| क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
| 57011. |
12-Mar-2026 11:45 AM |
26-Mar-2026 03:00 PM |
27-Mar-2026 03:30 PM |
Dredging the left out areas of the Ooty Lake in the Udhagamandalam Taluk of the Nilgiris District/NIT.NO.13 /2025-26/ BBC/ Erode/Dt.09.03.2026/2026_WRD_673712_1 |
Tamil Nadu |
-- |
| 57012. |
12-Mar-2026 03:00 PM |
26-Mar-2026 03:00 PM |
27-Mar-2026 03:30 PM |
Execution of the Balance Electrification Works of the New Administrative Building, in Continuation of the Electrification Works Previously Executed in Part in the PTU Campus under RUSA Fund/PTU/BD/73/2025-26/2026_DHTE_22044_1 |
Puducherry UT |
-- |
| 57013. |
12-Mar-2026 03:00 PM |
26-Mar-2026 03:00 PM |
26-Mar-2026 04:00 PM |
Hiring of Maruti- Eeco (Year of mfg 1st January, 2022 on wards) (Petrol/ C.N.G run) for the office of the Addl. Chief Engineer, PWD(DWS) Planning and Design Unit, P.N. Complex, Agartala for 02(two) years/11/DNIe-T/EE/RIG/2025-26/2026_CEDWS_71553_1 |
Tripura |
-- |
| 57014. |
12-Mar-2026 06:00 PM |
26-Mar-2026 03:00 PM |
27-Mar-2026 03:00 PM |
Enq.No.111-I 25-26 Supply of LT three phase angle cross arm and LT three phase channel cross arm/Enq.No.111-I 25-26 Supply of LT three phase angle cross arm and LT three phase channel cross arm/2026_EB_673852_1 |
Tamil Nadu |
-- |
| 57015. |
12-Mar-2026 06:00 PM |
26-Mar-2026 03:00 PM |
27-Mar-2026 03:00 PM |
Enq.No.112-I 25-26 Supply of Supply of 3.5 V cross arm/Enq.No.112-I 25-26 Supply of Supply of 3.5 V cross arm/2026_EB_673861_1 |
Tamil Nadu |
-- |
| 57016. |
12-Mar-2026 06:00 PM |
26-Mar-2026 03:00 PM |
27-Mar-2026 03:00 PM |
Removal of damaged aluminium channel with cera boards, Painting, Pipeline repair work in the either side of aavin illam building, Nandanam./2102/Engg.2/2026/2026_TCMPF_674015_1 |
Tamil Nadu |
-- |
| 57017. |
12-Mar-2026 06:30 PM |
26-Mar-2026 03:00 PM |
26-Mar-2026 03:15 PM |
Procurement of Modern Machinery for Desilting and Maintenance of Drains of Irrigation and Flood ControlDepartment in NCT of Delhi/EE/MD-IV/10/2025-26//2026_IFC_288614_1 |
NCT of Delhi |
-- |
| 57018. |
12-Mar-2026 06:30 PM |
26-Mar-2026 03:00 PM |
27-Mar-2026 04:00 PM |
Design, Engineering, Procurement and Execution of Eco-Tourism Infrastructure/191/2026_MPFD_490089_1 |
Madhya Pradesh |
-- |
| 57019. |
13-Mar-2026 09:00 AM |
26-Mar-2026 03:00 PM |
26-Mar-2026 03:10 PM |
Balance work for construction of Drain cum footpath at Silchar Kathal road and construction of hard shoulder from Ch.1500.00m to Ch.2800.00m (Both side) connecting to NH-Bye pass under MMUPPNA under RIDF-XXIX of NABARD for the year 2023-24./T/CC/ETN/SIL/2025-26/1370(T)/2026_PWD_51938_1 |
Assam |
-- |
| 57020. |
13-Mar-2026 12:00 PM |
26-Mar-2026 03:00 PM |
27-Mar-2026 11:00 AM |
Stage contract for urgent nature restoration works under M.H. M and R-2702 for Sub-Division Khansahib for the Year 2026-27./enit.no 36 of 03-2026/2026_IFC_306032_2 |
Jammu and Kashmir |
-- |