क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
3541. |
26-Aug-2025 05:00 PM |
27-Sep-2025 05:00 PM |
29-Sep-2025 11:00 AM |
Purchasing of Basketball Court Equipment,and GI chain mesh, Bluetooth Speaker, Inverter Battery system, CCTV Camera With DVR, Water cooler and filter, Sound system for hall/590/Sports and other/2025/2025_HED_447181_1 |
Madhya Pradesh |
-- |
3542. |
15-Sep-2025 10:00 AM |
27-Sep-2025 05:00 PM |
30-Sep-2025 11:00 AM |
Construction of cover the drain with half round iron angles at ward No 07 Nagrota Bagwan/1277-85 Dated 25/08/2025/2025_UDDHP_113302_1 |
Himachal Pradesh |
-- |
3543. |
25-Aug-2025 06:00 PM |
27-Sep-2025 05:00 PM |
29-Sep-2025 09:00 AM |
Supply, Installation, Erection, Commissioning and Synchronization of minimum 1MW capacity Solar Power Plant including DPR preparation and Construction of new structure/strengthening of existing structure at MCL, Walayar Plant on BOOT basis/MCL/E/RE-PROJ/24-25/2025_MCL_734042_5 |
Kerala |
-- |
3544. |
14-Aug-2025 05:00 PM |
27-Sep-2025 05:00 PM |
29-Sep-2025 03:30 PM |
Procurement of ESP Inner Arm and Outer Arm Spares/064GATP/MMD/BMD/SPARE/20017833/2025_POWER_147479_1 |
Punjab |
 |
3545. |
11-Aug-2025 05:00 PM |
27-Sep-2025 05:00 PM |
03-Oct-2025 12:00 PM |
CONSTRUCTION OF PROPOSED TRAINING LAB BLOCK (FSL and COMPUTER LAB AT RTC 31 PAC IRB I and RTC 46 PAC BATTALIONS Rudrapur US Nagar UTTARAKHAND/698/Nivida/288 Dated 08.08.2025/2025_MDPEY_86039_1 |
Uttarakhand |
 |
3546. |
15-Sep-2025 12:00 PM |
27-Sep-2025 05:00 PM |
29-Sep-2025 11:00 AM |
MGNREGA and other scheme MATERIAL SUPPLY IN GP Mahura PS Kushalgarh FOR THE FINANCIAL YEAR 2025-26/814/2025-26/2025_PRD_500902_42 |
Rajasthan |
 |
3547. |
11-Aug-2025 05:00 PM |
27-Sep-2025 05:00 PM |
03-Oct-2025 12:00 PM |
CONSTRUCTION OF PROPOSED POLICE STATION AT DEGHAT DISTT ALMORA/698/Nivida/288 Dated 08.08.2025/2025_MDPEY_86035_1 |
Uttarakhand |
 |
3548. |
11-Aug-2025 05:00 PM |
27-Sep-2025 05:00 PM |
03-Oct-2025 12:00 PM |
Construction of Proposed Police Station at Piran Kaliyar Haridwar Uttarakhand/698/Nivida/288 Dated 08.08.2025/2025_MDPEY_86043_1 |
Uttarakhand |
 |
3549. |
07-Aug-2025 09:00 AM |
27-Sep-2025 05:00 PM |
03-Oct-2025 12:00 PM |
SITC of Generator Transformer 75 MVA with all accessories, including dismantling of the existing transformer at Chibro Power House/03e/EE(G)/CPH/2025-26/2025_UJVN_85811_1 |
Uttarakhand |
 |
3550. |
22-Jul-2025 05:00 PM |
27-Sep-2025 05:00 PM |
29-Sep-2025 03:00 PM |
Implants Accessories and General Items/1612_17.07.2025/2025_SMSMC_489343_1 |
Rajasthan |
 |