क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
4701. |
06-Aug-2025 02:00 PM |
29-Aug-2025 06:00 PM |
01-Sep-2025 09:00 AM |
SUPPLY AND CONSTRUCTION OF LIVING SHELTER (20 MEN) AT UDHAMPUR/6502/OT/NC/71SA/2025-26/2025_ARMY_724793_1 |
IHQ of MoD (Army)-(OSCC) |
 |
4702. |
11-Aug-2025 02:00 PM |
29-Aug-2025 06:00 PM |
30-Aug-2025 09:30 AM |
SUPPLY AND CONSTRUCTION OF FFL OFFRS AND 01 x SUPPLY AND CONSTRUCTION OF FFL JCOs OR IN AVN HANGAR/1043/E-Proc/06/2025-26/Op Wks/2025_ARMY_725527_1 |
IHQ of MoD (Army)-(OSCC) |
-- |
4703. |
08-Aug-2025 05:00 PM |
29-Aug-2025 06:00 PM |
06-Sep-2025 10:00 AM |
REPAIR / MAINT FLOOR, JOINERY, SUNKEN FLOOR, ROOF TREATMENT, FLOOR TILE, ROOF TREATMENT AND CONNETED B/R ITEM OF JNE AND ADJOINING AREA UNDER AGE BR-II OF GE (NORTH) UDHAMPUR/GE/U(N)-62/2025-26/2025_MES_725255_1 |
E-IN-C BRANCH - MILITARY ENGINEER SERVICES |
 |
4704. |
13-Aug-2025 05:00 PM |
29-Aug-2025 06:00 PM |
30-Aug-2025 12:00 PM |
Repairing of two nos D-type quarter having no D/01/002 and D/02/004 allotted in the name of Dipak Dhibar and Ramu Prasad , Sr. Manager (Mining) located at Barachak Colony under Sodepur Area./SDPA/Civil/G-11/25-26/83 Dt-13.08.2025/2025_ECL_341423_1 |
Eastern Coalfields Limited |
-- |
4705. |
13-Aug-2025 05:00 PM |
29-Aug-2025 06:00 PM |
30-Aug-2025 12:00 PM |
Repairing of 03 nos B type quarter (01 no BEQ and 02 nos B type) at DPS more under CKI-SDPR group of Sodepur Area./SDPA/Civil/G-11/25-26/84 Dt-13.08.2025/2025_ECL_341425_1 |
Eastern Coalfields Limited |
-- |
4706. |
13-Aug-2025 05:00 PM |
29-Aug-2025 06:00 PM |
30-Aug-2025 12:00 PM |
Repairing of 02 unit single stroyed C eqv type quaeters at Sheetalpur colliery 4 no near Durga Mandir under CKI-SDPR Group under Sodepur Area./SDPA/Civil/G-11/25-26/85 Dt-13.08.2025/2025_ECL_341447_1 |
Eastern Coalfields Limited |
-- |
4707. |
13-Aug-2025 06:00 PM |
29-Aug-2025 06:00 PM |
30-Aug-2025 10:00 AM |
Dismantling/ disassembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis for the period of 730 days (two years) in CHP Phase 1, Khadia Project (NCL)/KHD/EM/E-Tender/25-26/223 Date 12.08.2025/2025_NCL_341361_1 |
Northern Coalfields Limited |
-- |
4708. |
08-Aug-2025 12:00 PM |
29-Aug-2025 06:00 PM |
30-Aug-2025 06:00 PM |
REPAIR/REPLACEMENT/MAINT OF WATER SUPPLY PIPE LINE, PUMP AND OTHER CONNECTED WORK AT SECTOR B (HARNI AREA) AND WATER SUPPLY INSTALLATION UG SUMP, OHR AND OTHER CONNECTED WORKS AT SEC A AND AND SECTOR C UNDER GE (A) BARODA./8872/2025_MES_725147_1 |
E-IN-C BRANCH - MILITARY ENGINEER SERVICES |
 |
4709. |
05-Aug-2025 06:00 PM |
29-Aug-2025 06:00 PM |
06-Sep-2025 10:00 AM |
SPL REPAIR TO TOILETS IN MT AREA AND TOILETS OF BLDG NO P 1337, P 1299 AND P 1323 OF 234 ARMD ENGR REGT AND PROVN OF IRON GRILL ON THE DRAINAGE LINE OF ALL SQN COOK HOUSE BLDG NO P 201 TO P 204 OF 7 LT CAV AT HISAR MIL STN UNDER GE HISAR/GE(H)-30/2025-26/2025_MES_724560_1 |
E-IN-C BRANCH - MILITARY ENGINEER SERVICES |
 |
4710. |
14-Aug-2025 06:00 PM |
29-Aug-2025 06:00 PM |
30-Aug-2025 11:00 AM |
Supply of coloured coated GI cladding sheets/JPL/CNM/LT/25-26/ 1100012369/2025_JPL_245206_1 |
Jhabua Power Ltd |
-- |