क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
52101. |
16-Sep-2025 05:00 PM |
23-Sep-2025 06:55 PM |
25-Sep-2025 06:55 PM |
IMPLEMENTATION OF 2 NOS SCHEMES (INSTALLATION OF SOLAR LIGHT SHYAMNAGAR VILLAGE (5 NOS) CHANGDOBA(3 NOS) SCHEME ID 7/0006, 7/0007) WITHIN SHYAMNAGAR GP/14/E/APAS/2025-26/2025_ZPHD_903866_2 |
West Bengal |
-- |
52102. |
16-Sep-2025 05:00 PM |
23-Sep-2025 06:55 PM |
24-Sep-2025 11:00 AM |
Provision of 4 nos mini tubewells in Trikha Colony Mandi, Kundan Colony, Ahir Wara Khai and Raghuvir Colony Gali No. 8 in Ward No. 43, Ballabgarh./20258193F106 56B5 4701 BB7D 7D6E06067CAF284ULB/2025_HRY_472773_1 |
Haryana |
-- |
52103. |
16-Sep-2025 05:00 PM |
23-Sep-2025 06:55 PM |
24-Sep-2025 11:00 AM |
Estimate for Providing and Laying RMC M-25 grade in near hotel howdy wali gali in D1 sanjay colony in Ward No.04, Ballabgarh./20253C5F419D 66E4 4513 95DF A8264AFBA543284ULB/2025_HRY_472736_1 |
Haryana |
-- |
52104. |
16-Sep-2025 05:00 PM |
23-Sep-2025 06:55 PM |
24-Sep-2025 11:00 AM |
Provision of 4 nos mini tubewell in Bhudutt Colony Gali No. 2 and Gali No. 5 and Bhatia Colony B-Block and Block-C (gali no.3) in Ward No. 43, Ballabgarh./20252DD0A41B E9FD 4636 A448 D2C30F204726284ULB/2025_HRY_472794_1 |
Haryana |
-- |
52105. |
16-Sep-2025 05:00 PM |
23-Sep-2025 06:55 PM |
24-Sep-2025 11:00 AM |
Desilting of disposal tank at anaj mandi disposal in ward no. 46 , ballabhgarh/2025931224A5 99E8 4C43 87BF 223C55ADD800284ULB/2025_HRY_472797_1 |
Haryana |
-- |
52106. |
16-Sep-2025 05:00 PM |
23-Sep-2025 06:55 PM |
24-Sep-2025 11:00 AM |
Rough cost estimate for providing and laying of 450mm dia. RCC NP-3 sewer line in Sector-3 from matka chowk to main market road in Ward No. 40, Ballabhgarh./2025CD631C53 2469 4975 A6B0 242134913BA2284ULB/2025_HRY_472799_1 |
Haryana |
-- |
52107. |
16-Sep-2025 05:00 PM |
23-Sep-2025 06:55 PM |
24-Sep-2025 11:00 AM |
Rough cost estimate for providing and laying of 450mm Dia. RCC NP-3 sewer line in sector-3 from Sainath chowk to main market road ward no. 40, Ballabgarh./202535FFF629 9DCC 4018 854E C3C064FCD203284ULB/2025_HRY_472802_1 |
Haryana |
-- |
52108. |
16-Sep-2025 05:00 PM |
23-Sep-2025 06:55 PM |
24-Sep-2025 10:00 AM |
CONSTRUCTION OF BOUNDRY WALL LENGTH 185X2 MTR. FOR NEW SUGAR GODOWN/1501/CIVIL/GM/2025-26/2025_KSMSK_1074456_1 |
Uttar Pradesh |
-- |
52109. |
16-Sep-2025 05:05 PM |
23-Sep-2025 06:55 PM |
24-Sep-2025 11:00 AM |
Upgradation of sewer line 450mm dia. RCC pipe class NP3 Sewer line in Gas godam road to Rathour Chowk Unchagaon road, Ward No. 45, Ballabgarh./202531DE72E9 99B9 4CD5 AE5F 7D84231146A6284ULB/2025_HRY_472805_1 |
Haryana |
-- |
52110. |
16-Sep-2025 05:10 PM |
23-Sep-2025 06:55 PM |
24-Sep-2025 11:00 AM |
Collection (including bottle), transportation, testing and submission of report of water samples of tubewell various places in Ward No. 41, Ballabgarh Division./20254D8F3EFE 1BFE 4EBF 9E9C 83DB662AB3DC284ULB/2025_HRY_472807_1 |
Haryana |
-- |