केंद्रीय - 14 दिनों के अंदर बंद होने वाली निविदाएं

कुल निविदाएं : 20788
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
13401. 22-Aug-2025 06:00 PM 22-Sep-2025 11:00 AM 23-Sep-2025 11:00 AM Restoration Preservation and Maintenance of GPO Heritage Building Phase 3 General Post Office Chhatrapati Shivaji Terminus Area Fort Mumbai 400 001/MR/Bldg/NIT/Mumbai GPO/PHASE-III/2025-26/2025_DOP_874290_1 Department of Posts
13402. 06-Sep-2025 02:54 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM Injection Methylcobalamine 1000 mcg+ Pyr [Injection Methylcobalamine 1000 mcg+ Pyridoxine 100 mg + Nicotinamide 100mg/2ml Amp.]/92255707A/106819680 Ministry of Railways --
13403. 21-Aug-2025 06:10 PM 22-Sep-2025 11:00 AM 22-Sep-2025 11:30 AM 765 kV Transformer Package 7TR-15BULK/CC/NT/W-TR/DOM/A00/25/10100/26248 Power Grid Corporation of India Limited
13404. 08-Sep-2025 05:00 PM 22-Sep-2025 11:00 AM 23-Sep-2025 11:00 AM Erection of 440 V OH line with 09 nos. of pole and 09 span conductor for providing power to new weighbridge at 15 no. Godhar under NGK colliery of Kusunda Area/BCCL/AVI/EnM/2025-26/85/2025_BCCL_343523_1 Bharat Coking Coal Limited --
13405. 04-Sep-2025 09:32 AM 22-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM Drop Melting Point apparatus/61256480/106817159 Ministry of Railways --
13406. 22-Aug-2025 12:00 PM 22-Sep-2025 11:00 AM 23-Sep-2025 11:30 AM On-line pH, Conductivity and Dual Input Contacting Conductivity Analyzers/BPSCL/MM/25-26/PUR-098/LTE-037/2025_BPSCL_245761_1 Bokaro Power Supply Company (P) Limited
13407. 08-Sep-2025 05:00 PM 22-Sep-2025 11:00 AM 23-Sep-2025 11:00 AM Fabrication of couplings 06 nos. for use in pump motor set at ADIC under Kusunda Area/BCCL/AVI/EnM/2025-26/83/2025_BCCL_343513_1 Bharat Coking Coal Limited --
13408. 08-Sep-2025 05:00 PM 22-Sep-2025 11:00 AM 23-Sep-2025 11:00 AM 10 inch pipe short piece 10 nos. bend 12 nos. and 6 inch pipe 10 nos. short piece and 12 bend for pump shifting work from South side sump to north gallery 3 seam, J patch under ADIC/BCCL/AVI/EnM/2025-26/84/2025_BCCL_343519_1 Bharat Coking Coal Limited --
13409. 11-Aug-2025 06:30 PM 22-Sep-2025 11:00 AM 23-Sep-2025 11:30 AM Supervision Consultant Services during O and M period for 4-6 of Yamunanagar- Saha-Barwala-Panchkula section of NH-73 (New NH-07) from km. 160.357 to km. 179.248 (Design km. 157.192 to km. 176.400) in the State of Haryana./NHAI/RO-CHD/2025-2026/CHD/21/2025_NHAI_244824_1 National Highways Authority of India
13410. 10-Sep-2025 11:00 AM 22-Sep-2025 11:00 AM 23-Sep-2025 11:00 AM Repair and Retrofitting of RCC structures at NSTPS year 2025/NTPC/USSC-CPG2/9900310110/2025_NTPC_100101_1 NTPC Limited --

ध्यान दें : For more details and clarifications, please refer to the respective Portal.