| क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
| 451. |
21-Jan-2026 05:00 PM |
27-Apr-2026 10:00 AM |
29-Apr-2026 10:00 AM |
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles, Distribution T Fs, Augmentation Sagging of ACSR of HT LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T Well C/Dy.CE/DS Circle Mohali/2026/01/2026_POWER_157995_1 |
Punjab |
 |
| 452. |
20-Jan-2026 04:00 PM |
27-Apr-2026 10:00 AM |
29-Apr-2026 10:00 AM |
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun/DyCE/DS Circle, Mohali/2026/09/2026_POWER_158003_1 |
Punjab |
 |
| 453. |
19-Jan-2026 06:00 PM |
27-Apr-2026 10:00 AM |
29-Apr-2026 10:00 AM |
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun/DyCE/DS Circle, Mohali/2026/06/2026_POWER_157997_1 |
Punjab |
 |
| 454. |
02-Apr-2026 09:00 AM |
27-Apr-2026 10:00 AM |
28-Apr-2026 01:00 PM |
Construction of Flood Mitigation Structure Over the left edge of RiverSutlej at Village Bandala Block Ferozepur Distt. Ferozepur./TN1349/2026_WR_165115_2 |
Punjab |
 |
| 455. |
02-Sep-2025 05:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 12:30 PM |
Estimate for Remodeling Reconstruction of bahadarpur minor RD 0 to 2000 and construction of escape structure at RD 42500 of longowal disty/08/2025-2026 dated 02.09.2025/2025_WR_148823_1 |
Punjab |
 |
| 456. |
02-Sep-2025 03:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 12:30 PM |
Estimate for Construction of New Ponds to augment Ground Water table by using Canal Water under Sangrur Canal and Ground Water Division at Ladda/05/2025-2026 dated 02.09.2025/2025_WR_147309_2 |
Punjab |
 |
| 457. |
09-Jun-2025 06:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 01:00 PM |
Estimate for the lining of Watercourses of outlet RD 62655R of Sehna Disty/03/2025-26/2025_WR_142201_3 |
Punjab |
 |
| 458. |
02-Apr-2026 09:00 AM |
27-Apr-2026 10:00 AM |
28-Apr-2026 01:00 PM |
Installation of Gates and Gearing System at RD 4000 of Makhu Drain Outfall at RD 8213 of Flood protection Bundh 0-110920 to Prevent Back flow of River water/TN1348/2026_WR_165114_10 |
Punjab |
 |
| 459. |
09-Jun-2025 06:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 01:00 PM |
Estimate for the lining of Watercourses/Laying of pipeline of outlet RD 15180R of Sehna Disty/04/2025-26/2025_WR_142211_1 |
Punjab |
 |
| 460. |
09-Jun-2025 06:00 PM |
27-Apr-2026 10:00 AM |
27-Apr-2026 01:00 PM |
Estimate for the lining of Watercourses of outlet RD 68873R of Sehna Disty/03/2025-26/2025_WR_142201_5 |
Punjab |
 |