क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
86261. |
03-Oct-2025 06:00 PM |
24-Oct-2025 03:00 PM |
27-Oct-2025 03:00 PM |
Supply and Installation of Epoxy Based ESD Flooring/KMRL/MDS/PROC OandM/2025-26/18/2025_KMRL_804805_1 |
Kerala |
-- |
86262. |
03-Oct-2025 06:00 PM |
24-Oct-2025 03:00 PM |
27-Oct-2025 03:00 PM |
Construction of Compound Wall, Electromechanical Work and allied works at Mouje Kaldongari, Tal. Nagpur Gramin, Dist. Nagpur, Talegaon Dabhade, Tal. Maval, Dist. Pune and Bapgaon, Tal. Bhiwandi, Dist. Thane/e-Tender/MSAMB/ENGG/09/2025-26/2025_AMBPN_1224852_1 |
Maharashtra |
-- |
86263. |
03-Oct-2025 06:55 PM |
24-Oct-2025 03:00 PM |
24-Oct-2025 05:00 PM |
Supply of Medicines and consumable/NIT Ref. No 2025-26/2302/2025_MEDIC_505250_1 |
Rajasthan |
-- |
86264. |
03-Oct-2025 06:55 PM |
24-Oct-2025 03:00 PM |
24-Oct-2025 03:30 PM |
Strengthening of various Bituminous roads under West Road Division-1, PWD, New Delhi during 2025-26 (SH1 Strengthening of Sant Bairwa Marg with Titarpur Drain) (SH 2 Strengthening of Devki Nandan Marg) (SH 3 Strengthening of AD-1 to BF-31 Tagore Gdn/06/CE/North/PWD/2025-26 (33/EE/PWD-WD/2025-26)/2025_PWD_279227_1 |
NCT of Delhi |
-- |
86265. |
04-Oct-2025 01:00 PM |
24-Oct-2025 03:00 PM |
24-Oct-2025 04:00 PM |
Rate including GST per monkey is to be paid for catching terrorist/mischievous and biting monkeys (as per the guidelines given by the Animal Board from time to time) at various places in the areas of Wards 01 to 80 of Bareilly Municipal Corporation a/161/HD/UNSA/25-26 Sr No 01 Date-30.09.2025/2025_DOLBU_1079872_1 |
Uttar Pradesh |
-- |
86266. |
04-Oct-2025 03:00 PM |
24-Oct-2025 03:00 PM |
24-Oct-2025 03:30 PM |
Preparation of Design Drawing DPR including architectural structural electrical sanitary interior Design with a long term master plan of Purnagiri Temple Reetha Meetha Temple Guru GorakhnathTemple ManeshwarTemple underManaskhand Mandir Mala Mission/2908/5AC date 20-09-2025/2025_pwd_87844_1 |
Uttarakhand |
-- |
86267. |
04-Oct-2025 03:00 PM |
24-Oct-2025 03:00 PM |
24-Oct-2025 05:00 PM |
The work for Attending 33 KV/11KV/LT underground cable/Outdoor/indoor cable faults in the area of UEDD-VIII, Varanasi under EE, UEDD-VIII, Varanasi/14/UEDC-II(V)/2025-26/2025_PVVNV_1079898_1 |
Uttar Pradesh |
-- |
86268. |
04-Oct-2025 03:00 PM |
24-Oct-2025 03:00 PM |
30-Oct-2025 11:00 AM |
Interior furnishing and re electrification of Transmission Circle Alappuzha/TRC-ALP-05-25-26/2025_KSEB_803158_1 |
Kerala |
 |
86269. |
04-Oct-2025 04:00 PM |
24-Oct-2025 03:00 PM |
27-Oct-2025 02:00 PM |
Supply of Dialysis Consumables/P2/1360046/2025/GMCE/2025_DME_804885_1 |
Kerala |
-- |
86270. |
04-Oct-2025 05:00 PM |
24-Oct-2025 03:00 PM |
25-Oct-2025 03:00 PM |
Stabilisation of 33kv SICOP line from GSS Wanpoh to SICOP Receiving Station/STB/37 of 2025-26 Dt. 04.10.2025/2025_PDD_290688_1 |
Jammu and Kashmir |
-- |