| क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
| 47321. |
16-Jan-2026 04:00 PM |
27-Jan-2026 05:00 PM |
28-Jan-2026 11:00 AM |
Redevelopment of Adarsh Nagar, Faridabad with Defect liability period of two years and including maintenance for 5 years under Smart City Mission. Recall/2026BA50225D 861D 4FE2 B93A 6CA06E6CBD8D284ULB/2026_HRY_497360_1 |
Haryana |
-- |
| 47322. |
16-Jan-2026 04:00 PM |
27-Jan-2026 05:00 PM |
28-Jan-2026 11:00 AM |
Construction of road by RMC from E-45 Nehru ground to E-34 Nehru ground ward no 13 , Faridabad/2026BDE84DCA 9F55 41F3 930B CBFA4C699876284ULB/2026_HRY_497364_1 |
Haryana |
-- |
| 47323. |
16-Jan-2026 04:00 PM |
27-Jan-2026 05:00 PM |
28-Jan-2026 11:00 AM |
Providing and Laying 36 Inch dia RCC Storm Water Drain from Neelam chowk to AC Nagar Nallah near Neelam flyover in Ward No.12, Faridabad. Recall/2026BEC93172 A8CD 466A B9C4 FF64E430EE79284ULB/2026_HRY_497367_1 |
Haryana |
-- |
| 47324. |
16-Jan-2026 04:00 PM |
27-Jan-2026 05:00 PM |
28-Jan-2026 11:00 AM |
supply installation of bullet bollard at rose garden park ward no. 13 Badkhal Faridabad/2026EDDFA8A9 F89C 4EAB 95B5 3B7D1A384035284ULB/2026_HRY_497371_1 |
Haryana |
-- |
| 47325. |
16-Jan-2026 04:00 PM |
27-Jan-2026 05:00 PM |
28-Jan-2026 11:00 AM |
Construction of B/Wall for taking possession of MCF Land Plot No.4792 and 4793, 4810, 4811 in Achievers Colony in Ward No.19 (New), Faridabad (Achievers Builders Pvt. Ltd. Vs. MCF, CS No.2781 of 2025).(Recall)/202623210E91 E6F0 433B 9D59 7D5401AA6B3A284ULB/2026_HRY_497374_1 |
Haryana |
-- |
| 47326. |
16-Jan-2026 04:00 PM |
27-Jan-2026 05:00 PM |
28-Jan-2026 11:00 AM |
Rough Cost Estimate for laying water supply line in village Ankhir, Ward no. 18, Badkhal, Faridabad-Recall/20262F7C59F9 E555 474E 8828 AA7048689B16284ULB/2026_HRY_497384_1 |
Haryana |
-- |
| 47327. |
16-Jan-2026 04:00 PM |
27-Jan-2026 05:00 PM |
28-Jan-2026 11:00 AM |
Widening of intersection points by constructing RMC M-25 Slip roads Near Sochalaya, Nehru Ground Entry Point and Bikaner Misthan Bhandar at B.k. to Hardware Road in Ward No.13, Faridabad. Recall/20267FDED2E0 5B17 450E A4C4 5D2EEFE70AB4284ULB/2026_HRY_497386_1 |
Haryana |
-- |
| 47328. |
16-Jan-2026 04:00 PM |
27-Jan-2026 05:00 PM |
28-Jan-2026 11:00 AM |
Provision of new LED lights with poles from NHPC underpass to Mall road T point ward no. 21 Badkhal Constituency./20265D163A3E F2A6 471A 82CD A381184A5CB8284ULB/2026_HRY_497390_1 |
Haryana |
-- |
| 47329. |
16-Jan-2026 04:00 PM |
27-Jan-2026 05:00 PM |
28-Jan-2026 11:00 AM |
Rough Cost Estimate for Construction of Citizen Facilitation Center at Sector-48 (Boosting) in Ward No.17, Faridabad. Recall/2026F3F489FB 120A 43E9 9E68 518162301F4F284ULB/2026_HRY_497391_1 |
Haryana |
-- |
| 47330. |
16-Jan-2026 04:00 PM |
27-Jan-2026 05:00 PM |
28-Jan-2026 11:00 AM |
Rough Cosr Estimate for repairing of central verge and road from Dabua mandi Gate No.1 to Mullah Hotel, Ward No.11 and 15, Faridabad. Recall/2026A42613D3 C152 4326 AFAC A5E11BAF7814284ULB/2026_HRY_497397_1 |
Haryana |
-- |