राज्य - निविदा बंद होने की तिथि के अनुसार

रिपोर्ट तिथि : 02-Oct-2025

कुल निविदाएं : 1293
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
211. 23-Sep-2025 06:00 PM 02-Oct-2025 02:00 PM 03-Oct-2025 03:00 PM Estimate for Additional 63 kva DTR installation for Salbardi wala Location ID 2948930119 at village Salbardi under Bisnoor DC in OM Dn Multai/DGM/STC/BTL/3654 DT.23.09.25/2025_MKVVC_453790_1 Madhya Pradesh --
212. 23-Sep-2025 06:00 PM 02-Oct-2025 02:00 PM 03-Oct-2025 03:00 PM Estimate for Additional 63 kva DTR installation for Basti Purana Jamgaon wala, Location ID 2948850044 at village Jamgaon under Masod D/C in O and M Dn Multai/DGM/STC/BTL/3651 DT.23.09.2025/2025_MKVVC_453791_1 Madhya Pradesh --
213. 18-Sep-2025 06:00 PM 02-Oct-2025 02:00 PM 03-Oct-2025 02:30 PM NCTPS I Operation Circle CA Dn DM Plant Dismantling Fabrication and Erection of Service water fill line 300 NB Pipe and Bend from Overhead Tank pipe rack area/CE/NCTPS-I/SE/OPN/55/2025-26/2025_EB_605521_1 Tamil Nadu --
214. 25-Sep-2025 09:00 AM 02-Oct-2025 02:00 PM 04-Oct-2025 11:00 AM Annual Plan-EDAYUR GRAMA PANCHAYATH 2025-26 PRO.NO 187/26 -RENOVATION OF MOONNAKKAL ANGANWADI ROAD PINDATHODE VELLACHAL SECOND PHASE/69/AE/LSGD//EDR/ETN/02/25-26/2025_LSGD_801886_1 Kerala
215. 18-Sep-2025 09:00 AM 02-Oct-2025 02:00 PM 03-Oct-2025 02:00 PM MATERIAL SUPPLY FOR WARD 11 TO 15/DSM/MGNREGS/3/2025/2025_DP_798657_1 Kerala --
216. 17-Sep-2025 06:00 PM 02-Oct-2025 02:00 PM 03-Oct-2025 02:30 PM THE VARIOUS DCW WORKS AND IMPROVEMENT WORKS IN O AND M PERAMBALUR DIVISION/MM-E-08/2025-26, Dt.15.09.2025/2025_EB_605190_1 Tamil Nadu --
217. 17-Sep-2025 06:00 PM 02-Oct-2025 02:00 PM 03-Oct-2025 02:30 PM THE VARIOUS CAPITAL WORKS IN O AND M PERAMBALUR DIVISION/MM-E-07/2025-26, Dt.15.09.2025/2025_EB_605264_1 Tamil Nadu --
218. 17-Sep-2025 06:00 PM 02-Oct-2025 02:00 PM 03-Oct-2025 02:30 PM MM-E-06/2025-26, Dt.15.09.2025./MM-E-06/2025-26, Dt.15.09.2025/2025_EB_604764_1 Tamil Nadu --
219. 17-Sep-2025 06:00 PM 02-Oct-2025 02:00 PM 03-Oct-2025 02:30 PM SUPPLY OF TRANSFORMER STRUCTURE MATERIALS DOUBLE POLE/E-19/25-26, Dt.15.09.2025/2025_EB_604854_1 Tamil Nadu --
220. 17-Sep-2025 06:00 PM 02-Oct-2025 02:00 PM 03-Oct-2025 02:30 PM SUPPLY OF LT GI PIN/E-18/25-26, Dt.15.09.2025/2025_EB_604747_1 Tamil Nadu --

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।