उच्च मूल्य की निविदाएं खोजें - केंद्रीय
Value of Tenders (Service - 1Cr above, Goods- 50Cr above and Works- 100Cr above)

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
H4BQLY
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 481
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
401. 24-Jul-2025 01:00 PM 30-Oct-2025 11:00 AM 31-Oct-2025 11:30 AM Widening of exis 2L to 4L divided carriageway with PS from Km243.800 to Km270.500 of NH 39(Rewa to Churhat Tunnel North portal excluding Churhat Tunnel)and from Km286.200 to Km 313.700 of NH39(Churhat to Sidhi sec)L-54.20 Km under NH(O) in MP on HAM/MPDIV/16 /2024-NHAI- RO Bhopal (266127)/2025_NHAI_242402_1 National Highways Authority of India icon image
402. 24-Jul-2025 12:00 PM 18-Nov-2025 11:00 AM 19-Nov-2025 11:30 AM Construction of 4 lane Greenfield Section of NH-33 from Mokama (Design Ch. 0.000) to Munger (Design Ch. 82.400) in the State of Bihar on Hybrid Annuity Mode/PROJ/34/2025 Bihar Division/2025_NHAI_242359_1 National Highways Authority of India icon image
403. 24-Jul-2025 09:00 AM 18-Nov-2025 11:00 AM 19-Nov-2025 11:30 AM Construction of 4 laning of Sahebganj Areraj Bettiah of NH 139W (Total length 78.942 km) in the State of Bihar on Hybrid Annuity Mode comprising (i) Section 1 Sahebganj to Areraj (38.362 km) and (ii) Section 2 Areraj to Bettiah (40.580 km)/BRDIV-20021/11/2025 Bihar Division/2025_NHAI_242354_1 National Highways Authority of India icon image
404. 22-Jul-2025 05:30 PM 30-Oct-2025 11:00 AM 31-Oct-2025 11:30 AM Up-gradation of existing 2 lane to 4 lane with paved shoulder from Deshgaon to Julwaniya section of NH-347B from design km 0.000 Existing km 99.924 on NH-347BG to design km 108.643 (Ex km 129.900 on NH-52) under NH(O) in Madhya Pradesh on HAM/MPDIV-21017/ 38/2025-MP Division/2025_NHAI_242181_1 National Highways Authority of India icon image
405. 22-Jul-2025 05:05 PM 30-Oct-2025 11:00 AM 31-Oct-2025 11:30 AM Construction of 2 lane with paved shoulder from Hiwarkhedi-Roshni NH-347B from km 0.000-km 90.010 and 2-4 Lane from km 114.000 near Ashapur Village to km 149.000 near Rudhy village of Betul-Khandwa corridor 125.010 km in MP on HAM under NHO/MPDIV-21017/37/ 2025-MP Division/2025_NHAI_242172_1 National Highways Authority of India icon image
406. 21-Jul-2025 06:15 PM 28-Oct-2025 11:00 AM 29-Oct-2025 11:30 AM Consultancy Services for preparation of Detailed Project Report of Construction of Bikaner to Kotputli expressway in the state of Rajasthan/Tech/Raj/ DPR/BK/2025_NHAI_242067_1 National Highways Authority of India icon image
407. 21-Jul-2025 05:06 PM 09-Dec-2025 03:00 PM 09-Dec-2025 03:00 PM Design, Supply, Erection, Testing and Commissioning of 132/55KV Scott Connected Traction Substation and Switching Posts for 2x25KV feeding system between Godhra-Ratlam section of Ratlam Division of Western Railway./EL-TRD-58-2x25-EPC-PSI-01/82386309 Ministry of Railways --
408. 19-Jul-2025 09:00 AM 03-Nov-2025 11:00 AM 04-Nov-2025 11:30 AM Operation and Maintenance of Jalandhar Amritsar section of NH03 from Km 387.100 to Km 456.100 Bidhipur to Verka junction in the state of Punjab for 7 years on Performance Based Maintenance Contract (PBMC) mode/PROJ 15017/5/2025 Punjab Division/e 287938/2025_NHAI_241862_1 National Highways Authority of India icon image
409. 17-Jul-2025 07:12 PM 14-Nov-2025 11:00 AM 14-Nov-2025 11:00 AM Design, Supply, Erection, Testing and Commissioning of 220kV/2X25 kV Scott connected Traction Sub Station and switching posts with AT feeding between Bilaspur (Incl.) - Raigarh (Incl.) and Champa- Gevra road- Surakachhar Section of Bilaspur Division SEC Railway in connection with Up- gradation of Electric Traction System from 1x25 kV to 2x25 kV Traction System of SECR to meet 3000 MT loading target./CPM-ELECT-EPC-2025-26-09/83107890 Ministry of Railways --
410. 17-Jul-2025 06:55 PM 27-Oct-2025 06:00 PM 31-Oct-2025 05:00 PM Development of New Greenfield Airport at Bundi, Kota Rajasthan. Detailed Designing, Engineering, Procurement and Construction of New Terminal Building, ATC Tower, Fire Station, Car Parking, City Side Development and other associated works./AAI/CHQ-NR/ENGG(C)/KOTA/TB/2025_AAI_241133_1 Airports Authority of India icon image

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।