| क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
| 771. |
09-Apr-2026 02:00 PM |
22-Apr-2026 05:00 PM |
23-Apr-2026 11:00 AM |
Strengthening of Road (P/L DGBM and BC on internal roads in Sector-81) Noida/38/GM/SM/WC-7/ET/2025-26/2026_NOIDA_1134882_1 |
Uttar Pradesh |
-- |
| 772. |
07-Apr-2026 09:00 AM |
22-Apr-2026 05:00 PM |
23-Apr-2026 03:00 PM |
Reconstruction/Construction of Head Regulator of Jhajjar Sub Branch and Dulhera Distributary and Escape at RD 156014 of JLN Feeder./2026753CDAF1 D3A5 4A24 88D3 39CD4732CE54160IRR/2026_HRY_513193_1 |
Haryana |
-- |
| 773. |
06-Apr-2026 05:00 PM |
22-Apr-2026 05:00 PM |
24-Apr-2026 12:30 PM |
Design, Drawing, Const., Testing and Comm. of Sewerage System, 240 KLD Sewage Treatment Plant (STP) and 60 KLD Effluent Treatment Plant (ETP) for District Head Quarter Hospital in Khordha including Operation and Maint. for a period of Five Years/WATCO (W)-30(07)/2025-26 Dtd.23.03.2026/2026_WATCO_127789_1 |
Odisha |
-- |
| 774. |
09-Apr-2026 02:00 PM |
22-Apr-2026 05:00 PM |
23-Apr-2026 11:00 AM |
Strengthening of Road (P/L DGBM and BC on 60M wide road (Service road) from DSC Road to Eveready crossing Phase-II) Noida/39/GM/SM/WC-7/ET/2025-26/2026_NOIDA_1134890_1 |
Uttar Pradesh |
-- |
| 775. |
06-Apr-2026 05:00 PM |
22-Apr-2026 05:00 PM |
24-Apr-2026 12:30 PM |
Design, Drawing, Const.Testing and Comm.of Sewerage System, 330 KLD Sewage Treatment Plant (STP) and 85 KLD Effluent Treatment Plant (ETP) for District Head Quarter Hospital in Sambalpur including Operation and Maint. for a period of Five Years/WATCO (W)-30(05)/2025-26 Dtd.23.03.2026/2026_WATCO_127786_1 |
Odisha |
-- |
| 776. |
06-Apr-2026 05:00 PM |
22-Apr-2026 05:00 PM |
24-Apr-2026 12:30 PM |
Design, Drawing, Const.Testing and Comm.of Sewerage System, 390 KLD Sewage Treatment Plant (STP) and 95 KLD Effluent Treatment Plant (ETP) for District Head Quarter Hospital in Baripada including Operation and Maint.for a period of Five Years/WATCO (W)-30(06)/2025-26 Dtd.23.03.2026/2026_WATCO_127788_1 |
Odisha |
-- |
| 777. |
09-Apr-2026 11:30 AM |
22-Apr-2026 05:00 PM |
24-Apr-2026 11:00 AM |
Construction of Pcc road from House of Bigan Oraon to Anaganwadi via House of Munarik Vishvakarma at Nawatoli, GP- Rankikala, Block- Manika District- Latehar/ZP/LATEHAR/24/2025-26/ Gr_01 (2nd call)/2026_ZPLAT_112626_1 |
Jharkhand |
-- |
| 778. |
09-Apr-2026 02:00 PM |
22-Apr-2026 05:00 PM |
23-Apr-2026 11:00 AM |
M/o Road (Repair of Peripheral Service Road, RCC Drain and Footpath Infosys IT Campus at A-01 to A-06 in Sector-85) Noida/40/GM/SM/WC-7/ET/2025-26/2026_NOIDA_1134900_1 |
Uttar Pradesh |
-- |
| 779. |
09-Apr-2026 12:00 PM |
22-Apr-2026 05:00 PM |
23-Apr-2026 11:00 AM |
Procurement and laying of 200mm dia D.I. K-9 / M.S. pipe for CWRM and RWRM pipe line and 100mm dia D.I. K-7 / M.S. pipe for distribution pipe line of Khandapada NAC for widening and strengthening of Khandapada-Fategarh PWD road from 0/00 to 18/030 Km/SEPHBBSR-01/2026-27 DTD.04.04.2026/2026_PHEO_127864_1 |
Odisha |
-- |
| 780. |
06-Apr-2026 05:00 PM |
22-Apr-2026 05:00 PM |
24-Apr-2026 12:30 PM |
Design, Drawing, Const. Testing and Comm. of S/S, 160 KLD Sewage Treatment Plant (STP) and 40 KLD Effluent Treatment Plant (ETP) for District Head Quarter Hospital (City Hospital) in Cuttack including Operation and Maint. for a period of Five Years/WATCO (W)-30(03)/2025-26 Dtd.23.03.2026/2026_WATCO_127782_1 |
Odisha |
-- |