| क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
| 32941. |
02-Apr-2026 05:00 PM |
17-Apr-2026 04:00 PM |
18-Apr-2026 11:00 AM |
Conducting of NDT (Non Destructive Testing) of Ropeway Equipment at various Ropeway Projects of JKCCC for a period of 01 year./E-NIT No.15 of 2026/2026_JKSCC_307214_1 |
Jammu and Kashmir |
-- |
| 32942. |
02-Apr-2026 05:17 PM |
17-Apr-2026 04:00 PM |
17-Apr-2026 04:01 PM |
PROVIDING PRECAST COMPOUND WALL FROM KAPU KALYANA MANDAPAM TO YADAVA KALYANA MANDAPAM AND VARIOUS LOCATIONS BELONGS TO S V S DEVASTHANAM, DWARAKA TIRUMALA/NIT NO.01/2026-27/919530 |
Andhra Pradesh |
-- |
| 32943. |
02-Apr-2026 05:21 PM |
17-Apr-2026 04:00 PM |
17-Apr-2026 04:01 PM |
CONSTRUCTION OF SHOPS (3 NOS) INFRONT OF SIVALAYAM GOPURAM AT UPHILL OF S.V.S.DEVASTHANAM DWARAKA TIRUMALA/NIT NO.01/2026-27/919649 |
Andhra Pradesh |
-- |
| 32944. |
02-Apr-2026 06:00 PM |
17-Apr-2026 04:00 PM |
18-Apr-2026 11:00 AM |
Drainage Scheme gund Karim khan watergam (Balance Portion)/e nit 02 of 2026-27 dated 02/04/2026/2026_PWDJK_307138_1 |
Jammu and Kashmir |
-- |
| 32945. |
02-Apr-2026 07:07 PM |
17-Apr-2026 04:00 PM |
17-Apr-2026 05:00 PM |
Establishment of Automated Testing Station in Cluster-2 consisting of 7 locations at 1) RTO-Ibrahimpatnam, 2) DTO-Khammam, 3) Driving Testing Track-Kondapur, 4) DTC-Mahbubnagar, 5) Driving Track-Nagole, 6) DTC-Nalgonda and 7) Unit Office-Patancheru in Telangana State./10/SE/TS/RB/MBNR/2025-26/ATS, Dt.20.03.2026/689715 |
Telangana |
-- |
| 32946. |
02-Apr-2026 07:09 PM |
17-Apr-2026 04:00 PM |
17-Apr-2026 04:30 PM |
Establishment of Automated Testing Station in Cluster-1 consisting of 8 locations at 1) DTC-Adilabad, 2) DTC-Nizamabad, 3) DTC-Karimnagar, 4) DTC-Hanumakonda, 5) RTO-Medchal, 6) DTC-Sangareddy, 7) RTO-Dundigal-1 and 8) RTO-Dundigal-2 in Telangana State./13//TS/T5/1530/2025-26, Dt: 20.03.2026/690191 |
Telangana |
-- |
| 32947. |
03-Apr-2026 10:00 AM |
17-Apr-2026 04:00 PM |
18-Apr-2026 01:00 PM |
Construction of drainage, interlocking work and construction of toilets under Urai Development Authority./1313/ODA/V/2026-27/2026_ODAUP_1132582_1 |
Uttar Pradesh |
-- |
| 32948. |
03-Apr-2026 03:52 PM |
17-Apr-2026 04:00 PM |
17-Apr-2026 04:01 PM |
M AND R works to KTK 5 and KTK 6 Incline/BHP/CVL/ET-55/2326/25-26/690589 |
Telangana |
-- |
| 32949. |
04-Apr-2026 09:00 AM |
17-Apr-2026 04:00 PM |
18-Apr-2026 11:00 AM |
Design and Construction of 1x17 Mtr Span Steel Plate Girder Double Lane Bridge including construction of road diversion approaches at Tangwani Garoora On Sumbal Bandipora Road on EPC MODE (ENGINEERING PROCUREMENT AND CONSTRUCTION MODE)./Fresh e NIT No.02 of 2026-27 Dated 03-04-2026/2026_PWDJK_307297_1 |
Jammu and Kashmir |
-- |
| 32950. |
04-Apr-2026 01:00 PM |
17-Apr-2026 04:00 PM |
17-Apr-2026 04:01 PM |
Providing Aluminium windows to AR (Admin) and AR (Academics) rooms and other miscellaneous works in CAO building, A.U., VSP. 3rd call/UE/E-PTN(1)/AU/VSP/2026-27/920057 |
Andhra Pradesh |
-- |