRUCTION |
Bharat Petroleum Corporation Limited |
16-Aug-2017 |
31-Dec-2029 |
30-Sep-2024 |
Refer attached document |
161 |
M/S. RUBBER GENERATING & PROCESSING COMPANY |
Bharat Petroleum Corporation Limited |
26-Jul-2023 |
25-Jul-2026 |
30-Sep-2024 |
Duplicate |
162 |
M/S. FENT EPC PROJECTS |
Bharat Petroleum Corporation Limited |
29-Mar-2022 |
28-Mar-2025 |
30-Sep-2024 |
DUPLICATE COPY |
163 |
M/S. P.J.CONSTRUCTION |
Bharat Petroleum Corporation Limited |
16-Aug-2017 |
31-Dec-2029 |
30-Sep-2024 |
Refer attached document |
164 |
M/S. JECON ENGINEERS PVT LTD |
Bharat Petroleum Corporation Limited |
24-May-2022 |
23-May-2025 |
30-Sep-2024 |
Refer attached document |
165 |
M/S. SATISH ENTERPRISES |
Bharat Petroleum Corporation Limited |
09-Aug-2017 |
31-Dec-2029 |
30-Sep-2024 |
Refer attached document |
166 |
M/S. GABRIEL INTELLIGENCE MANPOWER SERVICES |
Bharat Petroleum Corporation Limited |
30-Dec-2022 |
29-Dec-2025 |
30-Sep-2024 |
DUPLICATE COPY |
167 |
M/S. NAND NEEL ENGG. SERVICES |
Bharat Petroleum Corporation Limited |
10-Jul-2017 |
31-Dec-2029 |
30-Sep-2024 |
Refer attached document |
168 |
M/S. SUNSHRI ENTERPRISES |
Bharat Petroleum Corporation Limited |
09-Aug-2017 |
31-Dec-2029 |
30-Sep-2024 |
Refer attached document |
169 |
M/S. VIJAY CONSTRUCTION |
Bharat Petroleum Corporation Limited |
16-Aug-2017 |
31-Dec-2029 |
30-Sep-2024 |
Refer attached document |
170 |
M/S.YASHWANT AGRAWAL & CO |
Bharat Petroleum Corporation Limited |
28-Oct-2016 |
31-Dec-2029 |
30-Sep-2024 |
Refer attached document |
171 |
SHILPI ENGINEERING PVT. LTD. |
Bharat Petroleum Corporation Limited |
13-Sep-2023 |
12-Sep-2026 |
30-Sep-2024 |
Refer attached document |
172 |
M/S. ADD ECESSORIES |
Bharat Petroleum Corporation Limited |
10-Oct-2024 |
09-Oct-2025 |
10-Oct-2024 |
duplicate |
173 |
C&S ELECTRIC LIMITED |
Engineers India Limited,MoPNG |
12-Aug-2021 |
07-Aug-2024 |
08-Nov-2024 |
Revoked by competent authority of EIL |