क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
47811. |
06-Sep-2025 03:00 PM |
13-Sep-2025 06:55 PM |
15-Sep-2025 11:00 AM |
Estimate for upgradation and construction of inner protection wall along with provision of store pitching and benches at site Sihi Pond.Recall/2025493CB03E 1FFE 4712 BA50 7B1488302817284ULB/2025_HRY_470527_1 |
Haryana |
-- |
47812. |
06-Sep-2025 03:00 PM |
13-Sep-2025 06:55 PM |
15-Sep-2025 11:00 AM |
Estimate for repairing boundary wall of park in East India Colony in Ward No. 04, Ballabgarh. Recall/2025E83D1C3C A195 41B0 993A 88281D990441284ULB/2025_HRY_470532_1 |
Haryana |
-- |
47813. |
06-Sep-2025 03:00 PM |
13-Sep-2025 06:55 PM |
15-Sep-2025 11:00 AM |
PROVISION OF 3 NOS MINI TUBEWELL IN BHRAMAN WADA CHAUPAL, BANIYA WADA SAWARIYA BAAG AND ARYA NAGAR HANUMAN MANDIR IN WARD NO. 42, BALLABGARH. Recall/2025E47E5B34 C923 42AC A1F4 33821B9D4DCA284ULB/2025_HRY_470537_1 |
Haryana |
-- |
47814. |
06-Sep-2025 03:00 PM |
13-Sep-2025 06:55 PM |
15-Sep-2025 11:00 AM |
Repairing of Toilet block at Hajri Shed near Woman ITI MBS Unchagaon, Ward No. 39, Ballabgarh. Recall/20251A02E213 85FE 4AED 95D6 8C49289388CE284ULB/2025_HRY_470539_1 |
Haryana |
-- |
47815. |
06-Sep-2025 03:00 PM |
13-Sep-2025 06:55 PM |
15-Sep-2025 11:00 AM |
Estimate for Providing and laying RMC M-25 Grade in 10 nos streets of Lamba Mohalla in Mujessar Village, Ward No. 02, Ballabagrh. Recall/20253D745EFD 0AED 4735 9160 074B4047BDCC284ULB/2025_HRY_470535_1 |
Haryana |
-- |
47816. |
06-Sep-2025 03:00 PM |
13-Sep-2025 06:55 PM |
15-Sep-2025 11:00 AM |
Estimate for providing and fixing of SRFC manhole cover frames in the area of Ward No. 03, Ballabgarh. Recall/202511F8E961 A550 4FD7 87AB 1CCFAFA6AFA2284ULB/2025_HRY_470538_1 |
Haryana |
-- |
47817. |
06-Sep-2025 03:00 PM |
13-Sep-2025 06:55 PM |
15-Sep-2025 11:00 AM |
Construction of Toilet block at Hajri Shed Hardware Chowk and Village-Mujessar, Ward No. 02, Ballabgarh. Recall/202551BB7C74 6538 4DC7 A8B6 9A9208747C50284ULB/2025_HRY_470540_1 |
Haryana |
-- |
47818. |
06-Sep-2025 03:00 PM |
13-Sep-2025 06:55 PM |
15-Sep-2025 11:00 AM |
Development and renovation of greenbelt (park) sector-3 near bijliboard office in front of tirkha colony, ward no. 40, ballabgarh.Recall/2025AEC00559 6B48 4BD3 97E8 3E628E295754284ULB/2025_HRY_470542_1 |
Haryana |
-- |
47819. |
06-Sep-2025 03:00 PM |
13-Sep-2025 06:55 PM |
15-Sep-2025 11:00 AM |
Installation of tubewell by reverse rotory method at tubewell no 4 near milk plant road boosting in ward no. 42, Ballabgarh. Recall/202549A00D65 BC8B 430A A7F7 CB9ACBFA42E7284ULB/2025_HRY_470549_1 |
Haryana |
-- |
47820. |
06-Sep-2025 03:00 PM |
13-Sep-2025 06:55 PM |
15-Sep-2025 11:00 AM |
Provision of 3 nos mini tubewell in ( 1 nos opposite Saran Police Station an 2 nos in Auto Pin Jhuggi) in Ward No. 03, Ballabgarh. Recall/202566CD282B 047F 4B71 8D14 4107B57D4175284ULB/2025_HRY_470550_1 |
Haryana |
-- |