राज्य - निविदा बंद होने की तिथि के अनुसार

रिपोर्ट तिथि : 14-Apr-2026

कुल निविदाएं : 998
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
111. 07-Apr-2026 04:00 PM 14-Apr-2026 12:00 PM 15-Apr-2026 12:00 PM Supply of Various Types Materials/ZPBHAN/PSTU/GPCHAN/E1/2026-27/2026_BHAND_1293202_1 Maharashtra --
112. 07-Apr-2026 02:00 PM 14-Apr-2026 12:00 PM 14-Apr-2026 12:30 PM Construction work of 32 capacity hostel barrack and interrogation room for 04 capacity at Thana Paschim Sharira of Kaushambi District/1049/06COM.B.PRA.CIRCLE/2026 DT. 10-02-2026/2026_CEALD_1125551_13 Uttar Pradesh --
113. 08-Apr-2026 09:00 AM 14-Apr-2026 12:00 PM 14-Apr-2026 02:00 PM 2nd time Felling, Conversion of trees and transportation with stacking in depots at Rewari for the year 2026-27./GM/HFDC/RWR/11/2026-27/2026_HBC_513510_1 Haryana --
114. 13-Mar-2026 01:00 PM 14-Apr-2026 12:00 PM 14-Apr-2026 01:00 PM SINGLE STAGE HANDLING AND TRANSPORT WORK IN HAMIRPUR DISTRICT BLOCK CENTRE MAODAHA/SINGLE STAGE HANDLING AND TRANSPORT WORK IN HAMIRPUR DISTRICT BLOCK CENTRE MAODAHA/2026_DOFCS_1124907_1 Uttar Pradesh
115. 08-Apr-2026 09:00 AM 14-Apr-2026 12:00 PM 14-Apr-2026 02:00 PM 2nd Felling, Conversion of trees and transportation with stacking in depots M. Garh/GM/HFDC/RWR/10/2026-27/2026_HBC_513509_1 Haryana --
116. 08-Apr-2026 09:00 AM 14-Apr-2026 12:00 PM 16-Apr-2026 01:00 PM Erection of temporary structure, pandel and other allied works for reserve PP Tagging counter, Micro Observer shed, Fire and media counter at DC and CC venue at Saltora Netaji Centenary College campus in connection with forthcoming General Election t/01/E/Sal/WBLAE/2026-27, dt.07/04/2026/2026_ZPHD_1023558_2 West Bengal --
117. 08-Apr-2026 09:00 AM 14-Apr-2026 12:00 PM 16-Apr-2026 01:00 PM Erection of temporary structure, pandel and other allied works for DC and CC counter at DC and CC venue at Saltora Netaji Centenary College campus in connection with forthcoming General Election to WBLA-2026 under Saltora Development Block during the/01/E/Sal/WBLAE/2026-27, dt.07/04/2026/2026_ZPHD_1023558_5 West Bengal --
118. 13-Mar-2026 02:00 PM 14-Apr-2026 12:00 PM 14-Apr-2026 01:00 PM SINGLE STAGE HANDLING AND TRANSPORT WORK IN BANDA DISTRICT BLOCK CENTRE TINDWARI/SINGLE STAGE HANDLING AND TRANSPORT WORK IN BANDA DISTRICT BLOCK CENTRE TINDWARI/2026_DOFCS_1124949_1 Uttar Pradesh
119. 07-Apr-2026 09:00 AM 14-Apr-2026 12:00 PM 14-Apr-2026 02:00 PM Construction of Toe wall, providing and fixing of weld mesh galvanized powder coated 1220 ( 4 ft height) of size 2500mmx1220, at Green Belt in front of Sector- 2 Panchkula along National Highway (NH-5)/2026F6DB41A4 DA77 4CCD B74F 2744F4F6090E2239003/2026_HRY_513199_1 Haryana --
120. 08-Apr-2026 09:00 AM 14-Apr-2026 12:00 PM 16-Apr-2026 01:00 PM Walling with clean GCI sheets and supplying of wooden table, chair, sofa, carpet, bed roll with toshak, pillow and bed sheet etc. at DC and CC venue at Saltora Netaji Centenary College campus in connection with forthcoming General Election to WBLA-20/01/E/Sal/WBLAE/2026-27, dt.07/04/2026/2026_ZPHD_1023558_3 West Bengal --

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।