उच्च मूल्य की निविदाएं खोजें - केंद्रीय
Value of Tenders (Service - 1Cr above, Goods- 50Cr above and Works- 100Cr above)

# कीवर्ड निविदा आईडी, निविदा शीर्षक, निविदा संदर्भ संख्या और निविदा विवरण में मिलान ढूंढता है
Image CAPTCHA
छवि में दिखाए गए अक्षर दर्ज करें.
कुल निविदाएं : 474
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी संगठन का नाम शुद्धिपत्र
461. 21-Nov-2025 01:55 PM 24-Sep-2026 12:00 PM 30-Sep-2026 03:30 PM Widening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (Koksara) to km 294.280 (Nabarangpur) on NH-26 in Kalahandi and Nabarangpur districts in the state of Odisha under the EPC mode/07 CE NH of 2025-26/2025_MoRTH_886386_1 Ministry of Road Transport and Highways icon image
462. 04-Nov-2025 04:35 PM 22-Sep-2026 05:30 PM 24-Sep-2026 01:00 PM Rehabilitation and upgradation of NH 548B from km 289.300 to km 342.890 Maharashtra Karnataka Border to two lane with paved shoulder configuration in the state of Maharashtra on EPC mode Total length 52.556 km/NHD/TC/2882/2025 DT 04/11/2025/2025_MoRTH_884165_1 Ministry of Road Transport and Highways icon image
463. 03-Oct-2025 05:00 PM 29-Sep-2026 03:00 PM 30-Sep-2026 03:00 PM Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka/RW/ BNG /NH-150A/Maski Sindhanur Bypass/62/2023( 2nd Call)/2025_MoRTH_880046_1 Ministry of Road Transport and Highways icon image
464. 12-Sep-2025 06:30 PM 30-Sep-2026 11:00 AM 01-Oct-2026 11:30 AM Upgradation to 2 Lane with Paved Shoulders from Design km 0.000 to km 48.742 and km 61.732 to km 102.284 of Bagasara-Una Section of NH-351K in the State of Gujarat on Hybrid Annuity Mode/RW/NH-12014/136/2024/GJ/Zone-V/2025_MoRTH_877249_1 Ministry of Road Transport and Highways icon image
465. 18-Aug-2025 03:00 PM 15-Oct-2026 11:00 AM 16-Oct-2026 11:30 AM Construction of 6-lane Elevated Corridor from Maduravoyal Junction (Chainage Km 13.965) Chennai Outer Ring Road (Chainage Km 22.100) including Junction Improvements at km. 22.368 of NH-48 (Old NH4) in Tamil Nadu on Hybrid Annuity Mode (Project Lengt/TNDIV-21013/64 /2024-PIU Chennai-I/2025_NHAI_245545_1 National Highways Authority of India icon image
466. 07-Aug-2025 04:30 PM 30-Sep-2026 11:00 AM 01-Oct-2026 11:30 AM Construction of six lane Greenfield Highway starting from its Junction with NH4B (New NH348) near Pagote (Design km. 0.000) till its Junction on NH48 at Chowk (Design km. 29.219) in Maharashtra to be executed on BOT (Toll) mode under NH(O)/NHAI/PIU/Panvel/ Pagote-Chowk/PATSC and SFC/2025_NHAI_244402_1 National Highways Authority of India icon image
467. 10-Jun-2025 05:30 PM 28-Sep-2026 05:30 PM 30-Sep-2026 12:30 PM Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to 2-LPS in the State of Madhya Pradesh on EPC Mode/CE-RO/BHP/Tender/05/2025-26/2025_MoRTH_863777_1 Ministry of Road Transport and Highways icon image
468. 30-May-2025 05:00 PM 30-Sep-2026 05:30 PM 01-Oct-2026 05:30 PM abilitation Upgradation and Widening of Akola to Mahan section from km 35.265 to km 64.574 (Length 29.309 km) including construction of 4 lane with paved shoulder configuration of Barshi Takli Bypass (Length 3.160 km) on NH161A the State of Maharas/05/EEH/AKL/2025-26, Dt.28.05.2025/2025_MoRTH_862532_1 Ministry of Road Transport and Highways icon image
469. 26-Mar-2025 05:30 PM 28-Sep-2026 05:30 PM 30-Sep-2026 12:30 PM Upgradation of Existing Intermediate Lane Flexible Pavement to 2 Lane with Paved Shoulders Flexible Pavement from Km 0.000 (Orchha) To Km 75.000 (Length 75.000 Km) on Orchha Tikamgarh Shahgarh NH-539 in the State of Madhya Pradesh on EPC Mode/CE-RO/BHP/Tender/03/2024-25/2025_MoRTH_854576_1 Ministry of Road Transport and Highways icon image
470. 29-Oct-2024 04:15 PM 13-Oct-2026 03:00 PM 17-Oct-2026 04:00 PM Widening and strengthening of Daringbadi ghat portion from km 231.000 to 256.000 (Design chainage from km 229.500 to 256.468) of NH-59 under NH(O) in Hybrid Annuity Mode Plan 2023-24 in the State of Odisha (Design length 26.968 Kms)./RO/BBSR/11017/NH(O)/2023-24/2024_MoRTH_833034_1 Ministry of Road Transport and Highways icon image

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।