| क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
| 421. |
21-Jan-2026 05:00 PM |
27-Apr-2026 10:00 AM |
29-Apr-2026 10:00 AM |
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles, Distribution T Fs, Augmentation Sagging of ACSR of HT LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T Well C/Dy.CE/DS Circle Mohali/2026/01/2026_POWER_157995_1 |
Punjab |
 |
| 422. |
16-Mar-2026 02:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 02:00 PM |
Brick Lining of Watercourse of Outlet RD 70500 L OF KALANAUR DISTY DISTRICT GURDASPUR/NIT26/2026/2026_WR_159711_2 |
Punjab |
 |
| 423. |
20-Jan-2026 04:00 PM |
27-Apr-2026 10:00 AM |
29-Apr-2026 10:00 AM |
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun/DyCE/DS Circle, Mohali/2026/09/2026_POWER_158003_1 |
Punjab |
 |
| 424. |
19-Jan-2026 06:00 PM |
27-Apr-2026 10:00 AM |
29-Apr-2026 10:00 AM |
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun/DyCE/DS Circle, Mohali/2026/06/2026_POWER_157997_1 |
Punjab |
 |
| 425. |
02-Sep-2025 05:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 12:30 PM |
Estimate for Remodeling Reconstruction of bahadarpur minor RD 0 to 2000 and construction of escape structure at RD 42500 of longowal disty/08/2025-2026 dated 02.09.2025/2025_WR_148823_1 |
Punjab |
 |
| 426. |
20-Mar-2026 10:00 AM |
27-Apr-2026 10:00 AM |
28-Apr-2026 03:00 PM |
ETC of Boiler Tube Leakage Detection System at Unit-2/20262606B866 5559 45EF 9C87 FA11E6CCF619712PGC/2026_HBC_509737_1 |
Haryana |
 |
| 427. |
02-Sep-2025 03:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 12:30 PM |
Estimate for Construction of New Ponds to augment Ground Water table by using Canal Water under Sangrur Canal and Ground Water Division at Ladda/05/2025-2026 dated 02.09.2025/2025_WR_147309_2 |
Punjab |
 |
| 428. |
09-Jun-2025 06:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 01:00 PM |
Estimate for the lining of Watercourses of outlet RD 62655R of Sehna Disty/03/2025-26/2025_WR_142201_3 |
Punjab |
 |
| 429. |
09-Jun-2025 06:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 01:00 PM |
Estimate for the lining of Watercourses/Laying of pipeline of outlet RD 15180R of Sehna Disty/04/2025-26/2025_WR_142211_1 |
Punjab |
 |
| 430. |
09-Jun-2025 06:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 01:00 PM |
Estimate for the lining of Watercourses of outlet RD 68873R of Sehna Disty/03/2025-26/2025_WR_142201_5 |
Punjab |
 |