केंद्रीय - 7 दिनों के अंदर बंद होने वाली निविदाएं

कुल निविदाएं : 13114
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
11441. 30-Jul-2025 06:00 PM 16-Dec-2025 11:00 AM 17-Dec-2025 11:30 AM Independent Engineer Services for Construction of 4 lane Greenfield Section of NH- 33 from Mokama (Design Ch. 0.000) to Munger (Design Ch. 82.400) in the State of Bihar on Hybrid Annuity Mode./BRDIV-20021 /13/2025-Bihar Division/2025_NHAI_243269_1 National Highways Authority of India icon image
11442. 24-Jul-2025 12:00 PM 16-Dec-2025 11:00 AM 17-Dec-2025 11:30 AM Construction of 4 lane Greenfield Section of NH-33 from Mokama (Design Ch. 0.000) to Munger (Design Ch. 82.400) in the State of Bihar on Hybrid Annuity Mode/PROJ/34/2025 Bihar Division/2025_NHAI_242359_1 National Highways Authority of India icon image
11443. 01-Oct-2025 05:30 PM 16-Dec-2025 11:00 AM 17-Dec-2025 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Armoor (design km. 29.100) to Jagtial (design km. 92.700) (total length 63.300 km) on Hybrid Annuity Mode (HAM)/NHAI/Tech /TS/2024/239275/2025_NHAI_251026_1 National Highways Authority of India icon image
11444. 03-Dec-2025 05:20 PM 16-Dec-2025 11:00 AM 16-Dec-2025 11:05 AM VITAMIN - B1-10MG, B6-3MG AND B12-15MCG TAB/BPE2500362/2025_BHEL_55543_1 Bharat Heavy Electricals Limited --
11445. 04-Oct-2025 12:11 PM 16-Dec-2025 11:00 AM 16-Dec-2025 11:00 AM CR-ANGLE COCK PART NO.40101341 SUB K-679.507, MAKE-CRCC./77256322/106846551 Ministry of Railways --
11446. 03-Dec-2025 05:10 PM 16-Dec-2025 11:00 AM 17-Dec-2025 11:00 AM Repairing and overhauling of 400 amp, 11KV OCB Biecco Lawri make controlling 11kv power supply to 4 MVA Transformer 11kv/3.3kv at ENA OCP/BCCL/AVI/EnM/2025-26/172/2025_BCCL_348696_1 Bharat Coking Coal Limited --
11447. 03-Dec-2025 06:00 PM 16-Dec-2025 11:00 AM 16-Dec-2025 11:05 AM POLY GLYCOLIC ACID 6MM 3 / 8 SPATULA 10CM 10 - 0/BPE2400524/2025_BHEL_55545_1 Bharat Heavy Electricals Limited --
11448. 01-Oct-2025 06:00 PM 16-Dec-2025 11:00 AM 17-Dec-2025 11:30 AM 4-Laning of Jagtial Karimnagar Section of NH-563 from Design Ch.0.000 km (Existing chainage 90/500 on NH-63) to Design Ch. 58.866 km (near SH1 Ch. 170.400 km) at Karimnagar Bypass End (Design Length 58.866 km) on BOT (Toll) mode./NHAI/Tech /TS/2024/239275/2025_NHAI_251035_1 National Highways Authority of India icon image
11449. 08-Dec-2025 11:47 AM 16-Dec-2025 11:00 AM 16-Dec-2025 11:00 AM POH-1 Kit of FIBA, MAKE- REPL, Kit No. RE-1338010./52256836/106907315 Ministry of Railways --
11450. 17-Nov-2025 05:54 PM 16-Dec-2025 11:00 AM 16-Dec-2025 11:00 AM Brake equalizing lever without steel bush to DRG. No. WA/BG-6344./62255701/106887849 Ministry of Railways --

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।