2716. |
22-Aug-2025 10:00 AM |
13-Sep-2025 05:00 PM |
15-Sep-2025 10:00 AM |
Dismantling, transportation and Installation of (1000mm size) tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates and belt structure, belt conveyor from old district/surface to New depillaring panel no. 27D/AGM/HSD/GM(O)/e-Tend/25-26/17 dtd 22.08.2025/2025_SECL_341953_1 |
South Eastern Coalfields Limited |
-- |