केंद्रीय - 7 दिनों के अंदर बंद होने वाली निविदाएं

कुल निविदाएं : 14242
क्र.सं. ई-प्रकाशन तिथि बोली जमा करने की अंतिम तिथि निविदा खुलने की तिथि शीर्षक/संदर्भ संख्या/निविदा आईडी राज्य का नाम शुद्धिपत्र
3721. 30-Oct-2025 06:00 PM 15-Dec-2025 03:00 PM 16-Dec-2025 03:00 PM Identification of vendors specializing in AI/ML model-based solutions for strategic industry partnership with IOCL to develop Large Language Model/RDCCEOI14939/2025_RND_187364_1 IndianOil icon image
3722. 21-Nov-2025 03:01 PM 15-Dec-2025 03:00 PM 15-Dec-2025 03:00 PM Through Fitting renewal (103.463 Km) of the existing 52kg/60kg PSC sleepers at KM 0.00 to 21.36 (UP), KM 0.00 to 16.20 (DN), SCPD-PTKC, 0.00 to 0.269 (SL), KM 0.00 to 1.779 (DN) JRC-SCPD, KM 0.00 to 13.563 IIIrd Line SNL-LDH, 0.00 to 13.486 on PGW-NSS-JJJ section, 0.00 to 7.15 NSS-RHU, 0.00 to 1.185 NMDA-SNL, 0.00 to 0.800 LDH-DUI, 0.00 to 0.495 JRC-HSX & 5.752 KM on UP line & 21.424 KM on DN line at various lications on SNL-JUC section. i.c.w TFR 106.507 TKM (60kg) and 11.581 TKM (52/185-2025-26-SrDEN-I-FZR/85289956 Ministry of Railways --
3723. 13-Nov-2025 05:00 PM 15-Dec-2025 03:00 PM 16-Dec-2025 03:30 PM NFVP/CICO/2376/NFVP/CICO/2376/2025_NFL_255306_1 National Fertilizers Limited icon image
3724. 04-Dec-2025 01:48 PM 15-Dec-2025 03:00 PM 15-Dec-2025 03:00 PM Battery operated Chamfering Kit suitable to chamfer hole of dia 26.5 mm to 32 mm & as per RDSO Specification No.TM/SM/336 (Rev 01 of 2023)./81256556/106904022 Ministry of Railways --
3725. 21-Nov-2025 12:00 PM 15-Dec-2025 03:00 PM 15-Dec-2025 03:00 PM Installation of track mounted automatic Gauge Face Lubricators on curves - 203 Nos over Bikaner division under control of ADEN/Ratangarh./221-25-26/85658504 Ministry of Railways --
3726. 08-Dec-2025 02:54 PM 15-Dec-2025 03:00 PM 15-Dec-2025 03:00 PM 10367 - INJ METHYLPREDNISOLONE 1000 MG/H3251390/106907582 Ministry of Railways --
3727. 21-Nov-2025 11:00 AM 15-Dec-2025 03:00 PM 15-Dec-2025 03:00 PM Proposed Construction of 2 lane ROB at Km:33/700-800 in lieu of LC No.22 between Chitradurga-Balenahalli stations of JRU-RDG section - Mysuru Division/SWR-RSP-LC-22-ROB-02/85228587 Ministry of Railways --
3728. 21-Nov-2025 01:06 PM 15-Dec-2025 03:00 PM 15-Dec-2025 03:00 PM TRD pending works of NMDC Nagarnar steel plant , including NSL SSP/WAT-TRD-105-24-25DT211125/85133369 Ministry of Railways --
3729. 21-Nov-2025 12:02 PM 15-Dec-2025 03:00 PM 15-Dec-2025 03:00 PM Design, supply, erection, Testing and commissioning of 25KV,50HZ, Single phase AC traction overhead equipment with 65sq.mm caternary wire and 107sq.mm HDG copper contact wire, LT supply transformer stations including modifications to the existing OHE in connection with proposed bye pass line with ROR between Mustabada (MBD) and Rayanapadu (RYP) - (BALANCE WORKS) in Vijayawada division of South -Central Railway Reg./04-2025-2026-B-252-TRD/85124733 Ministry of Railways --
3730. 08-Dec-2025 12:33 AM 15-Dec-2025 03:00 PM 15-Dec-2025 03:30 PM 132/EE/CSD/2025-26/132/EE/CSD/2025-26/135784 Central Public Works Department (CPWD) --

ध्यान दें : अधिक जानकारी और स्पष्टीकरण के लिए कृपया संबंधित पोर्टल देखें।