क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
80171. |
11-Sep-2025 05:55 PM |
13-Oct-2025 03:30 PM |
16-Oct-2025 03:30 PM |
Biennial Work contract for Assistance in maintenance work of Boiler Non-Pressure Part area of unit 3 and 4 at 2x660 MW, SSTPP, MPPGCL, Dongalia./WT-2764/2025_MPPGC_440986_1 |
Madhya Pradesh |
-- |
80172. |
11-Sep-2025 06:55 PM |
13-Oct-2025 03:30 PM |
16-Oct-2025 03:30 PM |
Work contract for supply and application of PAD Quilt type Ceramic Fibre Pad Blanket Insulation on BHEL make KWU design 600 MW, HP and IP Turbine modules and associated Stop valves and Control valves of Unit-1 at 2x600 MW,SSTPP,MPPGCL, Dongala/WT-2787/2025_MPPGC_446013_1 |
Madhya Pradesh |
-- |
80173. |
12-Sep-2025 01:00 PM |
13-Oct-2025 03:30 PM |
16-Oct-2025 03:30 PM |
Assistance in day to day work of Testing and Communication Division of 2x600MW, of SSTPP, Dongalia/WT-2770/2025_MPPGC_442765_1 |
Madhya Pradesh |
-- |
80174. |
12-Sep-2025 01:00 PM |
13-Oct-2025 03:30 PM |
16-Oct-2025 03:30 PM |
Work contract for In-Situ repairing/cutting and replacement of seat of HP-Bypass valves installed in Unit No. 1 and 2 at 2X600 MW, SSTPP, MPPGCL, Dongalia./WT-2785/MM-I/2025_MPPGC_446011_1 |
Madhya Pradesh |
-- |
80175. |
12-Sep-2025 01:00 PM |
13-Oct-2025 03:30 PM |
16-Oct-2025 03:30 PM |
Biennial Work contract for Round the clock Preventive and Breakdown Maintenance of Coal Mills, Coal Feeders, coal burners and associated systems, other than AOH/COH, in Boiler of unit 3 and 4 at 2x660 MW, SSTPP, MPPGCL, Dongalia./WT-2763/MM-II/2025_MPPGC_440871_1 |
Madhya Pradesh |
-- |
80176. |
12-Sep-2025 03:30 PM |
13-Oct-2025 03:30 PM |
15-Oct-2025 03:30 PM |
KMC/D.G.(P_D)/C/026/2025-26/KMC/D.G.(P_D)/C/026/2025-26/2025_KMC_901857_1 |
West Bengal |
-- |
80177. |
15-Sep-2025 05:30 PM |
13-Oct-2025 03:30 PM |
16-Oct-2025 11:00 AM |
Construction of Community Toilet at Swarupganj Bus Stand at Swarupganj, Mouza-Swarupganj, JL No.-1/e- NIT No 21/e-Chl-I/B/2025-26/2025_ZPHD_902783_1 |
West Bengal |
 |
80178. |
15-Sep-2025 05:30 PM |
13-Oct-2025 03:30 PM |
16-Oct-2025 11:00 AM |
Construction of Drain with Hume Pipe with 5 Channel at Sekh para near Njim House at Swarupganj, Mouza-Swarupganj, JL No.-1/e- NIT No 21/e-Chl-I/B/2025-26/2025_ZPHD_902783_2 |
West Bengal |
 |
80179. |
15-Sep-2025 05:30 PM |
13-Oct-2025 03:30 PM |
16-Oct-2025 11:00 AM |
Construction of Drain with Hume Pipe with 5 Channel near Manu house to Umesh Saha house via Chanchal Ghosh house at Swarupganj, Mouza-Swarupganj, JL No.-1/e- NIT No 21/e-Chl-I/B/2025-26/2025_ZPHD_902783_3 |
West Bengal |
 |
80180. |
16-Sep-2025 03:00 PM |
13-Oct-2025 03:30 PM |
15-Oct-2025 04:00 PM |
WBPWD/RDS/NIT-11 (Sl. No.02)/25-26/EE/MHD/WBPWD/RDS/NIT-11 (Sl. No. 1 to 3)/25-26/EE/MHD/2025_WBPWD_903546_2 |
West Bengal |
 |