राज्य - निविदा बंद होने की तिथि के अनुसार

रिपोर्ट तिथि : 28-Jan-2026

कुल निविदाएं : 2761
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
1191. 05-Jan-2026 09:00 AM 28-Jan-2026 03:00 PM 28-Jan-2026 04:00 PM Construction of RCC drain and CC road in the link lane from Ward No. 07, Karbala Lane No. 07./12/PWD/2025-26/2026_DOLBU_1103806_7 Uttar Pradesh --
1192. 05-Jan-2026 09:00 AM 28-Jan-2026 03:00 PM 28-Jan-2026 04:00 PM Drainage repair and road improvement work using concrete in Ward No. 14, Dak Bungalow Valmiki Basti, from Suresh to Rajendra and from Valmiki Dharamshala via Intezar Bhai to Haji Islam./12/PWD/2025-26/2026_DOLBU_1103806_20 Uttar Pradesh --
1193. 05-Jan-2026 09:00 AM 28-Jan-2026 03:00 PM 28-Jan-2026 04:00 PM In Ward No. 15, Kabir Nagar, road improvement and drain repair bed raising work will be carried out using concrete from Dinesh Rathore house to Ravindra house, from Somesh Goswami to Sanjeev Shankhwar, and from Satish Chandra to Manik Chandra house./12/PWD/2025-26/2026_DOLBU_1103806_21 Uttar Pradesh --
1194. 05-Jan-2026 09:00 AM 28-Jan-2026 03:00 PM 28-Jan-2026 04:00 PM Drain repair and road improvement work using concrete in Ward No. 16, Durga Nagar area, from Asha Clinic to the temple./12/PWD/2025-26/2026_DOLBU_1103806_22 Uttar Pradesh --
1195. 05-Jan-2026 09:00 AM 28-Jan-2026 03:00 PM 28-Jan-2026 04:00 PM In Ward No. 17, Satya Nagar, road improvement, drain repair, and bed raising work will be carried out using concrete from Rohtas to Ravi, Upadhyay to Karan, and up to Ashok Siddharth Hospital./12/PWD/2025-26/2026_DOLBU_1103806_23 Uttar Pradesh --
1196. 05-Jan-2026 09:00 AM 28-Jan-2026 03:00 PM 28-Jan-2026 04:00 PM Drainage repair and road improvement work using concrete will be carried out in Ward No. 18, from Vinod shop at Lavkush Nagar Tiraaha to Krishna Devi house, from Gopal and Deepak place to Chandravati Marriage Hall, and in the connecting lanes./12/PWD/2025-26/2026_DOLBU_1103806_24 Uttar Pradesh --
1197. 05-Jan-2026 09:00 AM 28-Jan-2026 03:00 PM 28-Jan-2026 04:00 PM Construction of drains and road improvement work using concrete in the street near the theatre, from the public toilet to the government tube well, and in the connecting lanes./12/PWD/2025-26/2026_DOLBU_1103806_25 Uttar Pradesh --
1198. 05-Jan-2026 09:00 AM 28-Jan-2026 03:00 PM 28-Jan-2026 04:00 PM Construction of a boundary wall at Ambedkar Park under Ward No. 18, Mau Basath./12/PWD/2025-26/2026_DOLBU_1103806_26 Uttar Pradesh --
1199. 05-Jan-2026 09:00 AM 28-Jan-2026 03:00 PM 28-Jan-2026 04:00 PM Construction of an RCC drain and CC road from Rakesh Savita house to Ramavatar Rajput house in Ward No. 19, Kanhaiya Nagar, Shiv Nagar./12/PWD/2025-26/2026_DOLBU_1103806_27 Uttar Pradesh --
1200. 05-Jan-2026 09:00 AM 28-Jan-2026 03:00 PM 28-Jan-2026 04:00 PM Construction of RCC drain and CC road in Ward No. 19, Sant Nagar, from Manoj Yadav residence to Chandrapal residence, and from Gupta ji residence to Pawan residence./12/PWD/2025-26/2026_DOLBU_1103806_28 Uttar Pradesh --

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।