19912. |
11-Aug-2025 05:30 PM |
11-Sep-2025 03:00 PM |
12-Sep-2025 03:00 PM |
Route Alignment, Detailed Survey, Check Survey, Design (as applicable), Engineering, Manufacturing, Assembly, Inspection, Civil Foundation work, Erection, Testing and Commissioning of 132 kV, Two Phase Transmission Line/IRCON/ELECT/5035/RE NFR PKG 6/OT/3/2025_IRCON_244758_1 |
IRCON International Limited |
 |