| 1721. |
03-Mar-2026 03:00 PM |
31-Mar-2026 04:00 PM |
03-Apr-2026 06:00 PM |
Supply, Installation and commissioning of 01 Nos. Stop Log Gate and 02 Nos. Draft Tube Gates as per technical specifications and schedules at 5x23 MW Gandhisagar Hydel Power Station, Gandhisagar District-Mandsaur/SE/GS/TS-11/PW/2025-26/1183/2025_MPPGC_459197_2 |
Madhya Pradesh |
-- |
| 1722. |
16-Mar-2026 06:55 PM |
31-Mar-2026 04:00 PM |
31-Mar-2026 04:01 PM |
OM of CPWS Scheme to kotturu and other other habitations for the year 2026-27(Excluding power charges)/678/2025-26, dt:10.03.2026/915052 |
Andhra Pradesh |
-- |
| 1723. |
03-Mar-2026 03:00 PM |
31-Mar-2026 04:00 PM |
01-Apr-2026 12:00 PM |
Construction of Link Road from Mavoo to Hakku via Gunul Phase-I L-2.50Kms Under NABARD RIDF-XXXI/E-NIT No. 12 of 2025-26 Dated 03.03.2026/2026_PWDJK_305083_1 |
Jammu and Kashmir |
 |
| 1724. |
03-Mar-2026 02:00 PM |
31-Mar-2026 04:00 PM |
01-Apr-2026 12:00 PM |
Construction of Link Road from Dinore Chamote to Dehra Temple via Bhutangal Block Marmat Phase-I Under NABARD RIDF-XXXI/E-NIT No. 11 of 2025-26 Dated 03.03.2026/2026_PWDJK_305066_1 |
Jammu and Kashmir |
 |
| 1725. |
28-Feb-2026 05:00 PM |
31-Mar-2026 04:00 PM |
06-Apr-2026 11:30 AM |
SUPPLY OF 512345 NOS OF THERMAL PAPER ROLL UNDER RATE CONTRACT BASIS FOR ONE YEAR/KSEB/SCM/eP 57XD3/AE5/25-26/THERMAL PAPER ROLL/2026_KSEB_841921_1 |
Kerala |
 |
| 1726. |
17-Mar-2026 12:58 AM |
31-Mar-2026 04:00 PM |
31-Mar-2026 04:01 PM |
PROVIDING OF HIRED VEHICLE/e11/25-26/916168 |
Andhra Pradesh |
-- |
| 1727. |
28-Feb-2026 09:00 AM |
31-Mar-2026 04:00 PM |
31-Mar-2026 04:30 PM |
Gonda Water Supply Reorganisation Scheme/430/W-87/02/2026_UPJNM_1120982_1 |
Uttar Pradesh |
 |
| 1728. |
14-Feb-2026 04:00 PM |
31-Mar-2026 04:00 PM |
02-Apr-2026 02:00 PM |
Rate Contract for Setting and Upgradation of Divisional workshop for ED-Sopore under UT Capex 2025-26 (Part 1 Design, Supply, Installation, Testing and Commissioning of Transformer Heating Ovens.)/EMDS/130/2026_PDD_303191_1 |
Jammu and Kashmir |
 |
| 1729. |
14-Jan-2026 05:00 PM |
31-Mar-2026 04:00 PM |
01-Apr-2026 12:00 PM |
Engagement of Consultant for carrying out the Feasibility Study and Preparation of Bankable Detailed Project Report Imported for proposed Passenger Ropeway at Gulabgarh to Atholi, district Kishtwar, Jammu on PPP mode./E-NIT No.02 of 2026/2026_JKSCC_300583_1 |
Jammu and Kashmir |
 |
| 1730. |
13-Jan-2026 05:00 PM |
31-Mar-2026 04:00 PM |
01-Apr-2026 12:00 PM |
Engagement of Consultant for carrying out the Feasibility Study and Preparation of Bankable Detailed Project Report Imported for proposed Passenger Ropeway at Khadniyar, District Baramulla, Kashmir on PPP mode./E-NIT No. 01 of 2026/2026_JKSCC_300506_1 |
Jammu and Kashmir |
 |