राज्य - 14 दिनों के अंदर बंद होने वाली निविदाएं

कुल निविदाएं : 106764
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
53341. 26-Nov-2025 06:55 PM 26-Dec-2025 03:55 PM 27-Dec-2025 12:00 PM Const. of Drain from H/o- Hiralal Grupta to H/o- Sabita Pore (L-150ft, Depth- 1.5ft, w- 10 inch)at PS 150 under Haripal AshutoshGP within Haripal Development Block/39/APAS/BDO/HPL/2025-26/2025_ZPHD_960365_29 West Bengal --
53342. 26-Nov-2025 06:55 PM 26-Dec-2025 03:55 PM 27-Dec-2025 12:00 PM const. of Drain from H/o- Rasu malik to H/o- Tulsi Bhakat. (L-120ft, Depth 1.5ft, w- 10 inch)at PS 150 under Haripal AshutoshGP within Haripal Development Block/39/APAS/BDO/HPL/2025-26/2025_ZPHD_960365_30 West Bengal --
53343. 26-Nov-2025 06:55 PM 26-Dec-2025 03:55 PM 27-Dec-2025 12:00 PM INSTALLATION OF LED STREET LIGHT(30 PCS )AT EXISTING ELECTRIC POLE at PS 164 under Haripal Ashutosh GP within Haripal Development Block/42/APAS/BDO/HPL/2025-26/2025_ZPHD_960427_3 West Bengal --
53344. 26-Nov-2025 06:55 PM 26-Dec-2025 03:55 PM 27-Dec-2025 12:00 PM Const. of Roof - Shade (ZN-AL) at KALI MANDIR near PATHER PANCHALI of Khamarchandi Paschim and P.C.C-BEDI. (measurement 1-6mtr x 6.7 mitr) at PS 158 under Haripal Ashutosh GP within Haripal Development Block/41/APAS/BDO/HPL/2025-26/2025_ZPHD_960456_2 West Bengal --
53345. 26-Nov-2025 06:55 PM 26-Dec-2025 03:55 PM 27-Dec-2025 12:00 PM INSTALLATION OF MINI HIGH MAST LIGHT AT BELEPARA OF RAGHUBATI at PS 164 under Haripal Ashutosh GP within Haripal Development Block/42/APAS/BDO/HPL/2025-26/2025_ZPHD_960427_4 West Bengal --
53346. 26-Nov-2025 06:55 PM 26-Dec-2025 03:55 PM 27-Dec-2025 12:00 PM CONST. OF BATHING GHAT AT ASWATHHATALA PUKUR AT MOHANBATIat PS 152 under Haripal Ashutosh GP WITHIN Haripal Development Block/40/APAS/BDO/HPL/2025-26/2025_ZPHD_960396_2 West Bengal --
53347. 26-Nov-2025 06:55 PM 26-Dec-2025 03:55 PM 27-Dec-2025 12:00 PM CONST. OF BATHING GHAT AT MALANCHA DHAR PUKUR AT MOHANBATIat PS 152 under Haripal Ashutosh GP WITHIN Haripal Development Block/40/APAS/BDO/HPL/2025-26/2025_ZPHD_960396_3 West Bengal --
53348. 26-Nov-2025 06:55 PM 26-Dec-2025 03:55 PM 27-Dec-2025 12:00 PM CONST. OF CC DRAIN FROM H/O HARADHAN MALIK TO NELA PUKUR VIA NIRMAL MALIK HOUSE AT MOHANBATI. (L 130 FT,W 1FT, DEPTH 1.5 FT )at PS 152 under Haripal Ashutosh GP WITHIN Haripal Development Block/40/APAS/BDO/HPL/2025-26/2025_ZPHD_960396_4 West Bengal --
53349. 26-Nov-2025 06:55 PM 26-Dec-2025 03:55 PM 27-Dec-2025 12:00 PM Electric street light over Existing Lamp post at KhamarchandI paschim (34 nos) at PS 158 under Haripal Ashutosh GP within Haripal Development Block/41/APAS/BDO/HPL/2025-26/2025_ZPHD_960456_3 West Bengal --
53350. 26-Nov-2025 06:55 PM 26-Dec-2025 03:55 PM 27-Dec-2025 12:00 PM REPAIR RENOVATION OF KANCHA ROAD FROM MUCHIPUKUR TO CULTIVATION FIELD OF RANJIT MANNA VIA KANAILAL MAJHI HOUSE,SURYA DAS HOUSE,SURYA MALIK HOUSE AT MOHANBATI.(L 300 FT,W 5 FT, THICKNESS 5 INCH )at PS 152 under Haripal Ashutosh GP WITHIN Haripal De/40/APAS/BDO/HPL/2025-26/2025_ZPHD_960396_5 West Bengal --

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।