क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
50231. |
09-Sep-2025 06:00 PM |
18-Sep-2025 06:55 PM |
19-Sep-2025 11:00 AM |
Estimate for P/L RMC M-25 grade in Gali no. 8 , Gali no. 10, Gali no. 12, Gali no. 13, Gali no. 15 , Gali no. 12A and 12B Jawahar colony-2, Khand-B in ward no. 08 (old ward no. 06) NIT Faridabad./2025DA174567 B551 47A7 B471 07C0C5936933284ULB/2025_HRY_471234_1 |
Haryana |
-- |
50232. |
09-Sep-2025 06:00 PM |
18-Sep-2025 06:55 PM |
19-Sep-2025 11:00 AM |
Estimate for Construction of unreinforced plain cement concrete pavement in M-25 mix design with Raising of drain Type Ist at B-Block, Opp. Silai Center Pocket, Dabua Colony in ward No.10, NIT Faridabad./2025FC6CD5F5 413D 4E6A 857D C2BECFE4DF71284ULB/2025_HRY_471235_1 |
Haryana |
-- |
50233. |
09-Sep-2025 06:00 PM |
18-Sep-2025 06:55 PM |
19-Sep-2025 06:00 PM |
Rough cost Estimate for Providing and Laying 1200mm dia RCC Pipe line NP-3 from starting Point upto existing RCC new Nallha for Gounchhi Disposal along with additional RCC slab on existing Nallah in ward No. 05, NIT Faridabad./20258A4DE588 7A80 4102 9A9A 15CCB97AEA13284ULB/2025_HRY_471236_1 |
Haryana |
-- |
50234. |
09-Sep-2025 06:00 PM |
18-Sep-2025 06:55 PM |
19-Sep-2025 11:00 AM |
Estimate for Construction of unreinforced plain cement concrete pavement in M-25 mix design with Raising of drain Type Ist and PL 100mm dia PVC Pipe water supply line at Gali No.1 to 9 , Old Post office road, C-Block, Opp. Brijwasi Sweets , Dabua Col/202506ACA29A C2BE 41CD BA70 B07BBF20E148284ULB/2025_HRY_471238_1 |
Haryana |
-- |
50235. |
09-Sep-2025 06:00 PM |
18-Sep-2025 06:55 PM |
19-Sep-2025 11:00 AM |
Estimate for Construction of Shed at Sector 25 II Booting ward office in ward no. 01 NIT Faridabad./202521C0073B FEF3 442C 9F42 09A5A65F89E1284ULB/2025_HRY_471239_1 |
Haryana |
-- |
50236. |
09-Sep-2025 06:00 PM |
18-Sep-2025 06:55 PM |
19-Sep-2025 10:00 AM |
Construction of R/wall Nr. H/o Khurshid Beneh Mohalla Cheeralla Pyt. Mandhar Block NSSB Under DDC Grant Year 2025-26/e-NIT 83 of REW Poonch 2025-26 Date 09-09-2025/2025_RDPR_287505_4 |
Jammu and Kashmir |
 |
50237. |
10-Sep-2025 05:00 PM |
18-Sep-2025 06:55 PM |
22-Sep-2025 11:00 AM |
Installation of Submerssible Pump with Tank and Pipe Line near Poultry Farm at Amit Das of Mouza Shalbandh, JL No-273, Plot No-444. at Shalbandh/002/JGP/APAS/2025-2026, Date-10/09/2025/2025_ZPHD_900227_1 |
West Bengal |
-- |
50238. |
10-Sep-2025 05:00 PM |
18-Sep-2025 06:55 PM |
22-Sep-2025 11:00 AM |
Construction of Cultural Stage near Shalbandh Kali Mandir at Mouza-Shalbandh, JL No-273, Plot No-250. at Shalbandh/002/JGP/APAS/2025-2026, Date-10/09/2025/2025_ZPHD_900227_2 |
West Bengal |
-- |
50239. |
10-Sep-2025 05:00 PM |
18-Sep-2025 06:55 PM |
22-Sep-2025 11:00 AM |
Installation of Solar Street Light nera Kali Mandir, Nera Madhur More, near Shib Mandir at Mouza Shalbandh of JL No-273, Plot No-250. at Shalbandh/002/JGP/APAS/2025-2026, Date-10/09/2025/2025_ZPHD_900227_3 |
West Bengal |
-- |
50240. |
10-Sep-2025 05:00 PM |
18-Sep-2025 06:55 PM |
22-Sep-2025 11:00 AM |
Construction of Cultural Stage near Shiv Temple at Mouza-Shalbandh, JL No-273, Plot No-161. at Shalbandh/002/JGP/APAS/2025-2026, Date-10/09/2025/2025_ZPHD_900227_4 |
West Bengal |
-- |