| क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
| 391. |
21-Jan-2026 05:00 PM |
27-Apr-2026 10:00 AM |
29-Apr-2026 10:00 AM |
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles, Distribution T Fs, Augmentation Sagging of ACSR of HT LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T Well C/Dy.CE/DS Circle Mohali/2026/01/2026_POWER_157995_1 |
Punjab |
 |
| 392. |
20-Jan-2026 04:00 PM |
27-Apr-2026 10:00 AM |
29-Apr-2026 10:00 AM |
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun/DyCE/DS Circle, Mohali/2026/09/2026_POWER_158003_1 |
Punjab |
 |
| 393. |
19-Jan-2026 06:00 PM |
27-Apr-2026 10:00 AM |
29-Apr-2026 10:00 AM |
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun/DyCE/DS Circle, Mohali/2026/06/2026_POWER_157997_1 |
Punjab |
 |
| 394. |
19-Feb-2026 06:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 12:30 PM |
Estimate for Remodelling Reconstruction of Sheron Disty with RCC open barrel from RD 34010 to 35500/20/2025-2026 dated 19.02.2026/2026_WR_161360_6 |
Punjab |
 |
| 395. |
02-Sep-2025 05:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 12:30 PM |
Estimate for Remodeling Reconstruction of bahadarpur minor RD 0 to 2000 and construction of escape structure at RD 42500 of longowal disty/08/2025-2026 dated 02.09.2025/2025_WR_148823_1 |
Punjab |
 |
| 396. |
02-Sep-2025 03:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 12:30 PM |
Estimate for Construction of New Ponds to augment Ground Water table by using Canal Water under Sangrur Canal and Ground Water Division at Ladda/05/2025-2026 dated 02.09.2025/2025_WR_147309_2 |
Punjab |
 |
| 397. |
09-Jun-2025 06:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 01:00 PM |
Estimate for the lining of Watercourses of outlet RD 62655R of Sehna Disty/03/2025-26/2025_WR_142201_3 |
Punjab |
 |
| 398. |
21-Feb-2026 11:00 AM |
27-Apr-2026 10:00 AM |
27-Apr-2026 12:00 PM |
Estimate for laying underground pipeline for outlet at rd-21450/R of Bhadaurke Disty/028/FazilkaCanal/2025-26 dated 20/02/2026/2026_WR_161504_27 |
Punjab |
 |
| 399. |
09-Jun-2025 06:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 01:00 PM |
Estimate for the lining of Watercourses/Laying of pipeline of outlet RD 15180R of Sehna Disty/04/2025-26/2025_WR_142211_1 |
Punjab |
 |
| 400. |
09-Jun-2025 06:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 01:00 PM |
Estimate for the lining of Watercourses of outlet RD 68873R of Sehna Disty/03/2025-26/2025_WR_142201_5 |
Punjab |
 |