राज्य - निविदा बंद होने की तिथि के अनुसार

रिपोर्ट तिथि : 02-Apr-2026

कुल निविदाएं : 2980
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
621. 31-Mar-2026 12:00 PM 02-Apr-2026 12:00 PM 02-Apr-2026 12:30 PM Construction of a minor bridge comprising a 5x5x5 meter span RCC box culvert along with approach roads and additional approach roads over the Ghabhadiya Nala drain situated between the Sultanpur Kudwar Haliyapur Fatehpur road Major District Road/1226/1com-Sul.A.Cir./2025-26 Date 23.03.2026/2026_CEUFZ_1131954_2 Uttar Pradesh --
622. 01-Apr-2026 09:00 AM 02-Apr-2026 12:00 PM 02-Apr-2026 12:30 PM Construction of a 3x3x3 meter RCC box culvert to replace the existing damaged minor bridge over the Redahwa Nala (drain) at Km 3 of the Tihsa connecting road in Sultanpur District/1226/1com-Sul.A.Cir./2025-26 Date 23.03.2026/2026_CEUFZ_1131954_3 Uttar Pradesh --
623. 31-Mar-2026 09:00 AM 02-Apr-2026 12:00 PM 02-Apr-2026 12:30 PM Renwal work Sarai Subhaga Link Road/1271/2A/2025-26 Date-22.03.2026/2026_CEUFZ_1131920_30 Uttar Pradesh --
624. 31-Mar-2026 09:00 AM 02-Apr-2026 12:00 PM 02-Apr-2026 12:30 PM Renwal work on the Khalispur Gopalpur Tahirpur Link Road./1271/2A/2025-26 Date-22.03.2026/2026_CEUFZ_1131920_31 Uttar Pradesh --
625. 31-Mar-2026 10:00 AM 02-Apr-2026 12:00 PM 02-Apr-2026 02:00 PM KMC/LTG/Z-IV/BR-X/528/25-26/KMC/LTG/Z-IV/BR-X/528/25-26/2026_KMC_1023480_1 West Bengal --
626. 31-Mar-2026 09:00 AM 02-Apr-2026 12:00 PM 02-Apr-2026 12:30 PM Renwal work Sasna (from H.B. Route Km 85) Link Road/1271/2A/2025-26 Date-22.03.2026/2026_CEUFZ_1131920_21 Uttar Pradesh --
627. 17-Mar-2026 10:00 AM 02-Apr-2026 12:00 PM 02-Apr-2026 03:00 PM Renewal work By P.C. on the Kafalpani Hundkhal Motor Road (from Km 1.00 to 2.00) (length 1.61 km) in Pratapnagar Constituency Thouldhar Block Annual Maintenance year 2026-27./373/2AC Dated 07-03-2026/2026_pwd_93247_1 Uttarakhand --
628. 31-Mar-2026 09:00 AM 02-Apr-2026 12:00 PM 02-Apr-2026 12:30 PM Renwal work Rohiyawan-Jalalpur Pich Road beyond the 1.00 km Link Road/1271/2A/2025-26 Date-22.03.2026/2026_CEUFZ_1131920_22 Uttar Pradesh --
629. 16-Mar-2026 05:50 PM 02-Apr-2026 12:00 PM 02-Apr-2026 03:00 PM Under A.R. 2026-27 renewal by SDBC on the Silkyara Bangaon Chapra Sarot Motor Road (SH. 72) at Km 95 and 98 (Length 0.81 km) in Thauldhar Block under Dhanolti Constituency./373/2AC Dated 07-03-2026/2026_pwd_93227_1 Uttarakhand --
630. 17-Mar-2026 10:00 AM 02-Apr-2026 12:00 PM 02-Apr-2026 03:00 PM Renewal work by PC (Cold Mix) in Km 1.00 3.00 (length 3.21 km) of Late Shri Satya Singh Pundir Motor Road (Syunta Narangi Basal Motor Road) in Block Chamba under Tehri Constituency Under annual maintenance year 2026-27/373/2AC Dated 07-03-2026/2026_pwd_93246_1 Uttarakhand --

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।