राज्य - निविदा बंद होने की तिथि के अनुसार

रिपोर्ट तिथि : 26-Mar-2026

कुल निविदाएं : 2587
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
1791. 16-Mar-2026 04:00 PM 26-Mar-2026 05:00 PM 27-Mar-2026 01:00 PM 2- Construction of an RCC slab over the drain near Solani Enclave in Ward No. 3, up to Tasty Heaven Restaurant, and construction of chambers every 20 feet./964/NNR/2025-26/2026_MCNNR_93143_2 Uttarakhand --
1792. 16-Mar-2026 04:00 PM 26-Mar-2026 05:00 PM 27-Mar-2026 01:00 PM 1-Filling work up to a height of two feet on government land along the drain near Solani Enclave in Ward No. 03, wall construction in some places, and reconstruction of the drain culvert near Tasty Heaven Restaurant using RCC after demolishing the e/964/NNR/2025-26/2026_MCNNR_93143_1 Uttarakhand --
1793. 16-Mar-2026 04:00 PM 26-Mar-2026 05:00 PM 27-Mar-2026 01:00 PM In Ward No. 10, Chaudhary Charan Singh Colony, the road will be constructed using interlocking tiles from Sohanbir house to Neeraj Saygi house./964/NNR/2025-26/2026_MCNNR_93127_7 Uttarakhand --
1794. 16-Mar-2026 03:00 PM 26-Mar-2026 05:00 PM 27-Mar-2026 01:00 PM 36- In Ward No. 7, the footpath will be lowered from Vishal Auto to Deepak Gupta house, and slabs will be placed on the drain./964/NNR/2025-26/2026_MCNNR_93127_6 Uttarakhand --
1795. 13-Mar-2026 01:00 PM 26-Mar-2026 05:00 PM 27-Mar-2026 02:00 PM Construction work of synthetic running track in the sports stadium of District Bulandshahr/308/ 7-5(4)/E-TENDER/Sports Stadium / Bulandshahr /2025-26 Dated 13.03.2026/2026_SCIDC_1120779_1 Uttar Pradesh --
1796. 16-Mar-2026 04:00 PM 26-Mar-2026 05:00 PM 27-Mar-2026 01:00 PM 34- In Ward No. 4, the damaged drain will be reconstructed and slabbed from behind MLA Mr. Pradeep Batra office to the residence of former Minister Mr. Kunwar Pranav Singh Champion./964/NNR/2025-26/2026_MCNNR_93127_5 Uttarakhand --
1797. 21-Mar-2026 10:00 AM 26-Mar-2026 05:00 PM 27-Mar-2026 11:00 AM Construction of R.C.C. V.R.B. at Km. 1.870 of Sonhar Drain/Letter no.378/DCL/eTender/Dt.26.02.26/2026_UPIDC_1128608_1 Uttar Pradesh --
1798. 16-Mar-2026 04:00 PM 26-Mar-2026 05:00 PM 27-Mar-2026 01:00 PM 32 In Ward No. 6, interlocking tiles and beautification work on the sidewalk of the road leading from IIT Vikas Nagar Block No. 140/2 to IIT Gate No. 5 near Olive Hotel./964/NNR/2025-26/2026_MCNNR_93127_4 Uttarakhand --
1799. 16-Mar-2026 04:00 PM 26-Mar-2026 05:00 PM 27-Mar-2026 01:00 PM 29- In Ward No. 38, Shyam Nagar, RCC drain construction work from Rakesh Kumar house and pond towards Gopal Garden./964/NNR/2025-26/2026_MCNNR_93127_3 Uttarakhand --
1800. 16-Mar-2026 04:00 PM 26-Mar-2026 05:00 PM 27-Mar-2026 01:00 PM 28- In Ward No. 24, Salempur Industrial Area, road construction from Atul Saini factory to the Environmental Testing Lab using colored interlocking tiles./964/NNR/2025-26/2026_MCNNR_93127_2 Uttarakhand --

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।