राज्य - निविदा बंद होने की तिथि के अनुसार

रिपोर्ट तिथि : 02-Apr-2026

कुल निविदाएं : 2989
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
381. 26-Mar-2026 05:36 PM 02-Apr-2026 11:45 AM 02-Apr-2026 11:50 AM MGF or 15th FC Untied/NIT No.E1/10/13/2025-26, Date: 16.03.2026 of Commissioner, Adilabad Municipality(2nd call)/689092 Telangana --
382. 26-Mar-2026 11:18 AM 02-Apr-2026 11:45 AM 02-Apr-2026 11:46 AM Replacement of damaged MS chequerred plates with new MS chequerred plates on candy secondary setting tank and on raw water channel besides chemical building under Asifnagar filter beds section,SD-II, TD-I,Himayathsagar/EP.No.177/CGM(E)/TC/T3/TDIII/2025-26 dt:26.03.2026/688947 Telangana --
383. 12-Mar-2026 09:00 AM 02-Apr-2026 12:00 PM 02-Apr-2026 02:00 PM SINGLE STAGE DOOR STEP DELIVERY HANDLING AND TRANSPORT WORK (YEAR 2026-27 AND 2027-28) AT BLOCK/CENTER/CLUSTER KORAON IN DISTRICT PRAYAGRAJ./3285/Single Stage/11.03.2026/2026_DOFCS_1124040_3 Uttar Pradesh --
384. 12-Mar-2026 09:00 AM 02-Apr-2026 12:00 PM 02-Apr-2026 02:00 PM SINGLE STAGE DOOR STEP DELIVERY HANDLING AND TRANSPORT WORK (YEAR 2026-27 AND 2027-28) AT BLOCK/CENTER/CLUSTER GAURA IN DISTRIC PRATAPGARH./3285/Single Stage/11.03.2026/2026_DOFCS_1124040_49 Uttar Pradesh --
385. 28-Mar-2026 09:00 AM 02-Apr-2026 12:00 PM 02-Apr-2026 12:30 PM Construction work of 3x12 meter span minor bridge, approach roads, protective works, and additional approach roads on the Nakatiya River at Km 2 of the Richhaula Chaudhary to Bara-Baror road in Antga village, Nawabganj block in Distt. Bareilly 25-26/39/413C(E-Tender)-3/2025-26 Dated 02.01.2026/2026_CEBLY_1131054_1 Uttar Pradesh --
386. 27-Mar-2026 06:00 PM 02-Apr-2026 12:00 PM 02-Apr-2026 02:00 PM Carriage and replacement of damaged Low/Medium Power TF of different capacity of EUDSD Ist under EUDD, Etah/29/2025-26/EDC ETAH/2026_DVVNL_1130915_1 Uttar Pradesh --
387. 12-Mar-2026 09:00 AM 02-Apr-2026 12:00 PM 02-Apr-2026 02:00 PM SINGLE STAGE DOOR STEP DELIVERY HANDLING AND TRANSPORT WORK (YEAR 2026-27 AND 2027-28) AT BLOCK/CENTER/CLUSTER PRATAPGARH SADAR IN DISTRIC PRATAPGARH./3285/Single Stage/11.03.2026/2026_DOFCS_1124040_56 Uttar Pradesh --
388. 12-Mar-2026 09:00 AM 02-Apr-2026 12:00 PM 02-Apr-2026 02:00 PM SINGLE STAGE DOOR STEP DELIVERY HANDLING AND TRANSPORT WORK (YEAR 2026-27 AND 2027-28) AT BLOCK/CENTER/CLUSTER MANJHANPUR IN KAUSHAMBI./3285/Single Stage/11.03.2026/2026_DOFCS_1124040_22 Uttar Pradesh --
389. 12-Mar-2026 09:00 AM 02-Apr-2026 12:00 PM 02-Apr-2026 02:00 PM SINGLE STAGE DOOR STEP DELIVERY HANDLING AND TRANSPORT WORK (YEAR 2026-27 AND 2027-28) AT BLOCK/CENTER/CLUSTER BABAGANJ IN DISTRICT PRATAPGARH./3285/Single Stage/11.03.2026/2026_DOFCS_1124040_47 Uttar Pradesh --
390. 14-Mar-2026 06:50 PM 02-Apr-2026 12:00 PM 02-Apr-2026 01:00 PM Range Bhinder Construction work of pipeline at Forest B lock Flat-A work/E-164/2025-26/2026_FORES_546279_2 Rajasthan --

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।